ESC18-01411
| General Inspection | 9/24/2019 | 9/24/2019 | 9/25/2019 11:49:44 AM | | PASS |
|
|
Multiple areas of site work. Water truck on site, no dust or trackout. Lots of materiall on site, will need to watch for blowing plastics and carboard. Roll pan washout on site, stabalized entrance, most workers parked on road.
|
ESC18-01178
| General Inspection | 9/20/2019 | 9/24/2019 | 9/25/2019 10:45:02 AM | P | PASS |
|
|
Landscapers on site, some gravel on road.
|
ESC18-01312
| Aging Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 2:22:47 PM | | PASS |
|
|
Exterior work looks completed. Still needs landscaping.
|
ESC18-01171
| General Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 2:17:04 PM | | PASS |
|
|
Still needs landscaping. Access road still in place.
|
ESC19-00402
| General Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 12:57:17 PM | P | PASS |
|
|
WIP on framing. Trash box on site and being used. All material stored on lot, workers parked on road. Front perimeter controls have been removed, will monitor for trackout and dirt leaving site.
|
ESC18-01432
| General Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 12:47:27 PM | | PASS |
|
|
Site is clean and contained. Rumble bars at entrance, no trackout. Masons are mixing mortar in buckets, no mixer, and are using outpak, no dumped mortar on site. Site is free from loose trash, has been sprayed to keep dust down.
|
ESC19-00034
| General Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 12:11:48 PM | P | FAIL |
|
|
To entrances with no rocks. Lot of trackout, inlets in parking lot no longer protected. Person listed on everything no longere with contractor.
|
ESC18-01053
| General Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 11:59:44 AM | | PASS |
|
|
All homes framed and in different stages of completion. Some homes still need driveways, washout still on site. Every home has its own trash box. Most homes landscaped. Street looks like it has been recently swept. No issues at site.
|
ESC19-00376
| General Inspection | 9/19/2019 | 9/24/2019 | 9/24/2019 11:32:02 AM | P | PASS |
|
|
ACHD right of way and sidewalks have been repaired. Spur road into development installed. Site is graded, all stockpiles and trash removed. Washout still on site. No esc issues.
|
ESC18-01444
| General Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 11:14:49 AM | | PASS |
|
|
hase 1 on east has all buildings framed. Parking lot is scheduled to be paved in a few weeks. Joint trench has just begun on phase 2 to the west. Weeds have grown near wattle acting as natural buffer. No current concrete walk, trash is being cleaned. No blowing dust or trackout.
|
ESC18-01377
| General Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 10:49:54 AM | | PASS |
|
|
Inside the site is all paved and landscaped. New washout on southern lot, also a stockpile of debris.
|
ESC19-00304
| General Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 10:13:20 AM | P | PASS |
|
|
WIP on water lines. Water truck on site. Some dust behind excavators. No major issues.
|
ESC19-00303
| General Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 10:07:35 AM | P | PART |
|
|
No current activity. Some open trenches and stockpiles on site. Entrance to Light Horizon is compacted, DIs need maintenance. Hydrant is on corner, looks like it is where water truck is filling. Lake Hazel is under construction.
|