Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00780 Site Preparation9/3/20199/3/20199/4/2019 2:14:24 PMPPEND
Lots of dust when track steer is operating, none when not. Sent message to RP to do some dust control.
Sidewalks are getting swept.
ESC18-00257 Tracking Control8/30/20199/3/20199/4/2019 10:05:42 AMPFAIL
Stockpiles still uncontained. Dirt is getting on common drive and getting caught in sprinkler water.
ESC17-01126 General Inspection9/3/20199/3/20199/3/2019 2:37:03 PM PASS
Site is fenced and contained. Nothing leaving perimeter.
ESC16-00935 General Inspection9/3/20199/3/20199/3/2019 2:22:44 PM PASS
Driveway work has begun. First pour and heaters installed, still needs second pour.
Washout on lot up the road,
ESC18-00920 General Inspection9/3/20199/3/20199/3/2019 2:21:54 PM PART
No ESC issues at site.
Rubbish pile still on site, no perimeter controls installed yet.
Washout is on site.
ESC18-01313 Aging Inspection9/3/20199/3/20199/3/2019 12:41:35 PM CANC
ESC18-01313 DOC - Permit Finaled9/3/20199/3/20199/3/2019 12:41:30 PMPPASS
ESC18-00429 General Inspection9/3/20199/3/20199/3/2019 12:00:40 PM PASS
All areas have been stabalized. BLD still open.
ESC18-01165 Aging Inspection9/3/20199/3/20199/3/2019 11:54:32 AM CANC
ESC18-01165 DOC - Permit Finaled9/3/20199/3/20199/3/2019 11:54:26 AMPPASS
ESC18-00110 General Inspection9/3/20199/3/20199/3/2019 10:51:17 AM PASS
Home and landscaping completed. Driveway is done. No ESC issues.
ESC18-00020 General Inspection8/29/20199/3/20199/3/2019 10:37:55 AMPPASS
Overall site is clean. One bad lot, pictures sent to Kyle and Justin
ESC19-00161 BMP Violation9/3/20199/3/20199/3/2019 10:26:13 AMPFAIL
Lots of dirt on road and sidewalk. Pictures sent to kyle and justin. Follow up scheduled.
ESC18-00293 Site Final9/3/20199/3/20199/3/2019 10:06:45 AMPPASS
ESC18-00277 Site Final9/3/20199/3/20199/3/2019 10:06:29 AMPPASS
ESC18-00164 General Inspection9/3/20199/3/20199/3/2019 9:42:53 AM PASS
WIP on lower area, looks like excavation for seepage bed, lots of drain rock on site and being delivered. Rock entrances installed, haul roads have been watered. Non active areas of site are crusted, no blowing dust.