Inspections for the day of: Monday, September 30, 2019.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01470 General Inspection9/30/20199/30/201910/1/2019 11:17:33 AM FAIL
Met withj RP on site.
Washout has been dumped on vacant lot, let him know and they will clean.
Trash trailer on site, crew also on site picking up scrap lumber.
Follow up scheduled for 10-4
ESC17-00471 Aging Inspection9/30/20199/30/201910/1/2019 10:44:46 AM PASS
WIP on second home. Lumber scraps piled in front, backfill is on other lots. Nothing leaving site.
ESC18-00365 Aging Inspection9/30/20199/30/20199/30/2019 3:14:37 PM CANC
ESC18-00365 DOC - Permit Finaled9/30/20199/30/20199/30/2019 3:14:27 PMPPASS
expired
ESC17-00954 General Inspection9/30/20199/30/20199/30/2019 3:13:21 PM PASS
No esc issues at site. Talked to John about removing old destroyed snake bags, he is after builders who ran them over to remove them.
ESC18-00540 General Inspection9/30/20199/30/20199/30/2019 3:02:34 PM PASS
Landscaping in progress.
ESC18-01620 General Inspection9/30/20199/30/20199/30/2019 2:57:52 PM PASS
Landscaping in progress.
ESC17-01469 Aging Inspection9/30/20199/30/20199/30/2019 2:16:12 PM CANC
ESC17-01469 DOC - Permit Finaled9/30/20199/30/20199/30/2019 2:16:04 PMPPASS
expired.
ESC16-00353 General Inspection9/30/20199/30/20199/30/2019 2:12:02 PM PASS
No new activity.
ESC18-01601 General Inspection9/30/20199/30/20199/30/2019 1:13:25 PM CANC
ESC18-01601 DOC - Permit Finaled9/30/20199/30/20199/30/2019 1:11:41 PMPPASS
ESC19-01313 Site Preparation9/27/20199/30/20199/30/2019 12:56:25 PMAPASS
Met with foreman on site. Scope of work for first phase is to dredge silt out of pool right along warm springs avenue. Water is being pumped into vegetative area to west, no water wikll make it to river.
ESC19-01069 Site Preparation9/30/20199/30/20199/30/2019 11:51:56 AMPFAIL
Work began without site prep inspection.
No permit sign posted. No perimeter BMPs, back of lot borders greenbelt, stockplles are within feet of manucared area around pathway.
Inlets on Barber Valley are protected, stabalized entrance installed.
ESC19-00371 General Inspection9/30/20199/30/20199/30/2019 11:29:57 AMPPASS
Work hasn't begun on road for core drilling. Excavator crew working on bottom of road. Veasy has begun hydroseeding upper area. Water truck was on site spraying stockpiles. Outlet pipe on pond is armored.
ESC18-01654 General Inspection9/30/20199/30/20199/30/2019 10:09:39 AM CANC
ESC18-01654 DOC - Permit Finaled9/30/20199/30/20199/30/2019 10:09:34 AMPPASS
ESC19-00345 General Inspection9/30/20199/30/20199/30/2019 9:49:35 AMPPASS
Site is sitting idle, Materials for waterl lines staged on site. Lots of stockpiles and no ground cover. No dust at time of inspection.
ESC18-01038 DOC - Permit Finaled9/30/20199/30/20199/30/2019 9:30:25 AMPPASS
ESC18-00939 Site Final9/30/20199/30/20199/30/2019 9:29:46 AMPPASS
ESC18-01358 DOC - Permit Finaled9/30/20199/30/20199/30/2019 9:18:58 AMPPASS
ESC18-01365 DOC - Permit Finaled9/30/20199/30/20199/30/2019 9:18:43 AMPPASS
ESC18-01363 DOC - Permit Finaled9/30/20199/30/20199/30/2019 9:18:25 AMPPASS
ESC19-00328 DOC - Permit Finaled9/30/20199/30/20199/30/2019 9:17:22 AMPPASS
ESC19-00327 DOC - Permit Finaled9/30/20199/30/20199/30/2019 9:17:13 AMPPASS