Inspections for the day of: Wednesday, September 5, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00416 General Inspection9/5/20189/5/20189/5/2018 2:30:23 PM PASS
ESC17-01597 General Inspection9/5/20189/5/20189/5/2018 12:52:12 PM PASS
Will final when building permit closed.
ESC17-01594 General Inspection9/5/20189/5/20189/5/2018 12:43:56 PM PASS
Will final after engineer sign off and building permit closed.
ESC17-01567 General Inspection9/5/20189/5/20189/5/2018 12:12:03 PM CANC
ESC17-01334 Aging Inspection9/5/20189/5/20189/5/2018 12:03:57 PM CANC
ESC17-01334 DOC - Permit Finaled9/5/20189/5/20189/5/2018 12:03:49 PMPPASS
ESC18-01071 General Inspection9/5/20189/5/20189/5/2018 11:49:13 AMPPASS
Area is clean. Concrete washout will need a stabalized entrance, is located in back of lot. No home work yet.
ESC17-01377 Aging Inspection9/5/20189/5/20189/5/2018 11:46:59 AM CANC
ESC17-01377 DOC - Permit Finaled9/5/20189/5/20189/5/2018 11:46:36 AMPPASS
ESC17-00519 General Inspection9/5/20189/5/20189/5/2018 10:49:00 AMPPASS
ite prep work complete. Roads and sidewalks in place. No homesite work has begun. Power plus is on site.
ESC17-01360 General Inspection9/5/20189/5/20189/5/2018 10:40:50 AMPPASS
Multiple homes under construction. Community BMPs in place, central concrete washout in area. Some landscaping is complete. Homes have their own trash boxes, no garbage blowing around site.
ESC18-00983 General Inspection9/5/20189/5/20189/5/2018 10:22:02 AMPPART
Entrance onto tiger lilly is blocked off. Water tank on site. Grading is currently on flat below hill. No stabalization or hillside BMPs installed.
Lots of dust on grubbing, talked with operator, water wagon was on way down hill. Will need to continue to monitor for dust an installation of hillside BMPs.