Inspections for the day of: Friday, September 6, 2019.
Number of inspections: 28
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00994 General Inspection9/6/20199/6/20199/6/2019 2:12:14 PMPPASS
Post rainfall inspection.
No blow outs onto Bogus Basin Rd, no issues.
ESC17-00847 General Inspection9/6/20199/6/20199/6/2019 2:03:47 PM CANC
ESC19-00770 General Inspection9/6/20199/6/20199/6/2019 2:03:39 PMPPEND
Running trucks from lot and up road across street. Lots of trackout, need tyo sweep end of work day.
ESC18-01309 Aging Inspection9/6/20199/6/20199/6/2019 1:50:47 PM CANC
ESC18-01309 DOC - Permit Finaled9/6/20199/6/20199/6/2019 1:50:40 PMPPASS
ESC17-00315 General Inspection9/6/20199/6/20199/6/2019 1:46:38 PM PASS
ESC18-01531 General Inspection9/6/20199/6/20199/6/2019 12:37:28 PMPFAIL
Washout for wall dumped. Message sent to RP.
Follow up scheduled.
ESC17-00842 General Inspection9/6/20199/6/20199/6/2019 12:34:57 PMPPASS
Rainfall inspection.
Site is clean, no runoff issues.
ESC15-00853 General Inspection9/6/20199/6/20199/6/2019 12:30:12 PM PASS
No muddy runoff, road clean. Large dumpster on site, trash cleaned up. Onsite materials relocated to west end, looks like they are getting ready for next phase of townhomes.
ESC17-01009 General Inspection9/6/20199/6/20199/6/2019 12:24:48 PM PASS
No runoff to hill rd. Site contained.
ESC17-01287 General Inspection9/6/20199/6/20199/6/2019 12:24:22 PM PASS
No runoff from site.
ESC18-01550 General Inspection9/6/20199/6/20199/6/2019 12:01:23 PMPPASS
Owner talked to George and got RP situation resolved, George will be RP. Street was cleaned, washout and trash removed.
Called techs and let them know to lift hold.
ESC19-00376 General Inspection9/6/20199/6/20199/6/2019 11:25:04 AMPPASS
Wood Bros on site prepping road bed on street for patching.
ESC18-01550 General Inspection9/6/20199/6/20199/6/2019 11:06:28 AMPCANC
ESC18-01243 Site Final9/4/20199/6/20199/6/2019 11:06:10 AMAPASS
Fees paid, mess cleaned up.
ESC18-01245 BMP Violation9/3/20199/6/20199/6/2019 10:57:51 AMAPASS
check that frontage lot has been cleaned up (dumped washout, debris, trash, landscaping materials & pallets) and doesn't have trackout to Dawn
ESC18-01353 Aging Inspection9/6/20199/6/20199/6/2019 10:44:44 AM PASS
Addition framed, no disturbances, is above garage.
ESC18-00804 General Inspection9/6/20199/6/20199/6/2019 10:28:12 AM PASS
WIP, site is below grade, no issues.
ESC18-00492 General Inspection9/6/20199/6/20199/6/2019 10:24:14 AM CANC
ESC18-00492 DOC - Permit Finaled9/6/20199/6/20199/6/2019 10:19:16 AMPPASS
ESC19-00324 General Inspection9/6/20199/6/20199/6/2019 9:55:06 AMPPASS
Post rainfall inspection.
Looks like storm center missed area. Rain acted as dust control, no issues.
ESC18-00609 Aging Inspection9/6/20199/6/20199/6/2019 9:47:16 AM PASS
WIP on framing, no esc issues.
ESC18-00607 Aging Inspection9/6/20199/6/20199/6/2019 9:46:57 AM PASS
WIP on framing, no esc issues.
ESC19-00371 General Inspection9/6/20199/6/20199/6/2019 9:32:23 AMPPASS
Post rainfall inspection, report of 1" rain in 20 minutes.
RP on site with M3 reps.
SOme damage to pond at lower entrance, issue was water jumped curb from road, not from site.
Site absorbed water, no issues or blowouts. Syman on site checking BMPs, will add gravel bags to gutters.
More entrance rock on site, water line will need to be tied in in middle of entrance, will fix entrance after that is completed.
Will continue to clean streets of trackout.
ESC18-01209 Aging Inspection9/6/20199/6/20199/6/2019 9:08:43 AM CANC
ESC18-01209 DOC - Permit Finaled9/6/20199/6/20199/6/2019 9:08:32 AMPPASS
ESC17-01595 General Inspection9/6/20199/6/20199/6/2019 9:00:08 AM PART
Road clean, sidewalk covered in dirt.
ESC17-01488 General Inspection9/6/20199/6/20199/6/2019 8:29:07 AM CANC