ESC18-01255
| General Inspection | 9/9/2019 | 9/9/2019 | 9/10/2019 2:48:36 PM | | CANC |
|
|
|
ESC17-01236
| Aging Inspection | 9/9/2019 | 9/9/2019 | 9/10/2019 9:42:14 AM | | PASS |
|
|
still hasn't begun
|
ESC18-00861
| Aging Inspection | 9/9/2019 | 9/9/2019 | 9/10/2019 9:31:00 AM | | CANC |
|
|
|
ESC17-00406
| Aging Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 2:53:27 PM | | PASS |
|
|
Exterior work completed, no esc issues at site.
|
ESC18-01171
| General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 2:34:09 PM | | PASS |
|
|
Site is contained. There still is a road leading to back yard.
|
ESC18-00371
| Aging Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 2:23:09 PM | | PASS |
|
|
Contained, no esc issues.
|
ESC18-01167
| General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 1:00:59 PM | | PASS |
|
|
SIte is contained. Multiple road closures, acting as storage areas. No dirt leaving site, no esc issues.
|
ESC18-01168
| General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 1:00:09 PM | | PASS |
|
|
Wip on footings, 30' or so below grade. Ecopan on site, no issues.
|
ESC18-00164
| General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 12:00:54 PM | P | PASS |
|
|
Post rainfall inspection. No activity on site. Site is terraced, all water flowed to bottom. Seepage bed is open, looks like all water was obsorbed.
|
ESC19-00324
| General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 11:32:16 AM | P | PASS |
|
|
Post rain inspection. Site held all water, no rilling or blowouts. Grading crew is now active on site. Sewer crew is nearing completion.
|
ESC18-00893
| General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 10:43:12 AM | | PASS |
|
|
Landscaping walls alonge perimeter, still nees grass or stabilization. No esc issues
|
ESC17-00774
| General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 10:39:35 AM | | PASS |
|
|
Creek is dry, banks vegetated. Looks like someone has started to clean the trash.
|
ESC17-01491
| General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 10:26:20 AM | | PASS |
|
|
Revegetated, no issues.
|
ESC19-00371
| General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 10:09:41 AM | P | PASS |
|
|
Post rainfall inspection. No esc issues with site. Did site walk through, no blowouts or rilling. Gravel bags and channel armoring completed on lower pond, no issue from rain. Upper section held all water, no blowouts down road on site. Sewer crew on site now, may have trackout issues at end of day.
|
ESC18-00203
| Aging Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 8:37:59 AM | | PASS |
|
|
Inspected by BLD zone inspector
|
ESC18-01071
| General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 8:37:20 AM | | CANC |
|
|
|
ESC18-01184
| General Inspection | 9/9/2019 | 9/9/2019 | 9/9/2019 8:27:15 AM | | CANC |
|
|
|
ESC18-01184
| DOC - Permit Finaled | 9/9/2019 | 9/9/2019 | 9/9/2019 8:27:10 AM | P | PASS |
|
|
|