BLD-Final | 11/18/2008 | 11/18/2008 | 11/19/2008 | P | PASS |
Dave Hannah
|
|
|
The zoning inspection is done. Please call me for lock box information.
Thanks, Jacob Phone #: ###-#### Internet Inspection Request from: Jacob Florence
|
DOC - Permit Finaled | 11/19/2008 | 11/19/2008 | 11/19/2008 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 11/14/2008 | 11/14/2008 | 11/14/2008 | P | NR |
Dave Hannah
|
|
|
Dave, I believe this job was re-permitted so we don''t need a zoning inspection. Please call me for the code to the house. Thanks, Jacob. Phone #: ###-#### Internet Inspection Request from: Jacob Florence I scheduled a zoning inspection
|
BLD-Final | 10/31/2008 | 10/31/2008 | 10/31/2008 | P | NR |
Dave Hannah
|
|
|
Jacob Phone #: ###-#### needs zoning final
|
BLD-Framing/Rough-in | 6/17/2008 | 6/17/2008 | 6/17/2008 | P | PASS |
Dave Hannah
|
|
|
Jacob; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Energy code compliance | 6/17/2008 | 6/17/2008 | 6/17/2008 | P | PASS |
Dave Hannah
|
|
|
Jacob; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Energy code compliance | 6/16/2008 | 6/16/2008 | 6/16/2008 | P | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jacob Florence needs mec r/i c/n items completed and signed off
|
BLD-Framing/Rough-in | 6/11/2008 | 6/12/2008 | 6/12/2008 | A | PART |
Dave Hannah
|
|
|
Truss eng. is on the bath tub. Thanks, Jacob Phone #: ###-#### Internet Inspection Request from: Jacob Florence ok to insulate
|
BLD-Framing/Rough-in | 6/11/2008 | 6/11/2008 | 6/11/2008 | P | FAIL |
Dave Hannah
|
|
|
Concrete is wet, please endter house through window well. Phone #: ###-#### Internet Inspection Request from: Jacob Florence still need truss engineering
|
BLD-Framing/Rough-in | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | FAIL |
Dave Hannah
|
|
|
Internet Inspection Request from: Jacob Florence c/n on site do not insulate
|
BLD-Conference | 3/14/2008 | 3/14/2008 | 3/14/2008 | P | PASS |
Dave Hannah
|
|
|
ok to finish roof sheeting and dry in roof but must resubmit plans
|
BLD-Foundation | 2/7/2008 | 2/7/2008 | 2/7/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/7/2008 at 8:44:58 AM. Contact: ###-####.
|
BLD-Footing | 2/5/2008 | 2/5/2008 | 2/5/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/5/2008 at 11:01:32 AM. Contact: ###-####.
|