Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD10-00885
StatusFinaled
Name ALASKA CENTER LTD PARTNERSHIP
Site Address 1020 W MAIN ST Unit: 104
Project NameALASKA BLDG-1ST FLR
Customer Number 
ePlanReviewNo
Description
(BOISE STATE UNIVERSITY)(SUITE #104) Remodel changing occupancy use from retail to office/classroom on the first floor of 1,654 sq. ft. plus a new 248 sq. ft. mezzanine, a total of 1,902 sq. ft. space within existing building. Work to include structural frame infill between existing beam support system to construct a 248 sq. ft. mezzanine and code compliant stairway to mezzanine per plans and attached structural engineering design data. Install 42" high guard along open side of stairs and mezzanine and install handrail on both sides of stairs. Provide 1-hour fire resistive construction on the bottom of the stair stringers (2 layers, 5/8", 'X') and 1-hour walls at storage under stair. Upgrade electrical, sprinkler, interior finishes and millwork, add new door and hardware to access reading room from atrium and upgrades of 20% of cost of project toward accessibility upgrade. NOTE: This building is fully fire sprinklered for substitution of one-hour construction. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/17/20106/18/20106/18/2010PPASS
DetailsDave Hannah
Jim Phone #: ###-####
DOC - Permit Finaled6/18/20106/18/20106/18/2010PPASS
DetailsDave Hannah
FIRE-Final Inspection6/17/20106/18/20106/18/2010APASS
DetailsForrest France
Corrections completed, fire life safety passed.
BLD-Final6/16/20106/17/20106/17/2010PCANC
DetailsDave Hannah
Jim Campbell Phone #: ###-####
FIRE-Final Inspection6/16/20106/17/20106/17/2010AFAIL
DetailsForrest France
Missing hardware and signage at the main entry exit door, hardware at two other locations is not yet installed, finishes underway, project is not in condition for final at this time. Discussed reschedule with contractor on site.
BLD-Framing/Rough-in5/21/20105/21/20105/21/2010APASS
DetailsDave Hannah
Jim- Phone #: ###-####
BLD-Framing/Rough-in5/20/20105/20/20105/21/2010PFAIL
DetailsDave Hannah
Jim- Phone #: ###-#### legger needs nails or stru screws