BLD-Final | 10/31/2012 | 10/31/2012 | 10/31/2012 | P | PASS |
Mike Jordan
|
|
|
need final pass for perm occ, part was pending zoning which passed on 10/18/12. Ok for perm. occ.
|
BLD-Final | 10/17/2012 | 10/17/2012 | 10/17/2012 | P | PART |
Mike Jordan
|
|
|
kevin - call 30 mins prior to meet Phone #: ###-####. pending zoning.
|
FIRE-Final Inspection | 10/17/2012 | 10/17/2012 | 10/17/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 6/27/2012 | 6/27/2012 | 6/27/2012 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to sign off when the exit sign is replaced as discussed and the project related fire alarm permit.
|
FIRE-Final Inspection | 3/19/2012 | 3/20/2012 | 3/20/2012 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm permits finaled, one of which was just resubmitted for plan modifications. I performed the life safety inspection to address any trouble spots and found most of the exit signs non-operable. The fire extinguisher placement is ok.
|
BLD-Other | 2/21/2012 | 2/22/2012 | 2/22/2012 | A | PASS |
Jim Sly
|
|
|
kevin Phone #: ###-#### Last of the New construction Grid......OK.
|
BLD-Framing/Rough-in | 2/7/2012 | 2/7/2012 | 2/7/2012 | P | PASS |
Mike Jordan
|
|
|
kevin Phone #: ###-####
|
BLD-Wall cover | 1/24/2012 | 1/24/2012 | 1/24/2012 | P | PASS |
Mike Jordan
|
|
|
Ceiling cover--- Kevin Phone #: ###-####. Ceiling grid Phase 2 ok.
|
BLD-Conference | 1/20/2012 | 1/23/2012 | 1/23/2012 | A | DONE |
Mike Jordan
|
|
|
Kevin Phone #: ###-####. Discussed ceiling grid issues with contractor.
|
BLD-Framing/Rough-in | 1/5/2012 | 1/5/2012 | 1/5/2012 | P | PASS |
Mike Jordan
|
|
|
Kevin Phone #: ###-####. Interior steel stud framed walls in IT room phase 2.
|
BLD-Other | 12/7/2011 | 12/7/2011 | 12/7/2011 | P | PART |
Mike Jordan
|
|
|
ceiling insp//kevin Phone #: ###-####. Phase 2 ok pending fire sprinkler.
|
BLD-Framing/Rough-in | 11/22/2011 | 11/23/2011 | 11/23/2011 | A | PASS |
Mike Jordan
|
|
|
kevin - building will be locked down at 1:30 Phone #: ###-####. Interior steel stud walls at breakroom, phase 2, no grid.
|
BLD-Framing/Rough-in | 11/18/2011 | 11/18/2011 | 11/18/2011 | P | PASS |
Mike Jordan
|
|
|
kevin Phone #: ###-####. Interior steel stud framed wall only, no grid, phase 2, north half at gridline F.
|
BLD-Final | 8/29/2011 | 8/30/2011 | 8/30/2011 | A | PART |
Mike Jordan
|
|
|
kevin - final for south half only Phone #: ###-####. This is a phased project, did a walk thru at south east portion only, area has been marked on approved plans.
|
FIRE-Final Inspection | 8/29/2011 | 8/29/2011 | 8/29/2011 | P | PART |
Troy Cobbley
|
|
|
See the city approved plans for the phase 1 area, southeast corner of the building, where life safety has been passed. It has been marked in red ink with todays date.
|
FIRE-Final Inspection | 8/25/2011 | 8/26/2011 | 8/26/2011 | A | CANC |
Troy Cobbley
|
|
|
Kevin Smith Phone #: ###-#### Not ready for a final inspection due to the project related fire alarm permit.
|
BLD-Other | 8/23/2011 | 8/24/2011 | 8/24/2011 | A | PART |
Mike Jordan
|
|
|
kevin - ceiling grid - please call 1/2 hr prior Phone #: ###-####. Ceiling grid ok pending fire sprinklers.
|
BLD-Framing/Rough-in | 7/29/2011 | 7/29/2011 | 7/29/2011 | P | NR |
Tony Young
|
|
|
kevin Phone #: ###-####,, need trades 1st for grid inspection,, no inspection made,, crews were gone for day
|
BLD-Framing/Rough-in | 7/8/2011 | 7/11/2011 | 7/11/2011 | A | PART |
Mike Jordan
|
|
|
kevin Phone #: ###-####. Interior steel stud framed walls only. ok to rock top portion of new warehouse walls only, remainder pending electrical rough in inspection. No grid.
|