Permit Information
Permit NumberBLD11-01445
StatusFinaled
Name RADIX CONSTRUCTION INC
Site Address 9632 W EMERALD ST Unit: C
Project NameCROWELL'S UPHOLSTERY
Customer Number 
ePlanReviewNo
Description
(CROWELL'S UPHOLSTERY) **9-12-11 PLAN MODOFICATION TO INCLUDE: INSTALL NEW TUBE STEEL LOW WALLS IN THE ENTRY SAMPLE AREAS; NEW SCONCE LIGHTS AND MIRROR IN THE RESTROOMS; NEW FIRESTOP DETAIL FOR PENNETRATIONS IN THE TENANT SEPARATION WALLS; AND OTHER MISC. WORK PER APPROVED PLANS. SRZ ** To build-out a 4,850 sq.ft. tenant space (building one, suites C & D) for a manufacturing upholstery shop and office/warehouse in an existing building per approved plans. The shell building was constructed under BLD98-02497. Work to include: construction of two 2-hour rated fire barrier walls, construction of interior walls to divide this space into display areas, office areas, production/manufacturing areas, and two fully accessible men's and women's restrooms; construct a new storage platform above the new office per plans; install a new dual height (hi-lo) accessible drinking fountain; suspended ceiling grid system installed per CISCA guidelines; related interior finishes in compliance with chapter 8 of the 2009 IBC; upgrade electrical, mechanical & plumbing to meet tenant needs and comply with current adopted codes and ordinances of Boise City; and all other work per the approved plans, attached plan review report, and all other reviewing agencies approvals. Energy code compliance for the envelope was part of the SHELL permit. Sealing & insulation of ductwork, mechanical and lighting compliance are a part of this permit. A Partial Permit was issued for this space under BLD11-01446. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. NOTE: This building is NOT fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection10/24/201110/25/201110/25/2011APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection10/24/201110/24/201110/24/2011PFAIL
DetailsTroy Cobbley
The duct smoke detector was not ready for inspection. Rescheduled for tomorrow.
BLD-Final10/20/201110/21/201110/21/2011PPASS
DetailsMike Jordan
Late afternoon---John Phone #: ###-####. Will be ok for perm occ. once fire/life/safety has passed.
FIRE-Final Inspection10/20/201110/21/201110/21/2011AFAIL
DetailsTroy Cobbley
Provide for the required testing and corrected mounting location of the duct smoke detector.
BLD-Framing/Rough-in9/12/20119/13/20119/13/2011APASS
DetailsMike Jordan
Fire rated ply has been provided at mezz. All firestop data has been supplied and applied to tenant side.
BLD-Framing/Rough-in9/6/20119/7/20119/7/2011PPART
DetailsMike Jordan
John Phone #: ###-####. Interior steel stud framed walls and soffits, except for areas by south fire barrier walls. Provide fire rated ply at mezz. Still needs to provide approved fire stop systems at south fire barrier wall.
BLD-Energy code compliance9/6/20119/7/20119/7/2011PCANC
DetailsMike Jordan
steve Phone #: ###-####
BLD-Wall cover8/18/20118/22/20118/22/2011APART
DetailsMike Jordan
John Phone #: ###-####. Need additional UL deatils from architect.
BLD-Other8/18/20118/18/20118/18/2011PPART
DetailsMike Jordan
Fire wall inspection--John suppose to be at 9:30am Phone #: ###-####. Went over fire barrier wall detail with contractor.