Permit Information
Permit NumberBLD12-00382
StatusFinaled
Name STEED CONSTRUCTION
Site Address 9101 W FAIRVIEW AVE
Project NamePETERSON TOYOTA
Customer Number 
ePlanReviewYes
Description
(PETERSON TOYOTA - ADDITION AND REMODEL) (DRH11-00254 AND DRH12-00046) (10-24-12 PLAN MODIFICATION TO CHANGE THE EXTERIOR FINISH AT THE LEXUS SHOWROOM, TO MAKE THE LEXUS SHOWROOM LOUNGE LARGER, REVISE CEILING HEIGHTS, RELOCATE AN OVERHEAD DOOR, CHANGE PARAPET CONSTRUCTION, AND TO REVISE THE SOUTH WALL TO REMOVE THE PARAPETS.) The fire sprinkler system is used for building area increase. To construct 2 first story additions (2,476 square feet near the Southeast corner and 2,394 square feet on the North) and an interior 2nd story addition (1,689 square feet) to an existing automobile dealership. Work is to include interior nonbearing walls, 6 restrooms accessible to the disabled, 2 restroom/locker rooms accessible to the disabled, an interior ramp accessible to the disabled, an interior stairway, suspended acoustical ceilings, millwork, exterior concrete stairways, an exterior concrete ramp, new storefront windows, new storefront doors, interior windows, interior doors, and new elevated interior floors. A new Class A roofing assembly with foam plastic insulation and a 5/8 inch thick gypsum thermal barrier will be installed on the entire building. A gas fireplace will be installed within a customer lounge area. Work associated with the Southeast addition includes concrete footings and foundations, steel columns and beams, steel moment frames, masonry walls, steel roof joists, a steel roof deck, and a metal stairway. Work associated with the North addition includes concrete footings and foundations, steel columns and beams, steel moment frames, a steel roof deck, and a portal frame. The design for the portal frame is a deferred submittal item. Work associated with the new interior 2nd story includes concrete footings, steel beams and columns, steel floor joists, steel moment frames, a steel pan deck and concrete floor, and metal stairways. New metal stairways are a deferred submittal item. Special inspection is required for epoxy anchors, concrete, welding, bolting, and masonry. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/12/201311/12/201311/12/2013APASS
DetailsMike Jordan
need final passing inspection after electrical perm sign off. Ok for perm occ.
BLD-Final10/31/201311/1/201311/1/2013PPART
DetailsMike Jordan
mike Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. electrical signs perm.
FIRE-Final Inspection10/31/201311/1/201310/31/2013APASS
DetailsTroy Cobbley
Life safety passed
BLD-Ceiling Grid Inspection10/25/201310/28/201310/28/2013APASS
DetailsMike Jordan
mike Phone #: ###-####.
BLD-Framing/Rough-in10/10/201310/10/201310/10/2013PPART
DetailsMike Jordan
Mike ###-####. INterior steel stud walls for new restrooms. Pending electrical and plumbing rough in inspections.
BLD-Final9/19/20139/20/20139/20/2013PPART
DetailsMike Jordan
Mike Phone #: ###-####. Ok to occupy customer lounge.
FIRE-Final Inspection9/19/20139/20/20139/20/2013APART
DetailsTroy Cobbley
Life safety in the Customer Lounge passed
BLD-Final9/17/20139/17/20139/17/2013PPART
DetailsMike Jordan
Mike Phone #: ###-####. sales tower issues resolved. ok to occupy sales tower and scion portion only.
BLD-Final9/13/20139/16/20139/16/2013PNR
DetailsMike Jordan
mike Phone #: ###-####. Provide handrails at sales tower elvated floor.
DOC - Permit Finaled9/16/20139/16/20139/16/2013PPASS
DetailsMike Jordan
FIRE-Final Inspection9/13/20139/16/20139/16/2013PPART
DetailsTroy Cobbley
The "Sales Tower" and "Scion" area life safety passed
BLD-Framing/Rough-in9/12/20139/13/20139/13/2013APART
DetailsMike Jordan
Ceiling grid inspection please-Mike Phone #: ###-####. PAtrs and customer waiting area. Pending electrical rough in inspection.
FIRE-Final Inspection9/4/20139/4/20139/6/2013PDONE
DetailsTroy Cobbley
Mike and I discussed the requirement for the exit discharge lighting for the north exits of the showroom area.
BLD-Ceiling Grid Inspection9/5/20139/5/20139/5/2013PPART
DetailsMike Jordan
mike Phone #: ###-####. Ceiling grid at sales tower and toyota showroom ok. Pending electrical rough in inspection.
BLD-Framing/Rough-in7/19/20137/19/20137/19/2013PCANC
DetailsTom Arcoraci
BLD-Framing/Rough-in7/18/20137/19/20137/19/2013APART
DetailsTom Arcoraci
mike Phone #: ###-#### wip ok
FIRE-Conference7/12/20137/12/20137/12/2013PDONE
DetailsTroy Cobbley
This inspection was for approval to cover the overbuild area above the Scion area. The non-rated wood has been covered by sheet rock as discussed.
BLD-Framing/Rough-in6/28/20137/1/20137/1/2013APART
DetailsMike Jordan
Mike Phone #: ###-####. Area 2 and 3 new store front framing. Previous issues resolved, engineers issues were repaired. Pending trades prior to cover.
FIRE-Conference6/27/20136/28/20136/28/2013ADONE
DetailsTroy Cobbley
Mike and I discussed the non-fire rated wood that has been installed in the parapet and options to allow it to remain.
BLD-Framing/Rough-in6/26/20136/27/20136/27/2013APART
DetailsMike Jordan
mike Phone #: ###-####. Structural steel beams and columns as well as steel stud framing for new exterior storefront in areas 2 and 3. All work per resubmittals and RFI. Work in progress still needs trades inspection. Needs to remove the OSB sheeting and provide fire treatred ply at parapet suuport.
BLD-Ceiling Grid Inspection5/28/20135/28/20135/28/2013PPASS
DetailsMike Jordan
rick Phone #: ###-####. Grid at canopy at lexus dealership ok.
BLD-Final5/9/20135/10/20135/10/2013PPART
DetailsMike Jordan
Area 4 please-Mike Phone #: ###-####. Temp occ for area 4, accounting office ok to occupy. temp. exit ok.
FIRE-Final Inspection5/9/20135/10/20135/10/2013PPART
DetailsTroy Cobbley
The "accounting" area and the temporary exit corridor has passed life safety.
BLD-Framing/Rough-in5/9/20135/10/20135/10/2013APASS
DetailsMike Jordan
Ceiling grid inspection please-Mike Phone #: ###-####. grid at hallway an temp exit at area 4.
BLD-Final5/6/20135/7/20135/7/2013PPART
DetailsTom Arcoraci
Area 4 please-Mike Phone #: ###-#### ok for four
FIRE-Final Inspection5/6/20135/7/20135/7/2013APART
DetailsTroy Cobbley
The "Bull Pen" in Area 4 is ok to occupy.
BLD-Final5/2/20135/3/20135/3/2013APART
DetailsMike Jordan
MIke-Areas 1 & 2 please Phone #: ###-####. Areas 1 and 2 ok to occupy only. Needs to put flushing mechanism on turning side in mens bathroom and firecaulk elec. conduit in 1 hr. exit cooridor at lid.
FIRE-Final Inspection5/1/20135/2/20135/2/2013PPART
DetailsTroy Cobbley
Area #1 lexus showroom/lounge/cafe, area #2 upper/lower mezzanine and area #4 bullpen life safety passed
FIRE-Conference4/30/20135/1/20135/1/2013PDONE
DetailsTroy Cobbley
Mike and I wnet over life safety requirements in the Lexus showroom, upper and lower mezzanine and the Sales Bull Pen.
FIRE-Conference4/26/20134/26/20134/26/2013PDONE
DetailsTroy Cobbley
I forwarded an email to mike with steed construction stating the code sections, IFC 907.4, where the smoke detectors being utilized for door release are required to be connected to the fire alarm system. This is in reference to the door at the bottom of the stairs from the mezzanine.
FIRE-Final Inspection4/23/20134/24/20134/25/2013AFAIL
DetailsTroy Cobbley
Mike actually wanted a conference. Items discussed was the need for emergency lighting in the stairwell from ther mezzanine and an exit sign at the bottom exterior exit door, provide verification from plan review that door 112B can be deleted, provide code compliant exit path from the new "Accounting" area (can not exit through open construction), provide a FIR permit for the connection of fire sprinkler control valves to the existing fire alarm system (new anti-freeze system and new riser).
BLD-Ceiling Grid Inspection4/17/20134/18/20134/18/2013APASS
DetailsMike Jordan
tony Phone #: ###-####. Ceiling grid, acct offices ok.
BLD-Ceiling Grid Inspection4/11/20134/12/20134/12/2013APART
DetailsMike Jordan
Mike Phone #: ###-####. Provide additional support wire to all diffusers. Also submitted a wriiten correction notice to provide code compliant door hardware on egress side of all doors per sheet A8.1, plan reviewers note and per architect.
BLD-Framing/Rough-in3/22/20133/25/20133/25/2013APASS
DetailsMike Jordan
mike Phone #: ###-####. New store front at grids 3 to 5 per RFI #133. Will have deferred submittAL scanned into job.
BLD-Framing/Rough-in2/22/20132/22/20132/22/2013PPASS
DetailsMike Jordan
MIke Phone #: ###-####. INterior steel stud framing for lexus service and waiting room ok.
BLD-Framing/Rough-in2/19/20132/20/20132/20/2013APASS
DetailsMike Jordan
mike Phone #: ###-####. Area 1 framing fro drive- thru soffit. Area 4 framing for new storefront, north west end per deffered submittlas and RFI for in place work at this area from structural engineer. Will have submittals scanned into job.
BLD-Framing/Rough-in2/19/20132/19/20132/19/2013PCANC
DetailsMike Jordan
mike Phone #: ###-####. Moved to am.
BLD-Framing/Rough-in2/1/20132/1/20132/1/2013PPART
DetailsMike Jordan
mike Phone #: ###-####. Area 4 salesmans lockerrooms and area 2 mezz.
BLD-Framing/Rough-in1/22/20131/22/20131/22/2013PPART
DetailsJim Sly
mike Phone #: ###-####
Engineered metal trusses at Lexus soffit/facade OK per Engineering.
BLD-Framing/Rough-in1/17/20131/18/20131/18/2013APASS
DetailsJim Sly
Mike Phone #: ###-####. Interior steel stud framing in area 4 for accounting offices and for hallway behind accounting offfices. Also reviewed all special inspection reports to date.
BLD-Framing/Rough-in10/9/201210/9/201210/9/2012PPASS
DetailsTom Arcoraci
Mike Phone #: ###-#### service bay locker room ok after plumbing insp
BLD-Framing/Rough-in9/17/20129/17/20129/17/2012PPASS
DetailsMike Jordan
Mike Phone #: ###-####. interio steel stud framed walls for bull pen restrooms.
BLD-Foundation8/9/20128/9/20128/9/2012PPART
DetailsMike Jordan
Pouring at 1 footing/foundation - -Mike Phone #: ###-####. Special inspector on site. Also reviewed special inspection contract and verified the special inspection agency is working for the owner.
BLD-Foundation8/7/20128/7/20128/7/2012PPART
DetailsMike Jordan
Mike--Poauring at !;00 Phone #: ###-####. Stemwalls at grids 14.1,14.2 and 15.5. South stemwall for lounge, area 1.
BLD-Footing7/31/20128/1/20128/1/2012PPART
DetailsMike Jordan
kim Phone #: ###-####. Area1, column and pier pad footings on grids 14.2 and 16. Footings on grids 14.1, 14.2 and 15.5 and south footing for lounge. Steed super on vacation, contacted concrete sub (Kim) and noted to have sluff cleaned out prior to concrete placement. Verified that thier will be special inspection. Will have steed verify by contract that special inspector is working for owner or design pro when steed super is back.