Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD12-01487
StatusFinaled
Name STEED CONSTRUCTION
Site Address 9101 W FAIRVIEW AVE
Project NamePeterson Toyota Lexus Lube Sho
Customer Number 
ePlanReviewYes
Description
Peterson Toyota Lexus - New Lube Shop and Service Bay Expansion - To construct a 6,280 square foot, one story, service bay addition on the west side of the existing auto dealership; and to construct a 4,150 sq. ft., one story with 2,110 sq. ft. basement lube shop addition. The service bay is on the west side of the existing building and the lube shop is on the south side of the existing building. The additions are constructed of masonry exterior walls and steel structural roof system. This permit also includes related site improvements. This building is fully fire sprinkled. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/31/201311/1/201311/1/2013PPASS
DetailsMike Jordan
mike Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection10/31/201311/1/201310/31/2013APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final9/19/20139/20/20139/20/2013PPART
DetailsMike Jordan
Mike Phone #: ###-####. ok to occupy service bay expansion.
FIRE-Final Inspection9/19/20139/20/20139/20/2013ACANC
DetailsTroy Cobbley
A partial already given for these areas. Waiting for fire alarm to be finished.
FIRE-Final Inspection9/17/20139/17/20139/17/2013PPART
DetailsTroy Cobbley
Life safety in the Service Bay expansion is passed.
FIRE-Final Inspection8/29/20138/30/20138/30/2013APART
DetailsTroy Cobbley
The fire doors in the Lube Bay and the new Service Shop passed inspection. Links are on both sides of the wall and at the deck.
BLD-Final8/27/20138/28/20138/28/2013APART
DetailsMike Jordan
Mike Phone #: ###-####. Temp. final on lube and wash only.
FIRE-Final Inspection8/27/20138/27/20138/27/2013PPART
DetailsTroy Cobbley
Lube Bay and Car Wash life safety complete. The fire door between the Lube Bay and the existing shop area shall remain locked until door has been tested and passed. As of now there are no "links" for activation installed on both sides of the wall at the roof deck as required in NFPA 80.
FIRE-Final Inspection8/22/20138/23/20138/23/2013PPART
DetailsTroy Cobbley
todays inspection was for the Lube Bay and the Service Shop expansion. The life safety will be complete in the Lube Bay when an additional fire extinguisher is provided in the pit and the car wash and the fire door linkages have been installed and tested. The Service Shop life safety needs the fire doors addressed and exit signs, emergency lights and exit discharge lighting provided. This is based on the occupant load exceeding 29 people. See IFC table 1021.2, and 1006.1.

The Lexus drive through is complete as well and can be used.
BLD-Framing/Rough-in7/19/20137/19/20137/19/2013PCANC
DetailsTom Arcoraci
BLD-Framing/Rough-in7/18/20137/19/20137/19/2013APASS
DetailsTom Arcoraci
mike Phone #: ###-####
BLD-Other6/13/20136/13/20136/13/2013PPART
DetailsMike Jordan
grouting at 1:30 - masonary grouting - Mike Phone #: ###-####. top of wall west wall for west shop addition. Special inector on site. Work in progress.
BLD-Other6/7/20136/7/20136/7/2013PNR
DetailsMike Jordan
No masonry today.
BLD-Other6/5/20136/5/20136/5/2013PPART
DetailsMike Jordan
masonary grout//Mike Phone #: ###-####. Work in progress, 16ft. to 20ft. elevation for shop expansion. Special inspector on site.
BLD-Other6/4/20136/5/20136/5/2013ACANC
DetailsMike Jordan
MOved to PM
BLD-Conference6/4/20136/4/20136/4/2013PDONE
DetailsMike Jordan
On site to check on job progress. Noted that lube center is erected and shop expansion is nearly 3/4 erected. Also noted that no inspections were scheduled. Did note that all work has been inspected by special inspection. Noted to contractor that he is still required to schedule inspections with the building dept. While on site walk through lube expansion and observed grout placement on shop expansion from 12ft to 16ft. elevation. Also reviewed all special inspection reports to date.
BLD-Footing3/7/20133/8/20133/8/2013ADEFR
DetailsMike Jordan
gary - pouring at 10:30 Phone #: ###-####. Mti on site.