BLD-Final | 7/26/2012 | 7/27/2012 | 7/27/2012 | P | PASS |
Jim Storey
|
|
|
Please call for access -- Sam Phone #: ###-####
|
FIRE-Final Inspection | 7/26/2012 | 7/27/2012 | 7/27/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 7/9/2012 | 7/11/2012 | 7/11/2012 | A | DEFR |
Jim Storey
|
|
|
after 9am--call 1/2 hr prior--Dean Phone #: ###-#### 408 insp.// pending fire.
|
BLD-Conference | 7/10/2012 | 7/10/2012 | 7/10/2012 | P | PASS |
Tom Arcoraci
|
|
|
DEAN Phone #: ###-#### appears ok after fire
|
FIRE-Final Inspection | 7/9/2012 | 7/10/2012 | 7/10/2012 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing the actual floor layout (mezzanines), resubmit plans and information on the paint room and plating room that shows compliance with IFC chapter 15, provide single action hardware at the exit doors other than the main exit. This includes removing the dead bolts. Remove material/products obstructing doors.
|