Permit Information
Permit NumberBLD13-00016
StatusFinaled
Name JUMP LLC
Site Address 1000 W MYRTLE ST
Project NameJUMP
Customer Number 
ePlanReviewNo
Description
JUMP - Shell permit - To construct the shell portion of the new 240,445 square foot, six story JUMP building project. This permit will include the installation of exterior walls, roofs and soffits, as well as, all portions of the above grade parking garage. To construct all exterior circulation and egress areas, exterior stairways, elevators and mechanical shafts. To complete all mechanical, electrical and machine rooms. To install main mechanical equipment and to rough-in mechanical, plumbing and electrical work. Although the approved plans show scopes of work beyond the shell, it is for reference only. These plans were not reviewed or approved for those scopes of work. Separate tenant improvement permits will be required to finish all core areas and tenant spaces for occupancy. This permit also includes related site improvements. This is a highrise building and is required to be fully fire sprinkled in accordance with NFPA 13. The underground garage was permitted under BLD12-01330. The building superstructure was permitted under BLD12-02320. The building permit to finish the building is BLD13-01634. All construction per the approved plans and attached comment list. PLAN MODIFICATION 6-11-15 – Modification submitted to modify ramp / handrails and other park features.**TLW** JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/28/20183/29/20183/29/2018APASS
DetailsDave Hannah
Victoria Phone #: ###-####
FIRE-Final Inspection3/28/20183/28/20183/28/2018PPASS
DetailsJim Page
Final life fire safety inspection complete.
BLD-Final10/23/201710/24/201710/24/2017ANR
DetailsDave Hannah
Victoria-please call Victoria she has questions about this permit and the camopies permit Phone #: ###-####
BLD-Conference4/28/20164/29/20164/29/2016APASS
DetailsDave Hannah
would like call ahead; Walter Phone #: ###-#### ok to remove exit signs on 6th floor patio cover
BLD-Conference11/23/201511/23/201511/23/2015PPASS
DetailsDave Hannah
Conf requested by Victoria via voicemail, not sure on exact area Phone #: ###-####
BLD-Final11/23/201511/23/201511/23/2015PPART
DetailsDave Hannah
ok for temp occ ok for perm occ after other buildings are finaled and under ground parking garage can be openned
BLD-Conference11/10/201511/12/201511/12/2015APART
DetailsDave Hannah
Victoria Phone #: ###-#### ok to have simplot employees tour site
BLD-Conference10/22/201510/23/201510/23/2015ADONE
DetailsDave Hannah
Victoria Phone #: ###-####
BLD-Conference9/17/20159/18/20159/18/2015APASS
DetailsJim Storey
CJ Phone #: ###-####
BLD-Final8/27/20158/28/20158/28/2015APART
DetailsDave Hannah
CJ Phone #: ###-#### ok for temp occ staff only still not ready for general public.
FIRE-Final Inspection8/27/20158/28/20158/28/2015PPART
DetailsThomas Walsh
Fire and Life-Safety inspection of the JUMP bldg, for TCO of a small amount (10-15) of staff personnel to access the building for start-up purposes - No public access at this time.
Followup inspection from this morning, including covering up some exit signs for exit stairs that are not in service at this time. Fire protection systems and fire alarm systems are fully operational and shall be kept in service at all times. There may be times when systems have to be taken off line for maint. purposes, however these systems shall always be put back into service at the end of shift.
Exit gates have been identified, and fitted with panic hardware. Egress paths are in place, however some of these walkways from the JUMP structure to the public way may be temporary. Temp. exit signs were also posted to aid staff to the nearest exit gate at grade level.
Fire is OK with TCO for this small amount of staff while the building is being completed.
FIRE-Final Inspection8/27/20158/28/20158/28/2015APART
DetailsThomas Walsh
Retest of the exit signs and emergency lighting system for the JUMP bldg, on generator - above ground only - underground parking garage not tested, addressing corrections made from the previous test on 8/21.
All previous items deqautely addressed, The following items should be addressed prior to TCO of office staff;
1. Cover all exit signs (approx. 6) for the northwest exits on the second floor office suite. This exit, and exterior exit stair, will not be used for this partial TCO.
2. Install EM lighting fixture on pole at exit gate, located on 9th street exit.
3. Cover exit signs for parking garage far west stair, that will not be utilized for this partial TCO of office staff only.
NOTE: Pathways from exit stairs, and the pedestrian walkways are currently being poured, and will be inspected later today. East exit gates will also be fitted with panic hardware devices.
FIRE-Final Inspection8/27/20158/27/20158/27/2015PPART
DetailsThomas Walsh
Preliminary walk through of JUMP structure to see changes made to egress signs, walking surfaces, etc. from last inspection. An early morning retest of the EM lighting and exit signage off the generator is scheduled for 8/28 am. Some of the exit stairs (parking garage) are not completed yet, but are scheduled to be done also by 8/28. TCO for a small group of emplyees for use of the JUMP building is being proposed next week, pending successful completion of the EM light retest.
FIRE-Final Inspection8/18/20158/21/20158/21/2015APART
DetailsThomas Walsh
Exit sigage and emergency egress lighting for JUMP building, including A/G parking structure, Helix, and associated rooms that make up the JUMP bldg. Test was performed off of generator. All areas tested OK, except as follows;
1. Install exit signs at center stairs (2) in parking structure to clarify exit stairs
2. parking structure level 1 - west side lights not working.
3. Exit signs and EM lights nt working for level 2 office area.'
4.Stair A03B not lit - still under construction.
5. 5th floor kitchen area not lighted.
6.restrooms at multipurpose room not lit.
7. 4th floor frieght elevator lobby not lit.
8. Mech. mezzanine at Inspiration room not lighted.
9. Temp exit signs needed at grade level to direct personnel to exit gates, that are still not present.
10. Egress lighting along east exits not complete yet.
FIRE-Final Inspection8/18/20158/20/20158/20/2015PPART
DetailsThomas Walsh
Meeting to review egress plan prior to tomorrow'smeans of egress inspection with exit sigange and emergency lights off the generator.
FIRE-Conference8/12/20158/14/20158/14/2015ADONE
DetailsThomas Walsh
Meeting with GC and electrical contractors to review upcoming exit signage and emergency lighting test, which will be scheduled for early morning (5am) to get an accuarte assessment of EMs under dusk conditions, since most of the egress from the building is outside, or open to the outside.
FIRE-Conference8/11/20158/12/20158/12/2015ADONE
DetailsThomas Walsh
Meeting with Bldg. Dept. (Dave) and Hoffman (ZAC) to review areas of the building that they are looking for TCO for use by staff personnel only (approx. 10-12 persons), to get things setup in the building. No public use at this time. They are shooting for temp. TCO status by next Friday (8/21). A review and inspection of the temp. egress systems will be conducted before next Friday. Fire alarm systems are still being tested, so it is the goal to get fire sprinklers, fire alarm and egress (signs and lighting) completed by then. No use of the U/G parking area is being proposed at this time.
BLD-Conference8/11/20158/12/20158/12/2015ADONE
DetailsDave Hannah
CJ Phone #: ###-####
BLD-Final8/4/20158/7/20158/7/2015APEND
DetailsDave Hannah
part 2; CJ Phone #: ###-####
BLD-Final8/4/20158/6/20158/6/2015APEND
DetailsDave Hannah
part 1; CJ Phone #: ###-####
BLD-Conference8/3/20158/4/20158/5/2015ADONE
DetailsDave Hannah
TJ Phone #: ###-####
BLD-Conference7/30/20157/30/20157/31/2015PPASS
DetailsDave Hannah
CJ Phone #: ###-####
BLD-Conference7/23/20157/24/20157/24/2015ADONE
DetailsDave Hannah
Zach Phone #: ###-####
BLD-Conference7/20/20157/20/20157/20/2015APASS
DetailsDave Hannah
C.J. Phone #: ###-####
BLD-Conference7/13/20157/17/20157/20/2015ACANC
DetailsDave Hannah
C.J. Phone #: ###-####
BLD-Wall cover7/15/20157/16/20157/16/2015APASS
DetailsDave Hannah
Requesting Sheathing inspection for Entry Portal. Please contact Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in7/15/20157/16/20157/15/2015PCANC
DetailsDave Hannah
Requesting sheathing inspection for entry portal please contact RUDY Phone #: ###-#### >> Inspection requested via web by Tim Pendleton Inspection cancelled from web by: Tim Pendleton
BLD-Wall cover3/18/20153/18/20153/18/2015APASS
DetailsDave Hannah
Requesting sheathing inspection for tractor box 02c03, 04c02 and 03d03. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in3/3/20153/4/20153/4/2015APASS
DetailsDave Hannah
Requesting Framing/Sheathing inspection for East Tractor Box. Please contact Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in2/17/20152/18/20152/19/2015APASS
DetailsDave Hannah
Requesting sheathing inspection for level 6 service core. outside sheathing inspection for all tractor boxes excluding east box Please call Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in6/11/20146/12/20146/12/2014APASS
DetailsDave Hannah
Requesting a sheathing inspection for Thursday AM. Multi-Purpose Studio on Level 5 - west and south elevations. Contact Rudy with NWI at ###-####. Phone #: ###-#### >> Inspection requested via web by Noelle Idehara
BLD-Other5/2/20145/2/20145/2/2014PPASS
DetailsDave Hannah
kevin - fire proofing insp Phone #: ###-####
BLD-Framing/Rough-in5/1/20145/1/20145/2/2014APART
DetailsDave Hannah
fire calking rated assembly//###-#### Shane at rooflinekitchen ok
FIRE-Final Inspection5/1/20145/1/20145/1/2014PDEFR
DetailsForrest France
shane - as late as possible please call 1/2 hr prior Phone #: ###-#### * Note- intended for a structural inspection of a rated assembly*
BLD-Conference4/17/20144/18/20144/18/2014APASS
DetailsDave Hannah
Call Joey JKB Construction with comments or questions ###-#### Phone #: ###-#### >> Inspection requested via web by Leonard Dooms
BLD-Framing/Rough-in4/14/20144/15/20144/15/2014APASS
DetailsDave Hannah
Requesting inspection for the following items. Please call Rudy with Northwest Interiors to coordinate inspection ###-####.

1. Exterior Framing Inspection - Inspiration Studio.

2. Exterior Framing Inspection - at grid G around the helix on Level 4 (east and west sides).

3. Sheathing Inspection at Service Core for Levels 1-4 (excluding west and south elevations at just the service elevator). Phone #: ###-#### >> Inspection requested via web by Noelle Idehara
BLD-Framing/Rough-in3/25/20143/25/20143/25/2014PPART
DetailsDave Hannah

requesting exterior framing inspection at the lobby/kitchen. Grid lines 9.4-9.5 Phone #: ###-#### >> Inspection requested via web by Tim Pendleton ok to start ext sheeting
BLD-Framing/Rough-in3/20/20143/21/20143/21/2014APASS
DetailsDave Hannah
requesting exterior sheathing inspection at the kitchen. Grid lines 9.3-9.3a. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Other3/18/20143/19/20143/20/2014PDONE
DetailsDave Hannah
Field walk with special inspector and field superintendent Zac Ross. Zac''s cell is ###-####. Phone #: ###-#### >> Inspection requested via web by Noelle Idehara
BLD-Framing/Rough-in3/11/20143/12/20143/12/2014APART
DetailsJim Sly
Requesting an exterior framing inspection for the Lobby/Kitchen Studio. Phone #: ###-#### >> Inspection requested via web by Noelle Idehara
Insp. of South wall Lobby/Kitch/studio....Rock, ice/water shield, flashing, Vertical aluminum screwed at 8" OC, and Horizontal purlins. OK to install finish product.
BLD-Framing/Rough-in2/17/20142/18/20142/19/2014APASS
DetailsDave Hannah
Need exterior steel stud framing inspection at the kitchen. Grid lines 9.3-9.3a. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton