BLD-Final | 7/8/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Jim Storey
|
|
|
Kc Phone #: ###-####
|
BLD-Final | 6/12/2015 | 6/17/2015 | 6/17/2015 | A | PART |
Jim Storey
|
|
|
JC Phone #: ###-####
|
FIRE-Final Inspection | 6/12/2015 | 6/15/2015 | 6/15/2015 | A | PASS |
Thomas Walsh
|
|
|
Final FLS inspection of Wings A & B for TCO and final sign off. NOTE: Both fire sprinklers and fire alarm systems have been singed off for this area. Emergency lights and exit signs inspected - 90 minute test off of generator. All tested OK. Fire extinguishers - OK Fire lane sign installed. Knox box installed and FD called to lock box with keys installed. No other discrepancies pending - TCO approved by this office.
|
BLD-Final | 6/12/2015 | 6/15/2015 | 6/15/2015 | A | CANC |
Jim Storey
|
|
|
Jesus Phone #: ###-####
|
BLD-Final | 6/12/2015 | 6/15/2015 | 6/15/2015 | A | CANC |
Bob Archibald
|
|
|
JC// wing A & B Phone #: ###-####
|
BLD-Final | 6/11/2015 | 6/12/2015 | 6/12/2015 | P | NR |
Tony Young
|
|
|
JC// wing A & B Phone #: ###-####,, conference only,, need trades 1st,, walk through only
|
BLD-Final | 6/9/2015 | 6/10/2015 | 6/10/2015 | P | NR |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Final | 6/4/2015 | 6/4/2015 | 6/5/2015 | P | PART |
Jim Storey
|
|
|
A, B, C Wings, mechanical support stairwell doors - JC Phone #: ###-#### smoke seals installed
|
BLD-Final | 6/2/2015 | 6/3/2015 | 6/3/2015 | A | PART |
Jim Storey
|
|
|
JC Phone #: ###-#### room doors all ok
|
BLD-Other | 5/19/2015 | 5/20/2015 | 5/20/2015 | A | PART |
Jim Storey
|
|
|
Fire collar // Phone #: ###-#### missing one 3 inch in ele rm west/ fire treat at overheaddoors
|
FIRE-Conference | 5/18/2015 | 5/19/2015 | 5/19/2015 | A | DONE |
Thomas Walsh
|
|
|
Meeting to discuss upcoming fire alarm testing and subsequent occupancy (TCO) of wings A thru D.
|
BLD-Ceiling Grid Inspection | 4/22/2015 | 4/23/2015 | 4/23/2015 | A | PASS |
Jim Storey
|
|
|
1st and 2nd floor wind a b and c // JC Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/24/2015 | 3/25/2015 | 3/25/2015 | A | PASS |
Jim Storey
|
|
|
3rd and 4th A,B, C possibly D // JC Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/3/2015 | 3/3/2015 | 3/3/2015 | P | PASS |
Jim Storey
|
|
|
JC Phone #: ###-#### 2nd floor corridor ceilling hard lid ok
|
BLD-Ceiling Grid Inspection | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PART |
Jim Storey
|
|
|
JC-2nd floor corridor ceiling for cover Phone #: ###-####west end ok to cover hard lids// east end remove ceilling duct in corridor wall needs isolated out/ fire tape / firespk out of lid/ firestop all ceilling penatrations.
|
BLD-Ceiling Grid Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 | P | PART |
Jim Storey
|
|
|
JC-fire caulking for cover 4th floor wing B Phone #: ###-#### elavator rm storage rm no cover all rest ok to cover.
|
BLD-Ceiling Grid Inspection | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | PASS |
Jim Storey
|
|
|
JC-shaft liner ceiling 4th floor stairwell B1 Phone #: ###-####
|
BLD-Other | 12/29/2014 | 12/29/2014 | 12/29/2014 | P | PASS |
Jim Storey
|
|
|
JC-fire caulking soffits-1st floor wings B & A Phone #: ###-####
|
BLD-Other | 12/23/2014 | 12/24/2014 | 12/24/2014 | A | NR |
Jim Storey
|
|
|
fire colcking first floor wing a // Jc Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2014 | 12/15/2014 | 12/15/2014 | A | PASS |
Jim Storey
|
|
|
Gary Phone #: ###-#### 2nd floor a bld drops ok to cover
|
BLD-Energy code compliance | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | PASS |
Jim Storey
|
|
|
insulation third floor wing C and D// JC Phone #: ###-####coridor
|
BLD-Ceiling Grid Inspection | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | PASS |
Jim Storey
|
|
|
second floor wing D// JC Phone #: ###-####
|
BLD-Other | 11/28/2014 | 12/1/2014 | 12/1/2014 | A | FAIL |
Jim Storey
|
|
|
closer to noon. fire colt. blockin// JC Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/28/2014 | 11/28/2014 | 11/28/2014 | A | NR |
Jim Storey
|
|
|
brett - ###-#### - first floor wing b
|
BLD-Ceiling Grid Inspection | 11/18/2014 | 11/19/2014 | 11/19/2014 | A | PART |
Jim Storey
|
|
|
jc Phone #: ###-####
|
BLD-Energy code compliance | 11/12/2014 | 11/13/2014 | 11/13/2014 | A | PASS |
Jim Storey
|
|
|
JC Phone #: ###-#### ok to insulate ceilling foamseal ok
|
BLD-Ceiling Grid Inspection | 11/7/2014 | 11/10/2014 | 11/10/2014 | P | PASS |
Jim Storey
|
|
|
JC// 4th floor soffits Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/5/2014 | 11/6/2014 | 11/6/2014 | A | PASS |
Jim Storey
|
|
|
JC-2 nd floor Phone #: ###-#### insulation and rc ok to cover 2nd floor/ sheer 1 st floor ok to cover a and b wing
|
BLD-Ceiling Grid Inspection | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | NR |
Jim Storey
|
|
|
JC Phone #: ###-####
|
BLD-Wall Bracing | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Jim Storey
|
|
|
JC Phone #: ###-####2nd floor interior ok
|
BLD-Wall cover | 10/30/2014 | 10/31/2014 | 10/31/2014 | A | PASS |
Jim Storey
|
|
|
JC Phone #: ###-####sheer nail pick up interior. 2nd and 3hird floor sheer ok
|
BLD-Energy code compliance | 10/30/2014 | 10/31/2014 | 10/31/2014 | A | CANC |
Jim Storey
|
|
|
2nd floorJC Phone #: ###-####walls ok
|
BLD-Energy code compliance | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PART |
Jim Storey
|
|
|
JC Phone #: ###-####
|
BLD-Wall cover | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PART |
Jim Storey
|
|
|
JC Phone #: ###-####
|
BLD-Wall Bracing | 10/23/2014 | 10/24/2014 | 10/24/2014 | A | PASS |
Jim Storey
|
|
|
JC Phone #: ###-#### sheer wall osb ok 2nd floor
|
BLD-Energy code compliance | 10/16/2014 | 10/17/2014 | 10/17/2014 | A | PART |
Jim Storey
|
|
|
2nd fl B wing - Gary Phone #: ###-#### air seal for iecc exterior wall and floor ok.
|
BLD-Energy code compliance | 10/14/2014 | 10/15/2014 | 10/15/2014 | A | PASS |
Jim Storey
|
|
|
JC Phone #: ###-#### 3rd and fouth ok to cover/ ec insulation ok
|
BLD-Framing/Rough-in | 10/10/2014 | 10/13/2014 | 10/13/2014 | A | PART |
Jim Storey
|
|
|
Gary Phone #: ###-#### fourth floor tennent wall gyp need nailling tighter/ missing gyp at trusses.
|
BLD-Framing/Rough-in | 10/1/2014 | 10/2/2014 | 10/2/2014 | A | PASS |
Dave Hannah
|
|
|
Gary-3 fl corrider Phone #: ###-#### ok to cover upper 3rd
|
BLD-Framing/Rough-in | 9/22/2014 | 9/23/2014 | 9/23/2014 | A | PART |
Dave Hannah
|
|
|
4th floor B Wing corrider framing for cover // JC Phone #: ###-#### ok to sheetrock lids
|
BLD-Framing/Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PART |
Jim Storey
|
|
|
J.C. Phone #: ###-#### exterior ok to cover/ truss repair/ pony wall for interior bearing/ starp mlb header to top plate/ strap post to beam roof popout.
|
BLD-Wall Bracing | 8/21/2014 | 8/21/2014 | 8/21/2014 | P | PASS |
Jim Storey
|
|
|
Jason Phone #: ###-#### exterior ok/ interior ok/ ok to gyp coridor ceilling.
|
BLD-Other | 7/21/2014 | 7/21/2014 | 7/21/2014 | P | PART |
Jim Storey
|
|
|
JC-fire blanket Phone #: ###-#### 1st floor ok
|
BLD-Wall Bracing | 7/21/2014 | 7/21/2014 | 7/21/2014 | P | PASS |
Jim Storey
|
|
|
JC Phone #: ###-#### exterior ok for cover
|
FIRE-Conference | 3/19/2014 | 3/19/2014 | | P | |
Forrest France
|
|
|
JC at phone #: ###-####
|