BLD-Final | 8/30/2013 | 8/30/2013 | 8/30/2013 | P | DONE |
Dave Hannah
|
|
|
call tenant 15 min before Raj Phone #: ###-####
|
BLD-Final | 8/29/2013 | 8/30/2013 | 8/30/2013 | A | PASS |
Dave Hannah
|
|
|
call 20 mins prior Phone #: ###-####
|
BLD-Final | 8/28/2013 | 8/29/2013 | 8/29/2013 | A | PART |
Jim Storey
|
|
|
Raj Phone #: ###-#### final to sign card pending mec sign off for gas permit.
|
FIRE-Final Inspection | 8/28/2013 | 8/28/2013 | 8/28/2013 | P | PASS |
Forrest France
|
|
|
Life safety finaled.
|
FIRE-Final Inspection | 8/28/2013 | 8/28/2013 | 8/28/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Previous items noted have been corrected.
|
FIRE-Final Inspection | 8/22/2013 | 8/23/2013 | 8/23/2013 | A | NR |
Forrest France
|
|
|
Pending remainder of correction items.
|
FIRE-Final Inspection | 8/22/2013 | 8/22/2013 | 8/22/2013 | P | PART |
Forrest France
|
|
|
Need to post "door to remain...."signage at the main entry/exit, post PFE as discussed, repair exit sign/EM light.
|
BLD-Final | 8/22/2013 | 8/22/2013 | 8/22/2013 | P | PART |
Jim Storey
|
|
|
call 1/2 hr ahead to meet // going for temp// Raj Phone #: ###-#### pending others for perm
|
BLD-Ceiling Grid Inspection | 8/20/2013 | 8/21/2013 | 8/21/2013 | A | PASS |
Jim Storey
|
|
|
Dan Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/12/2013 | 8/13/2013 | 8/13/2013 | A | PART |
Jim Storey
|
|
|
Dan Phone #: ###-#### ceilling ok pending mech sign off
|
BLD-Ceiling Grid Inspection | 8/2/2013 | 8/2/2013 | 8/2/2013 | P | NR |
Jim Storey
|
|
|
dan - call for access Phone #: ###-####
|
BLD-Framing/Rough-in | 7/8/2013 | 7/8/2013 | 7/8/2013 | P | PASS |
Jim Storey
|
|
|
Dan Phone #: ###-####
|
BLD-Framing/Rough-in | 6/26/2013 | 6/26/2013 | 6/26/2013 | P | PART |
Jim Storey
|
|
|
Dan - please cal 30 min before going out Phone #: ###-#### framing ok pending all trade permits aprovals.
|