Permit Information
Permit NumberBLD13-00906
StatusFinaled
Name ARTISAN BUILDERS
Site Address 4632 W AERONCA ST
Project NameAviation Specialties Unlimited
Customer Number 
ePlanReviewYes
Description
Aviation Specialties Unlimited - New hangar and office expansion - To construct a new 18,000 sq. ft. one story, pre-engineered metal building, group II aircraft hangar and office addition with a 3,425 sq. ft. basement and 3,475 sq. ft. office mezzanine. This addition is being constructed on the east side of an existing 8,900 sq. ft. one story aircraft hangar and office building. This permit also includes the construction of a 400 sq. ft. accessible restroom and utility room area at the southeast corner of the existing hangar. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/27/20154/27/20154/27/2015PPASS
DetailsJim Storey
Cherry Phone #: ###-####
FIRE-Final Inspection4/24/20154/27/20154/27/2015APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection10/21/201410/21/201410/21/2014PPART
DetailsForrest France
Fire life safety inspection at the new hangar completed acceptable.
BLD-Final10/21/201410/21/201410/21/2014PPART
DetailsMike Jordan
for temp on hangar // Teri Phone #: ###-####. hangar ok, pending fire/life/safety.
BLD-Final10/3/201410/6/201410/6/2014APASS
DetailsJim Storey
Teri Phone #: ###-#### office ok boiller rm needs firestopped
FIRE-Final Inspection10/1/201410/1/201410/1/2014PPART
DetailsTroy Cobbley
Fire sprinkler, fire alarm and fire life safety complete in the new office area (basement, first & second floors). New office area only. The remaining new hanger area is not complete yet.
FIRE-Final Inspection9/26/20149/26/20149/26/2014PFAIL
DetailsTroy Cobbley
To complete the life safety in the new office area only I need the fire alarm system corrections completed and all of the emergency lights and exit signs installed and functional.
FIRE-Final Inspection9/25/20149/25/20149/26/2014PCANC
DetailsTroy Cobbley
Canceled due to time constraints.
BLD-Conference8/25/20148/26/20148/27/2014APASS
DetailsJim Storey
Terry Phone #: ###-####
BLD-Other7/17/20147/18/20147/18/2014APASS
DetailsJim Storey
Fire block on stairway - Terri Phone #: ###-#### fire stopping ok ok to instal hard lid
BLD-Conference7/16/20147/17/20147/17/2014APASS
DetailsJim Storey
Terry Phone #: ###-####
BLD-Framing/Rough-in7/14/20147/15/20147/15/2014APART
DetailsJim Storey
partial framing on west side of hangar & acoustical ceiling grid insp in basement // Teri Phone #: ###-#### all hard ceillings and part of east drop ceillings ok/ need to fire stop west stair above hard lid.
BLD-Framing/Rough-in6/2/20146/2/20146/2/2014PPASS
DetailsJim Storey
Teri Phone #: ###-####
BLD-Framing/Rough-in5/9/20145/13/20145/13/2014APART
DetailsJim Storey
terri Phone #: ###-#### 2 hr exterior ok office framing ok pending review. and trade ri.
BLD-Conference4/8/20144/8/20144/8/2014PFAIL
DetailsJim Storey
arch to provide to planreview east wall [ ie 2hr exterior wall ] details and listing not per the aproved plan. 5a-3.4 grid linec-2 thrur c6.
BLD-Conference4/4/20144/7/20144/7/2014PPART
DetailsJim Storey
Skip Jones Phone #: ###-#### need to meet with plan review.
BLD-Framing/Rough-in3/18/20143/19/20143/19/2014APASS
DetailsJim Storey
terri Phone #: ###-#### bathrm west bldg ok to cover/ vent fan ducted thru roof.
BLD-Framing/Rough-in3/13/20143/14/20143/14/2014AFAIL
DetailsJim Storey
Teri Phone #: ###-#### duct in 2 hr wall no protection/ backing ada
BLD-Wall cover2/24/20142/25/20142/25/2014APASS
DetailsTom Arcoraci
Reinspection of fire wall in existing hangar,
Also erection of stair systems has begun and open for review.
Observation of hangar door rail system work in wip of 2 hr wall ok
BLD-Grading Inspection1/24/20141/27/20141/27/2014PPART
DetailsJim Storey
Slab on grade base rock ready for insp. Planning spray on insulation/vapor barrier Tues. Also have MTI Density tests Monday afternoon. Phone #: ###-#### >> Inspection requested via web by Teri Kiser mti to verify.
BLD-Foundation1/21/20141/22/20141/22/2014APART
DetailsJim Sly
Door rail lower foundation slab gridline 2. Please visit any time before 10am as concrete is scheduled for Noon. Thanks Phone #: ###-#### >> Inspection requested via web by Teri Kiser
Door rail slab OK pending MTI special inspection, tests and approvals. MTI approval of soil bearing.
BLD-Foundation1/16/20141/17/20141/17/2014APASS
DetailsJim Storey
Please if possible visit by 9am, col. pedestal B/5 and small frost wall (less than 2 yds). Conc. pour @ 10am. Phone #: ###-#### >> Inspection requested via web by Teri Kiser
BLD-Foundation1/14/20141/15/20141/15/2014APASS
DetailsJim Storey
Prefer visit btw 10am & 11am, foundation pedestals @ B line, ftg B/5, walls 8 line, north ftg @ 2 line. Concrete scheduled for 1pm w/ MTI rebar insp and samples. Phone #: ###-#### >> Inspection requested via web by Teri Kiser
BLD-Foundation1/10/20141/13/20141/13/2014APASS
DetailsJim Storey
Column pedestals & foundation walls line C, also ftgs line B. Prefer approx. visit btw 10am & 11am due to concrete pour set up for 1pm. As always MTI to insp rebar w/ conc. samples. Phone #: ###-#### >> Inspection requested via web by Teri Kiser engineer to adress changes with si insp.
BLD-Footing1/6/20141/7/20141/7/2014APASS
DetailsJim Storey
Btw 10am & 11Am preferred to insp ftgs, MTI insp due @ 12:30pm, concrete scheduled for 1pm...
Also, steel deck puddle welding insp (which prev. passed insp by MTI) Phone #: ###-#### >> Inspection requested via web by Teri Kiser
BLD-Wall cover12/26/201312/26/201312/26/2013PPART
DetailsJim Storey
frmg @ mech rm, puddle welding L1 decking, grading existing pipe Hazwhopper ops per EPA Phone #: ###-#### >> Inspection requested via web by Teri Kiser / nr/ 2hr wall esisting building top of wall and ends to be extented.
BLD-Foundation12/10/201312/11/201312/11/2013APASS
DetailsJim Storey
10:00 am pour time remaining bsmt wall
MTI monitoring
Cold weather concreting plan established
Heaters, tenting etc... Phone #: ###-#### >> Inspection requested via web by Teri Kiser heat and protection in place/ si on site/ rebar ok to place concrete/ drainage protection aplied to exterior wall ok to start back fil.
BLD-Concrete11/27/201312/2/201312/2/2013PPASS
DetailsJim Storey
SOG at basement Phone #: ###-#### >> Inspection requested via web by Teri Kiser
BLD-Footing11/22/201311/25/201311/25/2013APASS
DetailsJim Storey
Ftg line 6 btw stairwell and elevator pit
Should be ready for insp after 10am
Phone #: ###-#### >> Inspection requested via web by Teri Kiser
BLD-Foundation11/21/201311/22/201311/22/2013PPASS
DetailsJim Storey
Bsmt walls line B and 6
Phone #: ###-#### >> Inspection requested via web by Teri Kiser west end 1/2 of northeast walls ok
BLD-Foundation11/20/201311/21/201311/21/2013PCANC
DetailsJim Storey
Basement walls lines B and 6
MTI to follow with SI prior to pour Phone #: ###-#### >> Inspection requested via web by Teri Kiser Inspection cancelled from web by: Teri Kiser
BLD-Concrete11/13/201311/14/201311/14/2013PPASS
DetailsJim Storey
Walls on south and east end of basement Phone #: ###-#### >> Inspection requested via web by Teri Kiser ft north side 1/2 east to west/ wall ok pending si reports.
BLD-Footing11/6/201311/7/201311/7/2013PPART
DetailsJim Storey
Includes elev pit walls Phone #: ###-#### >> Inspection requested via web by Teri Kiser west ft ok pending si
BLD-Footing10/31/201311/1/201311/1/2013APART
DetailsJim Storey
MARK Phone #: ###-#### si ok east end ft ok.