Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberBLD13-01634
StatusFinaled
Name HOFFMAN CONSTRUCTION COMPANY
Site Address 1000 W MYRTLE ST
Project NameJUMP
Customer Number 
ePlanReviewNo
Description
(JUMP - JACK'S URBAN MEETING PLACE - ABOVE GRADE TENANT IMPROVEMENT) - To finish for occupancy a 240,445 sq. ft., six story social meeting and education building with a four level parking garage. The first floor consists of parking on the south, a driveway and circulation areas, the fire command center, an entry lobby on the south with a kitchen and seating area, restrooms, storage and mechanical areas. There are also some building storage, mechanical, trash and sprinkler rooms. The second floor consists of administrative offices and restrooms above the entry lobby. The third floor contains a level of parking on the south, circulation and egress areas, an outdoor garden studio, as well as, building storage, maintenance and sprinkler rooms. The fourth floor has a parking garage level with a dust containment room along with electrical and storage rooms. There are circulation and egress areas with a terrace and public restrooms. There is an Inspiration Studio and a Multi Media Studio. The fifth floor has a Sculpture Garden at the top of the parking garage. Within the Sculpture Garden there is a Makers Studio, a party area with a trellis cover and a kitchen. There are also circulation and egress areas with a large entry lobby, outdoor seating area, public restrooms, a Movement Studio and a Multi-Purpose Studio. At the center is the Jump Room Studio. The sixth floor has a large Sky Lobby, circulation and egress areas and two terraces. At the center is the Pioneer Grand Ballroom with a catering kitchen. There are mechanical equipment wells at a portion of the roof area. The construction of all exterior circulation and egress areas, exterior stairways, elevators and mechanical shafts and the completion of all mechanical, electrical and machine rooms were done under the shell permit BLD13-00016. All construction per the approved plans and attached comment list. This high-rise building is fully fire sprinklered with an approved fire alarm system. Separate Fire Protection permits will be required for the necessary fire protection modifications; as regulated by the Fire Department. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/6/20186/6/20186/11/2018 PEND
DetailsDave Hannah
BLD-Final3/28/20183/29/20183/29/2018APASS
DetailsDave Hannah
Victoria Phone #: ###-####
FIRE-Final Inspection3/28/20183/28/20183/28/2018PPASS
DetailsJim Page
Final life fire safety inspection complete.
DOC - Permit Expired3/16/20183/16/20183/16/2018ACANC
DetailsDave Hannah
BLD-Aging Inspection3/12/20183/12/20183/16/2018 PEND
DetailsDave Hannah
BLD-Final1/8/20181/9/20181/9/2018ANR
DetailsDave Hannah
Victoria Phone #: ###-####
BLD-Aging Inspection12/6/201712/6/201712/14/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection9/25/20179/25/201710/3/2017 PEND
DetailsDave Hannah
BLD-Other7/25/20177/25/20177/25/2017PPART
DetailsDave Hannah
Victoria-wants temp final on level 5 exterior party deck Phone #: ###-#### ok for tco on all areas of the jump bld.
BLD-Final7/20/20177/21/20177/21/2017ANR
DetailsJim Storey
Casey Phone #: ###-#### no ancer/ outstanding isues w down town with submitals and trades not signed off as well as fire permits.
BLD-Aging Inspection5/29/20175/29/20175/30/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection3/27/20173/27/20173/28/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection12/26/201612/26/20161/3/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection10/24/201610/24/201610/25/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection8/22/20168/22/20168/22/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection6/20/20166/20/20166/20/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection4/20/20164/20/20164/21/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection2/8/20162/8/20162/10/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection12/7/201512/7/201512/7/2015 PASS
DetailsDave Hannah
BLD-Conference10/5/201510/5/201510/5/2015PPEND
DetailsDave Hannah
Ada compliance in level 1 - Victoria Phone #: ###-####
BLD-Final8/28/20158/28/20158/28/2015PPART
DetailsDave Hannah
okay for temporary occupancy- Staff ONLY, no general public
FIRE-Final Inspection8/28/20158/28/20158/28/2015PPART
DetailsThomas Walsh
as per phone call with Scott Arellano; okay for temp CofO //CEV
BLD-Conference7/8/20157/9/20157/10/2015PPASS
DetailsDave Hannah
Meeting at Hoffman offices to discuss accessible pathway. Meeting at 2:30. If you can't make this time please call the architect, Lori Selna, at ###-####.
BLD-Framing/Rough-in7/6/20157/7/20157/10/2015APASS
DetailsDave Hannah
Request framing inspection for parking garage entry. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Conference7/2/20157/6/20157/6/2015ADONE
DetailsDave Hannah
Review guardrail conditions. Please contact CJ with Hoffman to walk these areas ###-####.

Thanks Phone #: ###-#### Inspection requested via web by Noelle Idehara
BLD-Conference7/1/20157/2/20157/2/2015ACANC
DetailsDave Hannah
Review guardrail conditions. Please contact CJ with Hoffman to walk these areas ###-####.

Thanks Phone #: ###-#### Inspection requested via web by Noelle Idehara
BLD-Wall cover6/18/20156/18/20156/18/2015PPASS
DetailsDave Hannah
Kitchen studio fireplace framing for cover contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Conference6/4/20156/4/20156/4/2015PPASS
DetailsDave Hannah
6th floor grid ceiling cover inspection Kitchen area. contact Jeremy Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Ceiling Grid Inspection5/27/20155/28/20155/28/2015APASS
DetailsMike Jordan
Makers studio above ceiling office.... 1st ; 2nd floor Kitchen studio ceiling contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Ceiling Grid Inspection5/13/20155/13/20155/13/2015PPASS
DetailsDave Hannah
Ceiling inspection for Grid ceilings 1st 2nd 4th 6th Floors of the JUMP building.... Contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in4/27/20154/28/20154/28/2015PPASS
DetailsDave Hannah
Requesting inspection for framing at level 6 sofit near stair A-01, Please contact Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Wall cover4/23/20154/23/20154/23/2015APASS
DetailsDave Hannah
Requesting sheathing inspection for West Tractor Box. Please call Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in3/24/20153/24/20153/25/2015PPASS
DetailsDave Hannah
Requesting sheathing inspection for East Tracker box interior. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Conference3/12/20153/13/20153/13/2015APEND
DetailsDave Hannah
Temp 2hr separation wall under ground garage from jump building.contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Ceiling Grid Inspection3/2/20153/4/20153/4/2015APASS
DetailsDave Hannah
Service core elevator lobbies 3rd 4th 5th 6th floors and Jump lobby ceilings all for cover for drywall over fat grid. contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Ceiling Grid Inspection2/27/20153/2/20153/2/2015ACANC
DetailsDave Hannah
Service core elevator lobbies and Jump lobby ceiling inspections for cover drywall ceilings.. Neal Mays Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson Inspection cancelled from web by: Jeremy Richardson
BLD-Ceiling Grid Inspection2/13/20152/13/20152/14/2015PPASS
DetailsDave Hannah
6th floor service core drywall ceiling cover inspection. Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in2/11/20152/11/20152/12/2015PPASS
DetailsDave Hannah
BLD-Framing/Rough-in2/10/20152/11/20152/11/2015ADEFR
DetailsDave Hannah
Requesting framing (z furring) inspection on level 6 outside of service core. Please contact Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Wall cover2/6/20152/9/20152/9/2015APASS
DetailsDave Hannah
Service core Elevator vestibules walls for cover interior and exterior walls 3rd, 4th, 5th and 6th floors Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in2/4/20152/4/20152/5/2015PPASS
DetailsDave Hannah
Requesting sheathing inspection on level 4 near passenger elevator. Soffit framing inspection level 6 service core. Framing west tractor box bottom soffit. Please call Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in1/26/20151/26/20151/27/2015PPASS
DetailsDave Hannah
Requesting framing inspection for west tractor box, level 4 passenger elevator at zee girts and sheathing for 3rd and 4th elevator fronts on passenger. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Ceiling Grid Inspection1/22/20151/23/20151/23/2015ACANC
DetailsDave Hannah
1st floor ceiling cover inspection in the Decouctics ceiling area kitchen studio lobby...and fire wall talk on exterior wall 2 hour fire rated conditions service core area... UL425 contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in1/14/20151/15/20151/15/2015APASS
DetailsDave Hannah
requesting sheathing inspection for level 5 soffits by pioneer stair and level 4 soffit by passenger elevator Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Wall cover1/9/20151/12/20151/12/2015APASS
DetailsDave Hannah
6th floor restroom area walls for cover... and movement studio area drywall ceilings cover Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in1/9/20151/12/20151/12/2015APASS
DetailsDave Hannah
Requesting framing inspection on the 3 center tractor boxes. Please call Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in1/7/20151/7/20151/7/2015PPASS
DetailsDave Hannah
Requesting sheathing inspection for level south side of kitchen studio soffits, level 3-4 passenger elevator soffits. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Wall cover12/19/201412/22/201412/22/2014APASS
DetailsDave Hannah
5th Floor service core Restroom for wall and ceiling cover. Contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in12/18/201412/19/201412/19/2014APASS
DetailsDave Hannah
Requesting framing inspection for stair 801. Please call Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in12/17/201412/18/201412/18/2014APASS
DetailsDave Hannah
Requesting framing inspection for 5th floor soffits. Please call Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in12/11/201412/15/201412/15/2014APASS
DetailsDave Hannah
Requesting zee furring inspection for south side of kitchen studio 1st floor soffit. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Wall cover12/11/201412/12/201412/12/2014APASS
DetailsDave Hannah
6th floor pioneer lobby radius wall ...Contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Wall cover12/2/201412/3/201412/4/2014APASS
DetailsDave Hannah
6th floor Kitchen, the wall furring at exterior wall line for cover. contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Wall cover11/12/201411/13/201411/13/2014APASS
DetailsDave Hannah
6th floor wall cover inspection. contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in11/10/201411/10/201411/10/2014PPASS
DetailsJim Storey
Requesting sheathing inspection for Multi-Media and framing inspection for 1st and 2nd floor @ stair A0-3. Please call Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton ceillings ok to cover.
BLD-Framing/Rough-in11/5/201411/6/201411/6/2014APASS
DetailsDave Hannah
Requesting sheathing inspection for 4th and 5th level. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Wall cover10/28/201410/30/201410/30/2014APASS
DetailsDave Hannah
5th floor all areas wall cover only at this time. Neal Mays 941 1493 Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in10/28/201410/29/201410/29/2014APASS
DetailsDave Hannah
Requesting framing inspection for level 5 ceilings. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Conference10/21/201410/22/201410/22/2014APASS
DetailsDave Hannah
Requesting sheathing inspection for 1st, 2nd and 3rd floor soffits. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Wall cover10/17/201410/20/201410/20/2014APART
DetailsDave Hannah
Service core Restrooms 4th floor ceiling cover, 5th floor walls cover, and Multi purpose studio wall cover contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson sixth floor shaft 5th floor rest rooms ok to cover
BLD-Framing/Rough-in10/15/201410/16/201410/16/2014PPASS
DetailsDave Hannah
Requesting framing inspection on ceilings on 5th floor, 3rd and 4th by passenger elevator. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in10/14/201410/15/201410/15/2014APASS
DetailsDave Hannah
Request re-inspection for 3rd and 4th floor ceilings. Please contact Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in10/9/201410/10/201410/10/2014APASS
DetailsDave Hannah
Requsting soffit framing inspection @ stair A0-3b and A0-4b 3rd and 4th floor beyween grid line 9.1 ; 9.2a. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Wall cover9/30/201410/1/201410/1/2014APASS
DetailsDave Hannah
Makers Studio chase cover this includes shaft ceiling 4th floor IDF room that is the bottom of chase....Multi Media Hard lid @ entry to cover Contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in9/29/20149/30/20149/30/2014APASS
DetailsDave Hannah
Requesting framing inspection for 4th floor soffits excluding grid line 9.1a to 9.2. Framing inspection Level 5 and 6 passenger elevator grid line 9.4a. Framing and sheathing inspection Level 7 between 9.5 and 9.5a. Sheathing inspection on Level 3/4 at storage/dust containment parking level. Sheathing inspection at underside of Inspiration and movement studio. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in9/26/20149/26/20149/26/2014PPASS
DetailsDave Hannah
Requesting exterior sofit inspection for 3rd floor grid line 9.2 to 9.3 a. please contact Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Wall cover9/22/20149/22/20149/22/2014APASS
DetailsDave Hannah
Makers Studio and Movement studio wall cover re-inspection Contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Wall cover9/19/20149/19/20149/22/2014PDEFR
DetailsDave Hannah
Makers Studio and Movement studio wall cover re-inspection Contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in9/18/20149/19/20149/19/2014APASS
DetailsDave Hannah
Requesting framing inspection for soffits under movement and inspiration studios, and wall framing at column line 9.4 at the kitchen studio Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in9/15/20149/16/20149/16/2014ANR
DetailsDave Hannah
Requesting framing inspection for 1st floor ceiling from 9.3a to 9.4a and 3rd floor 9.3a to 9.6a. Please contact Rudy. Phone #: ###-#### Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Wall cover9/15/20149/16/20149/16/2014ANR
DetailsDave Hannah
Makers studio and Movement studio wall cover inspection contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in9/12/20149/15/20149/15/2014ACANC
DetailsDave Hannah
Requesting framing inspection for 1st floor ceiling from 9.3a to 9.4a and 3rd floor 9.3a to 9.6a. Please contact Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton Inspection cancelled from web by: Tim Pendleton
BLD-Wall cover9/10/20149/11/20149/11/2014APASS
DetailsDave Hannah
2nd floor Kitchen studio drywall ceiling cover...Jeremy Richardson ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in9/3/20149/4/20149/4/2014PPASS
DetailsDave Hannah
Request framing inspection for exterior Ceilings at 2nd floor and 1st floor lobby including sheathing. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Wall Bracing8/29/20149/2/20149/2/2014APART
DetailsDave Hannah
4th floor service core restroom area contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson ok to cover
BLD-Wall cover8/28/20148/29/20148/29/2014ADEFR
DetailsJim Storey
4th floor service core restroom area contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson out of time defr. to am tue
BLD-Conference8/21/20148/22/20148/22/2014APASS
DetailsDave Hannah
Kitchen Studio High drywall ceiling 2nd floor over stairs . Inspiration studio walls and ceiling, Service core 4th floor restroom walls. Contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in8/18/20148/19/20148/19/2014APASS
DetailsDave Hannah
Requesting Framing inspection for 4th floor Dust Containment. Please call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in8/15/20148/18/20148/19/2014PPASS
DetailsDave Hannah
Requesting sheathing inspection for service core levels 5-7. Please contact Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Wall cover8/11/20148/12/20148/12/2014APASS
DetailsDave Hannah
Service core 3rd floor Maintenance/Electrical room Neal Mays ###-#### Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in8/11/20148/12/20148/12/2014APASS
DetailsDave Hannah
Requesting inspections for framing on South side of service core and sheathing on passenger elevator. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Conference8/6/20148/7/20148/8/2014PPASS
DetailsDave Hannah
Request framing inspection for West Side Passenger Elevator. Please call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Ceiling Grid Inspection8/7/20148/7/20148/7/2014PPASS
DetailsDave Hannah
Kitchen Studio 1st floor drywall ceiling cover inspection Contact Neal Mays ###-#### Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
BLD-Conference7/28/20147/28/20147/29/2014PPART
DetailsDave Hannah
Requesting framing inspection for elevator service core 5th and 6th floor, East side passenger elevator floors 3-7, and skylight at JUMP room. Please call Rudy Phone #: ###-#### >> Inspection requested via web by Tim Pendleton ok to cover ext
BLD-Wall cover7/28/20147/28/20147/29/2014PPASS
DetailsDave Hannah
Interior precover inspection for Levels 1 and 2 of the service core. This is a follow up inspection due to areas that required fireproof patching. Phone #: ###-#### >> Inspection requested via web by Noelle Idehara
BLD-Wall cover7/21/20147/22/20147/22/2014APASS
DetailsJim Storey
shaft wall cover service core elevator Phone #: ###-#### Inspection requested via web by Jeremy Richardson core board ok on service elavator ok to cover.
BLD-Wall cover7/17/20147/17/20147/17/2014PFAIL
DetailsJim Storey
Wall cover and looking at the fireproofing in service core mechanical room on column. contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson fire prooffing not in place .
BLD-Framing/Rough-in7/11/20147/11/20147/14/2014PPART
DetailsDave Hannah
Requesting framing inspection for elevator service floor 5-7. Except the South side. Please contact Rudy Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in7/10/20147/11/20147/11/2014APART
DetailsDave Hannah
Requesting sheathing inspection for West side of elevator service floor 5-7. Please contact Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton ext framing and sheetig ok
BLD-Conference7/10/20147/11/20147/11/2014APART
DetailsDave Hannah
Requesting framing inspection at North side passenger elevator from 3-7 floor. Please contact Rudy Phone #: ###-#### >> Inspection requested via web by Tim Pendleton ext sheeting ok and framing ok
BLD-Wall cover7/9/20147/11/20147/11/2014APASS
DetailsDave Hannah
Wall cover inspection for 2nd floor Kitchen studio and service core trash and mechanical rooms contact Neal Mays ###-#### Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in7/9/20147/9/20147/10/2014PFAIL
DetailsDave Hannah
Requesting framing inspection at North side passenger elevator from 3-7 floor. Please contact Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton needs to refire proof be
BLD-Wall cover7/2/20147/3/20147/3/2014APART
DetailsDave Hannah
Service core 1st level trash room and mechanical room. Kitchen studio 2nd floor. Neal Mays is the contact ###-#### Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson ok to one side 2nd floor needs fire protect floor pens patch fire proofing on colunms ok to cover trase and elec room all but for column that fire proofing was removed to add stiffiner plates
BLD-Framing/Rough-in6/24/20146/24/20146/24/2014APASS
DetailsDave Hannah
Request sheathing inspection at first floor vestibule at Kitchen Studio. Please call Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Wall cover6/17/20146/23/20146/24/2014APART
DetailsDave Hannah
East Half Kitchen Studio 1st floor, Multi-Media Studio, Inspiration Studio, Makers Studio, Service Core 1st level Trash and Mechanical rooms and 3rd floor Maintenance and electrical rooms Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in6/23/20146/23/20146/24/2014PCANC
DetailsDave Hannah
Request sheathing inspection at first floor vestibule at Kitchen Studio. Please call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Wall cover6/12/20146/13/20146/13/2014APASS
DetailsDave Hannah
West half bathroom side area A kitchen studio 1st floor. Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in6/11/20146/12/20146/12/2014APASS
DetailsDave Hannah
Request Framing inspection for 1st floor lobby at kitchen studio. Please call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in6/10/20146/11/20146/12/2014PPASS
DetailsDave Hannah
Request Framing inspection for Multii- Purpose 5th floor. Call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Conference6/10/20146/10/20146/10/2014PPASS
DetailsDave Hannah
Request sheathing inspection for Multi-Purpose Studio 5th Floor. Please contact Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Conference6/4/20146/5/20146/5/2014APASS
DetailsDave Hannah
Request framing inspection for Multi-Purpose 5th floor. Also sheathing inspection for Movement 5th floor. Please contact Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Wall cover6/3/20146/4/20146/4/2014APART
DetailsDave Hannah
Area A Kitchen Studio 1st and 2nd floor wall cover inspections restroom area only. Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson ok to cover 1st floor only 2nd floor sill needs pent fire stopped
BLD-Framing/Rough-in5/30/20146/2/20146/2/2014APASS
DetailsDave Hannah
Requesting exterior framing inspection for Movement Studio and exterior framing/sheathing for skylights @Maker''s Studio 5th floor. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Conference5/30/20146/2/20145/30/2014ACANC
DetailsDave Hannah
Request framing inspection on Movement and Multimedia Studio 5th Floor. Please contact Rudy ###-#### Phone #: ###-#### >> Inspection requested via web by Tim Pendleton Inspection cancelled from web by: Tim Pendleton
BLD-Framing/Rough-in5/30/20146/2/20145/30/2014ACANC
DetailsDave Hannah
Request framing inspection on Movement Studio 5th Floor. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton Inspection cancelled from web by: Tim Pendleton
BLD-Framing/Rough-in5/16/20145/19/20145/19/2014APASS
DetailsDave Hannah
Requesting framing and sheathing inspection for storage 03-C11 between 9.8 grid line & 9.7A grid line parking Level 3 Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in5/16/20145/16/20145/16/2014PCANC
DetailsDave Hannah
Interior wall framing inspection Kitchen, Multi media, Makers and Inspiration Studio''s This is a interior wall framing package inspection for Interior Systems so we can hang top out drywall. contact Jeremy Richardson @ ###-#### or Neil Mays ###-#### Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in5/15/20145/15/20145/15/2014PFAIL
DetailsJim Sly
Requesting framing inspection for storage 03-C11 between 9.8 grid line & 9.7A grid line parking Level 3. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
Missing two bolts in top track. Rudy will complete and call for Insp. (Storage rooms).
BLD-Framing/Rough-in5/8/20145/8/20145/9/2014PPASS
DetailsDave Hannah
Requesting framing and sheathing inspection for skylights at kitchen and makers studio. Please call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in4/29/20144/30/20145/2/2014PPASS
DetailsDave Hannah
Requesting sheathing inspection for Makers studio. Please call Rudy ###-#### Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in4/30/20145/1/20145/1/2014ANR
DetailsMike Jordan
This is a interior wall inspection and walk threw so we can start wall top out in area A kitchen studio 1st and 2nd floor The inspection is for ISI Interior Systems Inc. INTERIOR framing contractor on the JUMP project. Please Contact Neil Mays ###-#### for the inspection Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson. Noted that trades are not inspected or completed in these areas. ISI wants to rock from deck down 4ft. 8inch. Suggested to Hoffman to set up a meeting between subs and inspectirs to come up with a phasing plan moving forward.
BLD-Framing/Rough-in4/29/20144/30/20144/30/2014APASS
DetailsDave Hannah
Requesting sheathing inspection for west side service elevator. Please call Rudy ###-####. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in4/23/20144/24/20144/29/2014PPASS
DetailsDave Hannah
Requesting sheathing inspection Multi-media. Please call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in4/28/20144/29/20144/29/2014APASS
DetailsDave Hannah
Requesting Framing Inspection @ Makers studio and Elevator Service Core South and West Walls. Sheathing inspection for Grid line "G" on the 4th floor. Please call Rudy ###-#### Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in4/22/20144/23/20144/24/2014APASS
DetailsDave Hannah
Requesting inspection for the following items. Please call Rudy with Northwest Interiors to coordinate inspection ###-####. 1. Exterior Sheathing Inspection - Inspiration Studio. 2. Exterior Framing Inspection - at grid G around the helix on Level 4 (east and west sides). 3. Sheathing Inspection at South side of Service Core
Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in4/21/20144/22/20144/23/2014APASS
DetailsDave Hannah
Requesting exterior framing inspection for Filming Studio. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in4/7/20144/7/20144/7/2014PPASS
DetailsDave Hannah
requesting exterior framing inspection at the elevator service core. Grid lines 9.1a-9.2a. 3rd and 4th floors Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in4/2/20144/3/20144/7/2014APASS
DetailsDave Hannah
requesting exterior framing inspection at the elevator service core. Grid lines 9.1a-9.2a. 3rd and 4th floors Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in4/1/20144/1/20144/1/2014PPASS
DetailsDave Hannah
requesting exterior sheathing inspection at the kitchen. Grid lines 9.4a-9.5 Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Wall cover3/26/20143/27/20143/27/2014ACANC
DetailsDave Hannah
area A of the jump building interior framing first and second floor restroom / kitchen prep areas Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson