BLD-Final | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PASS |
Jim Storey
|
|
|
Corey Phone #: ###-####
|
BLD-Final | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | CANC |
Dave Hannah
|
|
|
Corey Phone #: ###-####
|
BLD-Aging Inspection | 1/2/2017 | 1/2/2017 | 1/4/2017 | | NR |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 10/31/2016 | 10/31/2016 | 10/31/2016 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 8/30/2016 | 8/31/2016 | 8/31/2016 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Final Inspection | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, final fire sprinkler underground supply inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, final life fire safety inspection passed/complete.
|
BLD-Conference | 8/29/2016 | 8/30/2016 | 8/30/2016 | A | PART |
Jim Storey
|
|
|
Corey Phone #: ###-#### wip
|
BLD-Aging Inspection | 8/17/2016 | 8/17/2016 | 8/17/2016 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Other | 8/2/2016 | 8/2/2016 | 8/2/2016 | A | PASS |
Jim Storey
|
|
|
Electrical penetration fire caulk in bathrooms Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Other | 7/22/2016 | 7/25/2016 | 7/25/2016 | A | PASS |
Jim Storey
|
|
|
Inspect fire extinguisher cabinet openings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 | P | PASS |
Jim Storey
|
|
|
Third floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | PASS |
Jim Storey
|
|
|
Second floor bathroom ceiling inspections Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 | P | FAIL |
Jim Storey
|
|
|
Second floor bathroom ceiling inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith /n postedc
|
BLD-Ceiling Grid Inspection | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | PASS |
Jim Storey
|
|
|
First floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith pending mech 1st floor
|
BLD-Ceiling Grid Inspection | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | CANC |
Jim Storey
|
|
|
First floor bathroom ceiling drops Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD-Conference | 4/11/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Jim Storey
|
|
|
RC inspection third floor Phone #: ###-#### Inspection requested via web by Corey Hockersmith mech rm not done
|
BLD-Wall cover | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Jim Storey
|
|
|
RC inspection second floor Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall cover | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | PART |
Mike Jordan
|
|
|
RC inspection first floor ceiling Phone #: ###-#### Inspection requested via web by Corey Hockersmith. Ok, areas above bathrooms not yet insulated.
|
BLD-Framing/Rough-in | 3/22/2016 | 3/22/2016 | 3/22/2016 | P | PASS |
Mike Jordan
|
|
|
3rd floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith. All previous coorection items have been resolved at 3rd. floor east, except for extending exterior portion of 2hr. wall.
|
BLD-Framing/Rough-in | 3/18/2016 | 3/21/2016 | 3/21/2016 | A | PART |
Jim Storey
|
|
|
Third floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n posted
|
BLD-Framing/Rough-in | 3/18/2016 | 3/18/2016 | 3/18/2016 | P | PASS |
Jim Storey
|
|
|
Second floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 3/16/2016 | 3/17/2016 | 3/17/2016 | P | PASS |
Jim Storey
|
|
|
First floor east side Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 3/10/2016 | 3/14/2016 | 3/14/2016 | A | PART |
Jim Storey
|
|
|
First floor east side and third floor RC west side Phone #: ###-#### Inspection requested via web by Corey Hockersmith russ repairs/ king stud at plm east 1 st floor
|
BLD-Wall Bracing | 1/18/2016 | 1/19/2016 | 1/19/2016 | P | PASS |
Jim Storey
|
|
|
Roof sheathing and strap nailing Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to cover
|
BLD-Wall Bracing | 1/5/2016 | 1/8/2016 | 1/8/2016 | A | PASS |
Jim Storey
|
|
|
Second and third floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith roof decking ok to cover.
|
BLD-Foundation | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | PART |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith. Pending SI inspection.
|
BLD-Foundation | 6/8/2015 | 6/9/2015 | 6/9/2015 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith placed with si pending report
|
BLD-Foundation | 6/1/2015 | 6/2/2015 | 6/2/2015 | A | PART |
Jim Storey
|
|
|
Concrete at 10am. Please call if not able to make it before concrete. Phone #: ###-#### Inspection requested via web by Corey Hockersmith pending si
|
BLD-Footing | 5/27/2015 | 5/28/2015 | 5/28/2015 | A | CANC |
Jim Storey
|
|
|
|
BLD-Footing | 5/27/2015 | 5/28/2015 | 5/27/2015 | A | CANC |
Jim Storey
|
|
|
MTI scheduled for 1:30 PM, Concrete scheduled for 2:00 PM Phone #: ###-#### >> Inspection requested via web by Kevin Honeycutt Inspection cancelled from web by: Kevin Honeycutt
|
BLD-Footing | 5/21/2015 | 5/21/2015 | 5/21/2015 | A | PASS |
Jim Storey
|
|
|
si letter ok/ ft ok to place
|
BLD-Footing | 5/19/2015 | 5/20/2015 | 5/20/2015 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith need si contract.
|
BLD-Footing | 5/18/2015 | 5/19/2015 | 5/19/2015 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith need aproved plan on site/ need si contract
|