Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD14-02889
StatusTemporary Occupancy
Name CSDI CONSTRUCTION INC
Site Address 119 S 10TH ST
Project Name10th and Grove Condos
Customer NumberBLD14-02156
ePlanReviewYes
Description
(119 Grove): Plan modifications to change the arrangement only of the exit our of the 2 hour stair enclosure. 12/17/18 ajs--Permit to construct 4 floors Type V One Hour construction over 3 hour horizontal separation of the Type 1A 2 story parking garage per City of Boise Type V ordinance. This portion of the building consists of 26 units of condominium spaces on top of a two story concrete parking podium with 3 hour separation. The podium plans are currently under review as BLD14-02156. This building is required to be fire sprinklered. Separate Fire Alarm and Fire Sprinker permits will be required; as regulated by the Fire Department.**ajs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/26/20206/26/20206/30/2020 PEND
DetailsDave Hannah
BLD-Aging Inspection3/9/20203/9/20203/12/2020 PEND
DetailsDave Hannah
BLD-Aging Inspection11/11/201911/11/201911/14/2019 PEND
DetailsDave Hannah
BLD-Aging Inspection8/12/20198/12/20198/19/2019 DONE
DetailsDave Hannah
BLD-Aging Inspection6/10/20196/10/20196/13/2019 PEND
DetailsDave Hannah
BLD-Aging Inspection3/29/20193/29/20194/4/2019 PEND
DetailsDave Hannah
BLD-Aging Inspection1/9/20191/9/20191/9/2019 PEND
DetailsDave Hannah
BLD-Aging Inspection10/29/201810/29/201811/2/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection7/13/20187/13/20187/18/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection4/23/20184/23/20185/1/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection2/19/20182/19/20182/20/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection12/18/201712/18/201712/19/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection10/16/201710/16/201710/16/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection8/16/20178/16/20178/23/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection6/16/20176/16/20176/20/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection3/28/20173/28/20173/28/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection1/26/20171/26/20171/27/2017 PEND
DetailsDave Hannah
BLD-Final11/15/201611/15/201611/21/2016PPEND
DetailsDave Hannah
Building Final Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Final11/17/201611/18/201611/19/2016PPEND
DetailsDave Hannah
Building final Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok for temp occ but needs to fix ada issues
BLD-Final11/16/201611/16/201611/16/2016ANR
DetailsDave Hannah
Building Final Phone #: ###-#### Inspection requested via web by Michael Zaccheo
FIRE-Final Inspection11/14/201611/14/201611/15/2016PPASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place, addressing will be installed when recieved as well as stairwell signage (verified install payment be contractor invoice, signs will be installed when recieved) Final life fire safety inspection passed/complete.
BLD-Final11/8/201611/10/201611/9/2016ACANC
DetailsDave Hannah
Mike Phone #: ###-#### Inspection cancelled from web by: Michael Zaccheo
FIRE-Final Inspection11/8/201611/9/201611/9/2016ACANC
DetailsTroy Cobbley
Mike Phone #: ###-#### Inspection cancelled from web by: Michael Zaccheo
BLD-Final10/28/201610/31/201611/1/2016PNR
DetailsDave Hannah
Final after Fire/Life/Safety Phone #: ###-#### Inspection requested via web by Michael Zaccheo
FIRE-Final Inspection10/28/201610/31/201610/31/2016ACANC
DetailsKatie Marron
No inspection completed. Waiting to do in conjunction with Fire Alarm Final.
BLD-Final10/28/201610/28/201610/28/2016PCANC
DetailsDave Hannah
Final after Fire/Life/Safety inspection. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
BLD-Conference10/19/201610/19/201610/19/2016APASS
DetailsDave Hannah
Handrail compliance. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection10/4/201610/4/201610/4/2016PPASS
DetailsDave Hannah
6th floor corridor ceiling grid inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection9/27/20169/28/20169/28/2016APASS
DetailsDave Hannah
Fifth floor corridor ceiling grid inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection9/20/20169/21/20169/21/2016APASS
DetailsDave Hannah
Ceiling grid inspection 4th floor corridor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover9/7/20169/7/20169/8/2016PPASS
DetailsDave Hannah
Hole patches to enclose utility shaft levels 3 thru 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection8/31/20169/1/20169/1/2016PPASS
DetailsDave Hannah
Ceiling grid level 3 corridor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover8/31/20169/1/20169/1/2016PPASS
DetailsDave Hannah
Shaft wall trash/recycle and closure of utility shaft wall. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover8/23/20168/23/20168/24/2016PPASS
DetailsDave Hannah
Shaft wall, level 3 trash/recycle room. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover8/24/20168/24/20168/24/2016APASS
DetailsDave Hannah
Shaft wall, level 3 trash/recycle room. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in8/16/20168/16/20168/16/2016PPASS
DetailsMike Jordan
Lobby framing inspection Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in8/5/20168/5/20168/5/2016PPASS
DetailsDave Hannah
Framing hard lids ; fire caulking above hard lids in corridors 5 ; 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in7/30/20168/1/20168/5/2016PPASS
DetailsDave Hannah
Drop soffit framing 3rd and 4th floor corridors. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Conference7/25/20167/27/20167/27/2016ADONE
DetailsDave Hannah
Meeting with 119 owners group concerning A.D.A. compliance in unit 301. Owners will be on site between 9 a.m. and noon. If you can schedule your visit between those hours it would be appreciated. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection7/21/20167/22/20167/22/2016APASS
DetailsDave Hannah
Re- inspection drop ceiling 604 and inspection drop ceiling 605 Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Conference7/21/20167/21/20167/21/2016PCANC
DetailsDave Hannah
Re-inspection of unit 604 drop ceiling. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
BLD-Ceiling Grid Inspection7/20/20167/21/20167/21/2016APART
DetailsDave Hannah
Drop ceiling inspection units 602, 604, ; 605. Phone #: ###-#### Inspection requested via web by Michael Zaccheo 602 ok
BLD-Ceiling Grid Inspection7/14/20167/15/20167/15/2016APASS
DetailsJim Storey
Drop ceiling inspection unit 603. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection7/12/20167/12/20167/12/2016PPASS
DetailsDave Hannah
Unit 601 drop ceiling framing and fire caulking. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover7/1/20167/1/20167/1/2016APASS
DetailsDave Hannah
5th floor trash/recycle room shaft wall assembly. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover6/30/20166/30/20167/1/2016PCANC
DetailsDave Hannah
5th floor trash/recycle room shaft wall assembly. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection6/27/20166/28/20166/29/2016PPASS
DetailsDave Hannah
Drop ceiling framing and fire caulking units 505 thru 507. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Conference6/24/20166/24/20166/24/2016PPASS
DetailsMike Jordan
Fire drywall at exterior west wall at gussets. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection6/21/20166/22/20166/23/2016PPASS
DetailsDave Hannah
Drop ceiling framing and fire caulking units 501 thru 504. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection6/14/20166/15/20166/15/2016APASS
DetailsDave Hannah
Hard lid and fire caulking units 406 ; 407. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection6/7/20166/8/20166/8/2016APASS
DetailsMike Jordan
Ceiling grid and fire caulking on level 4, units 401 thru 405 Phone #: ###-#### Inspection requested via web by Michael Zaccheo. Fire caulking complete at floor ceiling penetrations at all drop ceiling locations in rooms 401 to 405.
BLD-Energy code compliance6/7/20166/8/20166/8/2016APASS
DetailsMike Jordan
Energy code compliance all of level 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance5/31/20166/3/20166/3/2016PNR
DetailsDave Hannah
Energy code compliance level 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in5/31/20166/2/20166/3/2016APASS
DetailsDave Hannah
Foam and framing inspection all of level 6 Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance5/30/20165/31/20166/1/2016PPASS
DetailsDave Hannah
Energy code compliance west corridor exterior walls level''s 4, 5, ; 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in5/30/20165/31/20165/31/2016PCANC
DetailsDave Hannah
Foam and framing 6th floor. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
BLD-Ceiling Grid Inspection5/20/20165/24/20165/25/2016PPASS
DetailsDave Hannah
Cover inspection area 2 floor 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to cover thrid floor soffits
BLD-Ceiling Grid Inspection5/20/20165/23/20165/23/2016PFAIL
DetailsDave Hannah
Cover inspection area 1 floor 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance5/17/20165/18/20165/18/2016APASS
DetailsDave Hannah
Energy code compliance northwest stairwell. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance5/17/20165/17/20165/17/2016APASS
DetailsDave Hannah
Energy compliance in area 2 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance5/12/20165/12/20165/13/2016PPASS
DetailsDave Hannah
Energy code compliance in area 1 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in5/11/20165/12/20165/13/2016PPASS
DetailsDave Hannah
Foam and framing in area 2 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance5/11/20165/12/20165/12/2016APEND
DetailsDave Hannah
Energy code compliance in area 1 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in5/9/20165/10/20165/11/2016PPASS
DetailsDave Hannah
Foam And framing inspection area 1 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance4/28/20164/28/20164/29/2016PPASS
DetailsDave Hannah
Energy code compliance area 2 on level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in4/26/20164/27/20164/27/2016APASS
DetailsDave Hannah
Foam sealant, shear wall, and rough framing area 2 on level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in4/25/20164/26/20164/26/2016PCANC
DetailsDave Hannah
Foam and framing inspection area 2 on level 4. I have the city set on site now. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
BLD-Energy code compliance4/20/20164/20/20164/21/2016PPASS
DetailsDave Hannah
Exterior wall insulation area 1 level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in4/19/20164/19/20164/20/2016PPASS
DetailsDave Hannah
Foam and framing inspection area 1 level 4. Please check with Mechanical inspector before arrival. He is also scheduled for PM inspection to cover. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover4/12/20164/13/20164/13/2016ADONE
DetailsDave Hannah
Sheer wall nailing on exterior of north wall. MTI to inspect late morning as well. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance4/12/20164/13/20164/13/2016PPASS
DetailsDave Hannah
Energy compliance for area 2 (units 4,5,6, 7) on floor 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance4/11/20164/12/20164/12/2016PPASS
DetailsDave Hannah
Foam insulation in area 2 (units 4, 5, 6, 7) on the 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in4/11/20164/12/20164/12/2016PPASS
DetailsDave Hannah
Framing, and sheer wall in area 2 (units 4, 5, 6, 7) on the 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover4/7/20164/7/20164/7/2016PPASS
DetailsDave Hannah
Fire block for area 1 (units 301, 302, 303) on 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in4/4/20164/5/20164/7/2016PPASS
DetailsDave Hannah
Framing and sheer-wall in area 1 on the 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance4/5/20164/6/20164/7/2016PPASS
DetailsDave Hannah
Exterior wall insulation for energy compliance in area 1 on level 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in3/29/20163/30/20163/30/2016APASS
DetailsDave Hannah
Sheer wall nailing in 5th floor corridor and stairs. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Conference3/22/20163/22/20163/23/2016PDONE
DetailsDave Hannah
Conference on drop ceiling 2 hr assembly. If possible, please call 30 minutes in advance of arrival. Thanks. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover3/16/20163/17/20163/17/2016APART
DetailsDave Hannah
2 hr wall assembly @ trash and recycle shaft Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in3/16/20163/16/20163/17/2016PPART
DetailsDave Hannah
Framing and 2hr assembly Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in3/16/20163/16/20163/16/2016ANR
DetailsDave Hannah
Framing and 2hr assembly Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover3/15/20163/15/20163/15/2016ACANC
DetailsDave Hannah
2 hr shaft wall. Phone #: ###-#### Inspection requested via web by Michael Zaccheo work inprogress
BLD-Framing/Rough-in3/9/20163/10/20163/10/2016APASS
DetailsDave Hannah
South side of roof for roof sheet nailing. Contact on site tomorrow will be Jack Lunsford ###-#### Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in3/8/20163/9/20163/9/2016PPART
DetailsDave Hannah
Roof sheet nailing inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to cover north half
BLD-Wall cover3/4/20163/7/20163/8/2016APASS
DetailsDave Hannah
Sheer wall inspection on the West wall adjacent to the Safari Inn. Will have MTI inspection on same wall @ 11:00 a.m. as well. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in3/4/20163/7/20163/8/2016PPART
DetailsDave Hannah
Roof sheeting nailing on North side of foot print. Phone #: ###-#### Inspection requested via web by Michael Zaccheo north west corner
BLD-Conference2/22/20162/23/20162/24/2016PDONE
DetailsDave Hannah
Fire rated drywall boxes for can lights. Please call approximately 30 minutes before arrival so all concerning parties can be present. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Conference2/16/20162/16/20162/16/2016PPASS
DetailsDave Hannah
Shear wall inspection on 3rd floor corridor and 6th floor west wall. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in2/2/20162/3/20162/4/2016APART
DetailsDave Hannah
would like call ahead; Jack Phone #: ###-#### ok to cover lids in corradors
BLD-Wall cover1/12/20161/12/20161/12/2016PPART
DetailsDave Hannah
Two hour shaft drywall inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover1/4/20161/5/20161/5/2016PPART
DetailsDave Hannah
Drywall inspection for shaft walls. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover1/1/20161/4/20161/4/2016PCANC
DetailsDave Hannah
Shaft wall drywall inspection. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
BLD-Framing/Rough-in12/30/201512/31/201512/31/2015APART
DetailsDave Hannah
Inspection of 3rd and 4th floor framing of 2 hr. shaft walls for drywall on interior side of shafts. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to start rocking
BLD-Framing/Rough-in12/22/201512/23/201512/23/2015APASS
DetailsDave Hannah
Inspection for application of Durock on 2 hour exterior wall next to Safari Inn. MTI is inspecting the sheer-wall portion @ 8 a.m. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in11/11/201511/12/201511/12/2015APART
DetailsDave Hannah
For 1 hr. firewall @ Northwest corner, 3rd floor, next to Safari Inn. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to stand wall
BLD-Framing/Rough-in11/6/201511/6/201511/9/2015PNR
DetailsDave Hannah
Mike Phone #: ###-####
BLD-Framing/Rough-in11/4/201511/5/201511/5/2015PCANC
DetailsMike Jordan
Mike Phone #: ###-####. Will reschedule for tomorrow. Contractor looking for meeting with framers.