Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD15-02772
StatusFinaled
Name CM COMPANY
Site Address 481 W GOWEN RD
Project NameBoise School District O&M Bldg
Customer NumberBLD15-03937; BLD15-03938
ePlanReviewYes
Description
(BOISE SCHOOL DISTRICT OPERATIONS & MAINTENANCE BUILDING – Building “A”) Permit to include construction of a 50,564 square foot building primarily used as office area and a vehicle repair shop. PLAN MODIFICATION 2-23-15 – Modification submitted to value engineer the mechanical system and related work. **TLW** This building is fire sprinklered for area increases. Work to include: concrete foundation, typical metal building structural frame, interior partitions to create several offices, several separate warehouses, 7 separate mezzanines each under 3,000 square feet and each for separate “tenants” within the overall building, new plumbing, new mechanical, new electrical, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection3/20/20173/20/20173/20/2017PPASS
DetailsTroy Cobbley
life safety passed per Scott Arellano
BLD-Final3/17/20173/20/20173/20/2017PPASS
DetailsJim Storey
Tom Phone #: ###-#### final ok
BLD-Final3/17/20173/17/20173/17/2017PNR
DetailsJim Sly
Tom Phone #: ###-####
Need to verify that ACHD has been finaled. Need Fire alarm, Fire sprinkler and Fire/ Life safety Finals, To obtain C of O.
BLD-Final2/16/20172/16/20172/16/2017PPASS
DetailsJim Storey
Tom Phone #: ###-#### final ok
BLD-Aging Inspection2/14/20172/14/20172/15/2017 PASS
DetailsJim Storey
BLD-Final12/15/201612/16/201612/16/2016APART
DetailsJim Storey
Tom Phone #: ###-#### temp ok/ glazing at 3/4 hr doors
FIRE-Final Inspection12/14/201612/15/201612/15/2016PPART
DetailsJim Page
Partial life fire safety inspection complete for TCO, fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, emergency lighting including exit discharge has been inspected, knox box is in place. Fuel island is still under construction, fuel island is under this permit and will be inspected when completed. Paint booth is to be built at a later date, paint booth has an FIR permit associated with the fire sprinklers that will remain in issued status until paint booth is complete (FIR16-00716) Exit sign that is in place for the paint shop exit is temporary, permanent exit sign for this area is on order, will verify install at a later date. Fire hydrants located on the northwest and southwestside of compound will need to be rotated so the large discharge is not pointing at bollards, fire hydrant rotation will be verified during permanet CO inspection.
BLD-Other12/2/201612/2/201612/2/2016PPASS
DetailsJim Storey
Tom-fire caulking above ceiling Phone #: ###-####
BLD-Ceiling Grid Inspection11/28/201611/29/201611/29/2016APASS
DetailsJim Storey
Tom Phone #: ###-#### ceillings ok all but rated walls
BLD-Other11/17/201611/18/201611/18/2016AFAIL
DetailsJim Storey
Above ceiling // Tom Phone #: ###-#### provide listings for through pentrations
BLD-Ceiling Grid Inspection11/16/201611/17/201611/17/2016APART
DetailsJim Storey
Tom Phone #: ###-####
BLD-Ceiling Grid Inspection11/10/201611/10/201611/10/2016PCANC
DetailsPhil Shearer
Dave Phone #: ###-####
BLD-Conference10/10/201610/11/201610/11/2016APASS
DetailsJim Storey
tom ###-####
BLD-Framing/Rough-in9/29/20169/30/20169/30/2016APART
DetailsDave Hannah
Tom Phone #: ###-#### walked project with contractor
BLD-Framing/Rough-in9/9/20169/9/20169/9/2016PPASS
DetailsJim Storey
Tom Phone #: ###-####
BLD-Framing/Rough-in8/11/20168/12/20168/12/2016APASS
DetailsJim Storey
Tom Phone #: ###-####
BLD-Concrete8/1/20168/2/20168/2/2016PPASS
DetailsJim Storey
Tom Phone #: ###-####
BLD-Conference7/15/20167/18/20167/18/2016APASS
DetailsJim Storey
Fire Wall questions - Tom Phone #: ###-#### 9:00 appt
BLD-Conference7/14/20167/15/20167/15/2016PDEFR
DetailsJim Storey
Fire Wall questions - Tom Phone #: ###-####
BLD-Foundation5/27/20165/27/20165/27/2016PPART
DetailsPhil Shearer
Dave Phone #: ###-####. Pending MTI inspection
BLD-Footing5/19/20165/20/20165/20/2016APART
DetailsJim Storey
Tom Phone #: ###-####placed w si
BLD-Footing5/16/20165/16/20165/16/2016PPASS
DetailsJim Storey
Tom Phone #: ###-#### with si
BLD-Wall cover5/12/20165/13/20165/13/2016APASS
DetailsJim Storey
Tom Phone #: ###-####
BLD-Wall Bracing5/11/20165/12/20165/12/2016ADEFR
DetailsJim Storey
Tom Phone #: ###-#### out of time
BLD-Foundation5/4/20165/5/20165/5/2016APASS
DetailsJim Storey
Rebar // Tom Phone #: ###-####wip/si
BLD-Footing4/28/20164/29/20164/29/2016APASS
DetailsJim Storey
Spread footing & stemwall with 10AM pour - Tom Phone #: ###-####w/si
BLD-Other4/26/20164/27/20164/28/2016PPASS
DetailsJim Storey
slab on grade - Tom Phone #: ###-####si pending out of time
BLD-Foundation4/19/20164/19/20164/20/2016PPASS
DetailsJim Storey
Tom Phone #: ###-####
BLD-Footing4/14/20164/14/20164/14/2016PPASS
DetailsJim Storey
Tom-spread footing and pier pads Phone #: ###-#### placed w/si
BLD-Footing4/8/20164/12/20164/12/2016APASS
DetailsJim Storey
Tom Phone #: ###-####
BLD-Footing4/7/20164/8/20164/8/2016APASS
DetailsJim Storey
would like call ahead; Dave Phone #: ###-####
BLD-Foundation4/4/20164/5/20164/5/2016APASS
DetailsJim Storey
would like call ahead; Tom Phone #: ###-####pwsi
BLD-Footing3/31/20164/1/20164/1/2016PPASS
DetailsJim Storey
Tom Phone #: ###-#### placed w si
BLD-Foundation3/30/20163/31/20163/31/2016APART
DetailsJim Storey
would like call ahead; Tom Phone #: ###-#### wall ok pend s
BLD-Foundation3/25/20163/28/20163/28/2016APART
DetailsMike Jordan
Tom Phone #: ###-####. West concrete wall and column pad footings at main building. COlumn pad footings need rings at 3 inches on center and crossties. Special inspector to verify repair.
BLD-Footing3/21/20163/22/20163/22/2016ADEFR
DetailsMike Jordan
Tom// 1pm pour time Phone #: ###-####. Special inspector on site.
BLD-Footing3/18/20163/21/20163/21/2016ACANC
DetailsJim Storey
Tom Phone #: ###-####
BLD-Foundation3/16/20163/17/20163/17/2016APART
DetailsJim Storey
10:30 pour; Tom Phone #: ###-####pwsi
BLD-Footing3/10/20163/11/20163/11/2016APASS
DetailsJim Storey
Tom Phone #: ###-####
BLD-Footing3/8/20163/9/20163/9/2016AFAIL
DetailsJim Storey
Tom Phone #: ###-#### fill without compaction/ rebar in the dirt bottom and sides of foottings
BLD-Foundation2/29/20163/1/20163/1/2016APART
DetailsJim Storey
Wall // Tom Phone #: ###-#### pending si reports
BLD-Footing2/23/20162/24/20162/24/2016APASS
DetailsJim Storey
Tom Phone #: ###-####pending si
BLD-Footing2/17/20162/18/20162/18/2016APART
DetailsJim Storey
Tom Phone #: ###-#### pending si