Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberBLD15-03423
StatusFinaled
Name Michael Brown
Site Address 505 W BROAD ST
Project NameThe Fowler - East Building
Customer NumberREF: BLD15-03424 & 3835
ePlanReviewYes
Description
(THE FOWLER - The East Building – On Top of podium)Plan modification for gas fire pit and BBQ on common roof area and added gas line for future restaurante. 12/19/16**ajs** PLAN MODIFICATION TO ALLOW HEAVY TIMBER CHAR RATING IN ADDITIONAL LOCATION AS SHOWN ON REVISED DRAWING AND CALCULATIONS. THIS IS THE SAME METHOD ACCEPTED IN OTHER LOCATIONS IN THE SAME BUILDINGS AS NOTED IN THE PLAN REVIEW REPORT **AJS11-10-16****Permit to construct a new 88,615 square foot (5) story apartment building on top of the podium submitted under BLD15-02043. Each floor is approximately 17,723 square feet. Approval contingent upon adhering to the approved plans on file and attached engineering. This building is fully fire sprinklered with an NFPA 13 system to comply with the 5 story wood construction ordinance. Scope of work includes: construction of wood frame five story building, installation of interior non-bearing walls and bearing walls to create 109 individual units, new plumbing, new electrical, new mechanical, new insulation, new windows, new doors, and interior finishes in compliance with Chapter 8 of the 2012 IBC. This building will be sprinklered with a fully compliant NFPA 13 system to comply with the 5 story wood construction ordinance. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/7/20183/8/20183/7/2018APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Final2/28/20183/1/20183/2/2018PPEND
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Final3/1/20183/2/20183/2/2018APASS
DetailsDave Hannah
Jason Phone #: ###-####
FIRE-Final Inspection2/28/20183/1/20183/1/2018APASS
DetailsJim Page
Final life fire safety inspection for this permit complete.
BLD-Final2/16/20182/16/20182/16/2018PPART
DetailsDave Hannah
floor 3-7 // ok for tem occ on 3rd and 4th floors
FIRE-Final Inspection2/14/20182/15/20182/15/2018APART
DetailsJim Page
Previously noted items for phase 4 TCO have been addressed/repaired, life fire safey inspection for phase 4 TCO complete.
FIRE-Final Inspection2/1/20182/1/20182/1/2018PPART
DetailsJim Page
Final life fire safety inspection for TCO requested areas for phase 3 complete.
BLD-Final2/1/20182/1/20182/1/2018PPEND
DetailsDave Hannah
Jason Phone #: ###-####
FIRE-Final Inspection1/29/20181/29/20181/29/2018PPART
DetailsJim Page
Fire spinkler inspection for levels 5, 6 and 7 complete, fire alarm testing for levels 5, 6 and 7 complete, fire extinguishers are in place with current inspection tags on levels 5, 6 and 7. Generator transfer for emergency lighting has been tested and complete. Exterior signage for roof top access still needs to be installed as well as discussed signage for apartment units and common areas. Stairwell pressurization to be completed at a later date.
BLD-Final1/25/20181/26/20181/29/2018PPEND
DetailsDave Hannah
Level 5-7 // Jason Phone #: ###-####
FIRE-Final Inspection1/25/20181/26/20181/26/2018PCANC
DetailsJim Page
Inspection request for life fire safety TCO will be rescheduled for 29JAN2018.
BLD-Final1/19/20181/23/20181/23/2018PPEND
DetailsDave Hannah
Jason-floors 6 and 7 Phone #: ###-####
FIRE-Final Inspection1/22/20181/23/20181/23/2018ACANC
DetailsJim Page
Issues with fire alarm on level 6, more testing needs to be completed before TCO, this request is cancelled.
FIRE-Final Inspection1/19/20181/22/20181/22/2018ACANC
DetailsJim Page
Due to inspection load, this inspection will be rescheduled by Jason Phone #: ###-#### for 9AM, this request is cancelled.
BLD-Conference1/9/20181/10/20181/10/2018ADONE
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Ceiling Grid Inspection10/13/201710/16/201710/16/2017APART
DetailsDave Hannah
3rd floor- Monty Phone #: ###-####west side drop ceilings ok
BLD-Ceiling Grid Inspection9/29/201710/2/201710/2/2017APASS
DetailsDave Hannah
All of level 4 ceiling inspection at drop lids in units and common area corridors for drywall cover. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
BLD-Framing/Rough-in9/5/20179/6/20179/6/2017APASS
DetailsDave Hannah
Monty Phone #: ###-####
BLD-Ceiling Grid Inspection9/5/20179/5/20179/5/2017PNR
DetailsDave Hannah
Monty Phone #: ###-####
BLD-Framing/Rough-in8/28/20178/29/20178/29/2017APASS
DetailsDave Hannah
Inspection request for Tower B Shaft walls and 6th Floor Drop Ceiling Framing. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Framing/Rough-in8/23/20178/24/20178/24/2017APASS
DetailsDave Hannah
Inspection request for Tower A shafts at 3rd and 4th floors. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Wall cover8/21/20178/23/20178/24/2017APASS
DetailsDave Hannah
Inspection request for Tower A Shafts at 3rd and 4th floors. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Wall cover8/16/20178/18/20178/23/2017APASS
DetailsDave Hannah
Inspection request for Tower A 6th floor shafts Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Wall cover8/15/20178/16/20178/16/2017APASS
DetailsDave Hannah
Inspection request for Tower A, 7th Floor Shaft Walls. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Energy code compliance7/7/20177/10/20177/10/2017APASS
DetailsDave Hannah
Inspection request for Fire Caulking at the 5th Floor of Tower A. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Energy code compliance7/6/20177/7/20177/7/2017APART
DetailsDave Hannah
Inspection request for Tower A, 5th floor Fire Caulking. Consultation regarding Hollow Metal Door Frame grout or fire rated spray foam. Phone #: ###-#### Inspection requested via web by Carl Benjamin needs to install callorson larger pipes
BLD-Wall cover6/30/20177/3/20177/3/2017APART
DetailsMike Jordan
Inspection request for 2hr Rated Shaft assemblies at Tower A. Please contact Monty when you arrive at site.
Need to sign the inspection book for the Insulation cover at 2nd floor and 5th floor Tower B. Thank you Dave. Phone #: ###-#### Inspection requested via web by Carl Benjamin. A wing shafts, 3rd. floor to roof, interior portions only.
BLD-Energy code compliance6/29/20176/30/20176/30/2017APASS
DetailsDave Hannah
Inspection request for the 2nd floor insulation Phone #: ###-#### Inspection requested via web by Carl Benjamin also insulation on 5th floor bwing
BLD-Energy code compliance6/27/20176/28/20176/28/2017APASS
DetailsDave Hannah
Inspection request for the 5th floor Tower B. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Energy code compliance6/22/20176/23/20176/23/2017APART
DetailsBrandon Shaw
Tower B, Floors 3 thru 7 Corridor Insulation and Barriers.
BLD-Energy code compliance6/19/20176/20/20176/20/2017APASS
DetailsDave Hannah
Insulation Inspection for the 7th floor. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Energy code compliance6/12/20176/13/20176/13/2017APASS
DetailsDave Hannah
Energy code for units 601, 602, and 605. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Energy code compliance6/9/20176/9/20176/9/2017APASS
DetailsDave Hannah
BLD-Framing/Rough-in6/9/20176/9/20176/9/2017APASS
DetailsDave Hannah
BLD-Energy code compliance6/7/20176/8/20176/8/2017APASS
DetailsDave Hannah
Inspection request for 6th floor Tower A Insulation and Barrier. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Wall cover6/2/20176/5/20176/6/2017APART
DetailsDave Hannah
Fire Caulking and cover Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Framing/Rough-in5/26/20175/30/20175/30/2017ANR
DetailsDave Hannah
6th floor - Carl Phone #: ###-####
BLD-Framing/Rough-in5/9/20175/10/20175/10/2017APART
DetailsDave Hannah
Chris Phone #: ###-#### 6th floor hall area a ok to cover
BLD-Aging Inspection3/8/20173/8/20173/8/2017 PEND
DetailsDave Hannah
BLD-Framing/Rough-in10/24/201610/25/201610/25/2016APASS
DetailsDave Hannah
Inspection request for the sheeting at the 2 hour separation walls. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Conference9/6/20169/7/20169/7/2016ADONE
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Framing/Rough-in8/25/20168/26/20168/26/2016ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Framing/Rough-in8/15/20168/16/20168/16/2016ADONE
DetailsMike Jordan
Framing for the 3rd floor. Phone #: ###-#### Inspection requested via web by Carl Benjamin. Went over rated construction with contractor.