BLD-Final | 3/7/2018 | 3/8/2018 | 3/7/2018 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Final | 2/28/2018 | 3/1/2018 | 3/2/2018 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Final | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
FIRE-Final Inspection | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for this permit complete.
|
BLD-Final | 2/16/2018 | 2/16/2018 | 2/20/2018 | P | DONE |
Dave Hannah
|
|
|
floor 3-7 //
|
FIRE-Final Inspection | 2/14/2018 | 2/15/2018 | 2/15/2018 | A | PART |
Jim Page
|
|
|
Previously noted items for phase 4 TCO have been addressed/repaired, life fire safey inspection for phase 4 TCO complete.
|
BLD-Final | 2/9/2018 | 2/12/2018 | 2/13/2018 | P | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### 3rd and 4th floor apartments ok to occ temp occ
|
FIRE-Final Inspection | 2/9/2018 | 2/12/2018 | 2/12/2018 | A | FAIL |
Scott Arellano
|
|
|
Walk through inspection for 3rd and 4th floors. Missing sprinkler escushions in 3 rooms; missing fire extinguishers in corridors, missing main building address (505 west Broad); fire safety diagrams for individual units not present; missing exterior stairwell signage indicating rooftop access; need maximum occupant load signage posted at 3rd floor assembly area indicating max 71 persons.
|
FIRE-Final Inspection | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PART |
Jim Page
|
|
|
Final life fire safety inspection for TCO requested areas for phase 3 complete.
|
BLD-Final | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Final | 1/29/2018 | 1/30/2018 | 1/30/2018 | A | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
FIRE-Final Inspection | 1/29/2018 | 1/29/2018 | 1/29/2018 | A | PART |
Jim Page
|
|
|
Fire spinkler inspection for levels 5, 6 and 7 complete, fire alarm testing for levels 5, 6 and 7 complete, fire extinguishers are in place with current inspection tags on levels 5, 6 and 7. Generator transfer for emergency lighting has been tested and complete. Exterior signage for roof top access still needs to be installed as well as discussed signage for apartment units and common areas. Stairwell pressurization to be completed at a later date.
|
BLD-Final | 1/25/2018 | 1/26/2018 | 1/29/2018 | P | PEND |
Dave Hannah
|
|
|
Level 5-7 // Jason Phone #: ###-####
|
FIRE-Final Inspection | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | CANC |
Jim Page
|
|
|
Inspection request for life fire safety TCO will be rescheduled for 29JAN2018.
|
BLD-Final | 1/17/2018 | 1/18/2018 | 1/19/2018 | P | PEND |
Dave Hannah
|
|
|
6th and 7th floor Building Final Walk - Review ADA items with Architect based on Thurdsay''s walk. Phone #: ###-#### Inspection requested via web by Duel Christiansen
|
BLD-Final | 1/15/2018 | 1/16/2018 | 1/17/2018 | P | NR |
Dave Hannah
|
|
|
Levels 6 ; 7 Phone #: ###-#### Inspection requested via web by Duel Christiansen
|
BLD-Framing/Rough-in | 12/12/2017 | 12/13/2017 | 12/13/2017 | A | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### ok to cover ceiling third floor common area
|
BLD-Framing/Rough-in | 9/15/2017 | 9/18/2017 | 9/18/2017 | A | FAIL |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 9/6/2017 | 9/8/2017 | 9/11/2017 | A | PASS |
Dave Hannah
|
|
|
drop ceilings and shafts // Monte Smith Phone #: ###-####
|
BLD-Other | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | PART |
Dave Hannah
|
|
|
Shaft- Chris Phone #: ###-#### ok to start covering outer layers of shafts
|
BLD-Conference | 7/24/2017 | 7/24/2017 | 7/24/2017 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-#### elev shafts ok to start covering
|
BLD-Energy code compliance | 6/14/2017 | 6/15/2017 | 6/15/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for the 7th floor fire caulking. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Framing/Rough-in | 5/12/2017 | 5/15/2017 | 5/15/2017 | P | PART |
Dave Hannah
|
|
|
Chris Phone #: ###-#### 6th floor corradors ok to cover lids and top two ft
|
BLD-Conference | 12/16/2016 | 12/19/2016 | 12/19/2016 | A | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Conference | 12/16/2016 | 12/16/2016 | 12/16/2016 | P | PASS |
Jim Storey
|
|
|
Conference regarding Shafts through the roof assembly. Phone #: ###-#### Inspection requested via web by Carl Benjaminshaft to roof deck ok
|
BLD-Conference | 11/30/2016 | 11/30/2016 | 12/1/2016 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Conference | 11/14/2016 | 11/15/2016 | 11/15/2016 | A | DONE |
Dave Hannah
|
|
|
Would like to coordinate this inspection with Dave Hannah and the Mechanical Inspectors to discuss Non-Rated Walls and Dryer Duct. If you could call to let me know what time you can visit the site, I will notify Chad to be here at the same time tomorrow morning. Thanks. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|