BLD-Final | 4/5/2017 | 4/6/2017 | 4/6/2017 | P | PASS |
Jim Sly
|
|
|
David Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 3/1/2017 | 3/2/2017 | 3/2/2017 | A | PART |
Jim Sly
|
|
|
David Phone #: ###-#### OK for Temp Occ. OK for Perm Occ when Zoning signs off for Perm Occ.
|
BLD-Final | 2/28/2017 | 3/1/2017 | 3/1/2017 | A | NR |
Jim Sly
|
|
|
David Phone #: ###-#### Need Public Works.
|
FIRE-Final Inspection | 2/24/2017 | 2/27/2017 | 2/27/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Documentation was provided where the fire dept approved the new fire hydrant location. Plan modifications have been submitted to get the deletion of the north door approved. I let the contractor know that the door hardware on the south/rear exit door is to be single action and will be verified by the building inspector.
|
FIRE-Final Inspection | 2/24/2017 | 2/24/2017 | 2/24/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the fire extinguishers and lower to less than 5', provide documentation for fire hydrant location approval, provide documentation for deletion of north facing exit door, mount missing exit sign and then test all exit signs and emergency lights.
|
BLD-Ceiling Grid Inspection | 2/1/2017 | 2/2/2017 | 2/1/2017 | A | PASS |
Jim Sly
|
|
|
David Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/30/2017 | 1/30/2017 | 1/30/2017 | P | PASS |
Jim Sly
|
|
|
Acoustic ceiling, please call ahead to meet on-site - David Phone #: ###-####
|
BLD-Energy code compliance | 10/24/2016 | 10/25/2016 | 10/25/2016 | A | PASS |
Jim Sly
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 10/12/2016 | 10/12/2016 | 10/12/2016 | P | PART |
Jim Sly
|
|
|
Jason Phone #: ###-#### C/N.........Arch to resubmit for approval.....Omit North Exterior door and install window. Fireblock interconnections between Vertical and Horizontal spaces. Mech needs to sign off floor dampers. OK to insulate walls only.
|
BLD-Conference | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | DONE |
Jim Sly
|
|
|
David Phone #: ###-####
|
BLD-Concrete | 5/5/2016 | 5/6/2016 | 5/6/2016 | A | PASS |
Jim Sly
|
|
|
Steam wall // David Phone #: ###-#### OK pending MTIspecial insp, tests and approvals.
|
BLD-Footing | 5/3/2016 | 5/4/2016 | 5/4/2016 | A | PART |
Jim Sly
|
|
|
David Phone #: ###-#### Crawl footing OK pending MTI special insp, tests and approvals.
|
BLD-Other | 4/27/2016 | 4/27/2016 | 4/27/2016 | P | PART |
Jim Sly
|
|
|
davis - basement wall Phone #: ###-#### Basement wall OK pending MTI special inspection, tests and approvals.
|
BLD-Footing | 4/22/2016 | 4/25/2016 | 4/25/2016 | A | PART |
Jim Sly
|
|
|
David Phone #: ###-#### Basement footing only......OK pending MTI special inspections, tests and approvals.
|
BLD-Footing | 4/21/2016 | 4/22/2016 | 4/22/2016 | A | CANC |
Jim Sly
|
|
|
David Phone #: ###-####
|