Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD15-04495
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 8000 S FEDERAL WAY
Project NameMicron B51 Mat Slab
Customer NumberC24074
ePlanReviewYes
Description
C24074**Do not delete this number**(MICRON)(BLDG 51) THIS APPLICATION IS FOR A PARTIAL MAT SLAB ONLY, The slab is approximately 210’ X 480’ x 32” deep and has the reinforcement in it for the subsequent cast in place columns (to be submitted in a subsequent package)Also includes electrical conduit and grounding.
Micron Project No. C24074 - Micron Technology is building a new R&D 300mm Research and Development Facility (B51) at the Boise campus. The main building (B51) extending south from B50 has an estimated gross footprint of approximately 168,000 square feet of Type I construction. sub-fab, fab, and interstitial levels and will be comprised of the following areas:
• Approximately 56,400 square feet of production ballroom cleanroom (H5 occupancy).
• Approximately 56,400 square feet of production ballroom cleanroom cold shell (H5 occupancy).
• Approximately 11,200 square feet of chemical building with separation for incompatibles (H2 occupancy).
• Approximately 3,200 square feet of oxidizer and inert gas rooms with separation for incompatibles (H2 occupancy). Vestibule and loading dock will be needed.
• The remaining square footage on multiple levels includes east and west mechanical rooms, electrical rooms, smock and bootie room, etc. (H5 occupancy).
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/1/201911/1/201911/1/2019APASS
DetailsJim Storey
DOC - Permit Finaled11/1/201911/1/201911/1/2019PPASS
DetailsJim Storey
BLD-Other4/3/20194/3/20194/3/2019APEND
DetailsJim Storey
Expires: 08/24/16
BLD-Conference6/14/20176/15/20176/16/2017ADONE
DetailsJim Storey
meet w/paul
BLD-Foundation2/25/20162/26/20162/26/2016PPART
DetailsJim Storey
rebar; Gogi Phone #: ###-####rebar ok/ clearances to be verified by si pending reports
BLD-Foundation2/8/20162/12/20162/12/2016APART
DetailsJim Storey
would like call ahead, rebar; Cody Phone #: ###-#### ok pending si reports
BLD-Foundation2/8/20162/10/20162/10/2016PPART
DetailsJim Storey
rebar; Cody Phone #: ###-#### 2nd slab placment pending waterstop instal.
BLD-Foundation1/27/20161/29/20161/29/2016PPART
DetailsJim Storey
rebar-Gogi Phone #: ###-#### rebar ok/coulper engineering stamped doc for change of plan pending/moxi aproved with water stopping strips/ pending si report
BLD-Foundation1/27/20161/27/20161/27/2016PPART
DetailsJim Storey
partial rebar-Gogi Phone #: ###-#### wip/ pending bar buttsplice submital/ moxi with const joint key way/
BLD-Footing1/21/20161/22/20161/22/2016APART
DetailsJim Storey
rebar; Ben Phone #: ###-#### progress ok
BLD-Foundation1/21/20161/21/20161/21/2016PDEFR
DetailsJim Storey
rebar; Ben Phone #: ###-#### need aproval from engery code for concrete additive to meet perm rating under slab.