Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD16-00307
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 8000 S FEDERAL WAY
Project NameMicron B51 Foundation Permit
Customer NumberC24074
ePlanReviewYes
Description
C24074**Do not delete this number**(MICRON – B51 – Foundation Only Permit) Permit to continue with the foundation of this new 168,000 square feet H5 fabrication building. Previous “Mat Slab” approved under BLD15-04495. Scope of work includes: concrete foundations, including areas west of the midway line between gridline R and S and east of the midway line between gridlines C and D at Level 10, the design of the concrete foundation walls up to Level 20, the design of the concrete columns up to Level 15 (waffle floor, and the foundations at Level 20 at the east and west wings of the building. It does not include the design of the Pyrophoric Bunker building east of the proposed B51 building nor the suspended structural steel floor framing at Level 20. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/24/201910/24/201910/24/2019PPASS
DetailsJim Storey
DOC - Permit Finaled10/24/201910/24/201910/24/2019PPASS
DetailsJim Storey
BLD-Conference4/3/20194/3/20194/3/2019APEND
DetailsJim Storey
Expires: 08/16/17
BLD-Foundation2/21/20172/21/20172/21/2017PPEND
DetailsTony Young
Rebar inspection for the walls south the elevator on the west side. Gridlines 35 to 39 on V.8. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski// pending special inspection report
BLD-Foundation2/16/20172/17/20172/17/2017PPASS
DetailsJim Storey
Rebar inspection on the west footings at level 20, from grids 20 to 39 including the S;C pad and Generator pad. Rebar inspection for the wall at level 20 on the East between grids 21 and 24. Please call Dan Koski with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Concrete12/21/201612/21/201612/21/2016PPEND
DetailsDave Hannah
Rebar inspection for the east side foundations at level 20. Please contact Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski crew will tent and heat
BLD-Conference12/5/201612/6/201612/6/2016PNR
DetailsJim Storey
East Foundation Rebar inspection. Grids 17-24, A.9 to CC. Please call Dan if you have any issues. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Conference11/30/201612/1/201612/1/2016APART
DetailsJim Storey
Rebar inspection on 48 line beam from M to H. Visual on waterproofing along U.8 20 thru 26. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski work in progress pending si aproval/ west wall ele penatrations membrane required to be instaled
BLD-Conference11/22/201611/23/201611/23/2016APASS
DetailsJim Storey
Rebar inspection on 48 line beam S.1 to Q.5. Please call with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Framing/Rough-in11/21/201611/21/201611/21/2016PFAIL
DetailsJim Storey
Framing inspection West wall and North wall contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson (MICRON – B51 – Foundation Only Permit) Permit to continue with the foundation of this new 168,000 square feet H5 fabrication building. Previous “Mat Slab” approved under BLD15-04495. Scope of work includes: concrete foundations, including areas west of the midway line between gridline R and S and east of the midway line between gridlines C and D at Level 10, the design of the concrete foundation walls up to Level 20, the design of the concrete columns up to Level 15 (waffle floor, and the foundations at Level 20 at the east and west wings of the building. It does not include the design of the Pyrophoric Bunker building east of the proposed B51 building nor the suspended structural steel floor framing at Level 20. **TLW** need aproved permit and plans.
BLD-Conference11/17/201611/17/201611/17/2016APASS
DetailsJim Storey
Rebar and Mesh inspection for Building 51. South wall at 48 line and SE Deck at Elevation 30, B/32 grids. Please call Dan with any issue. Phone #: ###-#### Inspection requested via web by Dan Kosk

rebar ok waterproofing ok/decks aproved to cover i
BLD-Conference11/9/201611/10/201611/15/2016PDONE
DetailsJim Storey
Rebar inspection for 48 line wall from R.5 to M.5. Please call with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski placed with si/ off work others where to insp.
BLD-Framing/Rough-in10/25/201610/26/201610/26/2016APEND
DetailsJim Storey
This is a inspection for walls under permit number BLDG16-03892 but that permit is not showing on online Please contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson ron hill call back as to stadus of permit.
BLD-Conference10/19/201610/20/201610/20/2016APASS
DetailsJim Storey
Rebar inspection for Level 20 East Foundations, South wall on 48 line, SOD mesh East Mechanical. Please call Dan Koski with any issues. Phone #: ###-#### Inspection requested via web by Dan Koskipending of si
BLD-Conference9/22/20169/23/20169/23/2016APASS
DetailsJim Storey
Rebar inspection for the beams on S/B/C lines from 44 line to 48. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Conference9/16/20169/16/20169/16/2016PPASS
DetailsJim Storey
Mesh inspection for Elevation 30, U.8 to S line 28.5 to 38.5. Rebar inspection for mechanical pads north of this same area. Please Call Dan Koski with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Conference9/13/20169/13/20169/13/2016PPASS
DetailsJim Storey
Rebar inspections for the South Wall on 48 line between S-Q, and mesh inspection for the Slab on Deck at Elevation 20, U.8 to S between 28.5 and 38. Please call Dan with any questions- ###-####. Phone #: ###-#### Inspection requested via web by Dan Koskiwip si pending
BLD-Conference8/29/20168/29/20168/30/2016PPASS
DetailsJim Storey
Rebar inspection request @ 48/AA wall. Please call Dan Koski with any questions. ###-#### Phone #: ###-#### Inspection requested via web by Dan Koski placed with si
BLD-Conference8/17/20168/18/20168/18/2016PPASS
DetailsJim Storey
Mesh inspection on Elevation 30 from 17.8 to 28.5 and S to U.8. Please contact Lenny Thomason with an questions. Dan K. will be off site until Monday. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Conference8/17/20168/18/20168/18/2016APASS
DetailsJim Storey
Rebar inspection request for U.8/49 wall on the south. Please contact Lenny Thomason for any questions. Dan K. is out until Monday Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Conference8/11/20168/11/20168/11/2016PPASS
DetailsJim Storey
Rebar Inspection for 10b Slab @ 46/AA. Please call Dan Koski with any questions ###-####. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Conference8/9/20168/10/20168/10/2016PPART
DetailsJim Storey
Mesh/Rebar inspection for Slab on Deck at Elevation 20, between Grids 17.8 to 28.5 and U.8 to S. Please call Dan Koski with any concerns ###-#### Phone #: ###-#### Inspection requested via web by Dan Koski si to verify 2/3 bearing and no bolt weld length west wall
BLD-Conference8/5/20168/5/20168/5/2016PPASS
DetailsJim Storey
Rebar inspection for U.8 line wall @ elevator. Please contact Dan Koski with any questions ###-#### Phone #: ###-#### Inspection requested via web by Dan Koski wip/si pending
BLD-Conference8/3/20168/3/20168/3/2016APASS
DetailsJim Storey
Inspection request for rebar on U.8 line wall and B/C line Beams. Please contact Dan with any questions: ###-#### Phone #: ###-#### Inspection requested via web by Dan Koski si on site
BLD-Aging Inspection7/28/20167/28/20167/28/2016 PASS
DetailsJim Storey
BLD-Conference7/18/20167/19/20167/19/2016APASS
DetailsJim Storey
Rebar inspection request on Slab @ 36/U.8. Rebar inspection on the wall @ U.8/39. 2'''' expansion inspection/waterproofing at 17.8/S, 29/B. Any questions please call Dan ###-####. Phone #: ###-#### Inspection requested via web by Dan Koski pad rebar wip si to pick up.
BLD-Conference7/11/20167/11/20167/11/2016APASS
DetailsJim Storey
Rebar inspection on the west wall (U.8) 46 to 42. Please call Dan Koski with any questions. ###-#### Phone #: ###-#### Inspection requested via web by Dan Koski w/si
BLD-Conference7/8/20167/8/20167/8/2016PPASS
DetailsJim Storey
Rebar inspection on Elevator pit and Building 50/51 East tie in @ C/17.3 line. Concrete is scheduled for tomorrow morning. Please call Dan with any questions. ###-#### Inspection requested via web by Dan Koski
BLD-Conference7/7/20167/7/20167/7/2016APART
DetailsJim Storey
Rebar inspection on Elevator pit at grids U.8/36. Final rebar inspection request for AA grid wall on the east. Please call Dan Koski for any questions ###-#### Inspection requested via web by Dan Koski pending si
BLD-Conference7/5/20167/6/20167/7/2016APART
DetailsJim Storey
AM Rebar inspection for S line beam between grid 29 and 34. Wall rebar inspection for AA grid 31 to 34. Please call Dan Koski ###-#### for any questions. Placement scheduled for 1030am for the beam. Inspection requested via web by Dan Koski 316 si
BLD-Conference6/29/20166/30/20166/30/2016APART
DetailsJim Storey
Steel inspections. Please contact Travis Clay. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse rfi col base
BLD-Conference6/28/20166/30/20166/30/2016APASS
DetailsJim Storey
Rebar Reinforcement in Beam on grids B/C between 27 -31.
Rebar Reinforcement in Slab 12 between S and U.8 and 49 to 37.5.
Please contact Dan Koski. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse
BLD-Conference6/28/20166/29/20166/29/2016PDEFR
DetailsJim Storey
Steel inspections. Please contact Travis Clay. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse
BLD-Conference6/28/20166/29/20166/29/2016APASS
DetailsJim Storey
Reinforcement in Misc Columns on Slabs 13 and 15.
Please contact Dan Koski. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse
BLD-Foundation6/16/20166/17/20166/17/2016APEND
DetailsDave Hannah
Rebar wall inspection west wall U.8 from 25.5 to 30-line.
Rebar slab inspection S to M.5 from 30.5 to 37.5-line. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse ok after s/i signs off
BLD-Conference6/13/20166/13/20166/13/2016PPASS
DetailsJim Storey
Rebar wall on B-line from 27.8 to 29-line
Waterproofing on the north 17.8-line from R to L and K to D-line.
Phone #: ###-#### Inspection requested via web by gogi gwardschaladse
BLD-Conference6/8/20166/9/20166/9/2016APASS
DetailsJim Storey
Beams on S line and columns continuing on B/C/D lines
Columns on B/C/D lines Phone #: ###-#### Inspection requested via web by gogi gwardschaladse engineering mod ok
BLD-Conference6/3/20166/3/20166/3/2016PPASS
DetailsJim Storey
Rebar inspection for mat slab 10a B-AA-line 29-34-line. partial rebar wall inspection on U.8 from 22-26-line. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse
BLD-Conference6/1/20166/2/20166/2/2016APASS
DetailsJim Storey
Rebar inspection for underground conduits. west side t.8 42-46-line Phone #: ###-#### Inspection requested via web by gogi gwardschaladse
BLD-Conference6/1/20166/1/20166/1/2016APART
DetailsJim Storey
Rebar inspection for underground conduit encasement t.8 42-46-line. Phone #: ###-#### Inspection requested via web by gogi gwardschaladseout of time si report pending
BLD-Conference5/26/20165/27/20165/26/2016PCANC
DetailsJim Storey
North wall Waterproofing Phone #: ###-#### Inspection requested via web by gogi gwardschaladse
BLD-Conference5/26/20165/26/20165/26/2016PPASS
DetailsJim Storey
U.8 wall Final wall inspection afternoon, rebar/waterstop- tomorrow 5/26
Slab 15 Final rebar inspection afternoon, rebar-tomorrow 5/26

Phone #: ###-#### Inspection requested via web by gogi gwardschaladse
BLD-Conference5/25/20165/25/20165/25/2016AFAIL
DetailsJim Storey
Waterstop and Waterproofing inspections at S/17.8 and 17.8/B grid lines. Phone #: ###-#### Inspection requested via web by Dan Koski back filled with out inspection short of ele duct bank
BLD-Conference5/20/20165/20/20165/20/2016PPART
DetailsJim Storey
rebar inspection for Wall at 17.8 and T-U line.
Troy Gonzales will be the contact. Phone #: ###-#### Inspection requested via web by Troy Gonzales ok pending si aproval
BLD-Conference5/18/20165/20/20165/20/2016APASS
DetailsJim Storey
Rebar inspection for the concrete beams on C-line 17.8 to 24.5-line. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse rated expation joint above grade at north wall need rfi and hourly rating.
BLD-Conference5/12/20165/13/20165/13/2016PPASS
DetailsJim Storey
Rebar inspection for slab 9 to be placed 0n 5/14. cols A.9 to AA, 34 to 40-line. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse need rfi isue of reval on 1 hr grade beam.
BLD-Conference5/10/20165/11/20165/11/2016APASS
DetailsJim Storey
Inspection for the walls and cols. Wall section 17.8-line from J.5 to L.5. cols S - R/ 24-26 area. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse
BLD-Conference5/6/20165/6/20165/6/2016APASS
DetailsJim Storey
We would like a rebar inspection for Slab 6B, 24-32 Line.
Contact Troy Gonzales ###-#### Phone #: ###-#### Inspection requested via web by Troy Gonzales
BLD-Conference4/29/20164/29/20164/29/2016PDEFR
DetailsJim Storey
We would like a rebar inspection for walls @ G-line to M-line. Contact Troy Gonzales ###-#### Phone #: ###-#### Inspection requested via web by Troy Gonzalesending si reports
BLD-Conference4/27/20164/27/20164/27/2016PPART
DetailsJim Storey
Rebar inspection for Slab 7B West side, please contact Troy Gonzales @ ###-#### Phone #: ###-#### Inspection requested via web by Troy Gonzales wip pending si
BLD-Conference4/25/20164/25/20164/25/2016PPEND
DetailsTony Young
Rebar inspection for Slab 6A, inspection requested by Troy Gonzales ###-#### Phone #: ###-#### Inspection requested via web by Troy Gonzales,, special inspector on site,, pending report
BLD-Conference4/20/20164/22/20164/22/2016APASS
DetailsJim Storey
rebar inspection for slab 8 B-E.5-line 30.5-42.5-line east side. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse pending engineers col/ft rfi
BLD-Conference4/14/20164/15/20164/15/2016PPASS
DetailsJim Storey
rebar inspection for slab 6a. col lines Q.6 to M.5 from 17.8 to 24.5-line.building 51 Phone #: ###-#### Inspection requested via web by gogi gwardschaladse
BLD-Conference4/14/20164/14/20164/14/2016PCANC
DetailsJim Storey
Rebar inspection for slab 6a. col lines Q.6 to M.5 from 17.8 to 24.5-line.
building 51. Phone #: ###-#### >> Inspection requested via web by gogi gwardschaladse Inspection cancelled from web by: gogi gwardschaladse
BLD-Conference4/5/20164/8/20164/8/2016APASS
DetailsJim Storey
rebar inspection for mat slab M.5 to A.9/ 24.5 to 30.5. building 51 Phone #: ###-#### Inspection requested via web by gogi gwardschaladse
BLD-Conference4/3/20164/4/20164/4/2016ADEFR
DetailsJim Storey
rebar wall inspection north east side foundation wall. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse placed with si pending report
BLD-Conference3/31/20163/31/20163/31/2016PPASS
DetailsJim Storey
Rebar Inspections for cols Phone #: ###-#### Inspection requested via web by gogi gwardschaladse wip ok pending si reports
BLD-Conference3/29/20163/30/20163/30/2016APART
DetailsJim Storey
Rebar inspection for encasement of conduits. Column rebar at 19-24 grids between M.5 and B. Phone #: ###-#### Inspection requested via web by Dan Koski rebar ok/clearance ok / pending slope footting engineering aproval
BLD-Conference3/29/20163/29/20163/29/2016PPASS
DetailsJim Storey
Columns and Walls Place today starting at 1230pm. Rebar inspection request for columns and walls Between M.5 to B. 17.8 to 24.5. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Conference3/21/20163/21/20163/21/2016PCANC
DetailsJim Storey
Concrete Inspection for East Footing Phone #: ###-#### Inspection requested via web by Dan Koski 34/35=A/B rebar ok
BLD-Wall Bracing3/14/20163/16/20163/16/2016APASS
DetailsJim Storey
Gogi Phone #: ###-#### as noted on site
BLD-Foundation3/9/20163/11/20163/11/2016PPART
DetailsJim Storey
Rebar // Gogi Phone #: ###-####