BLD-Final | 11/30/2016 | 11/30/2016 | 11/30/2016 | P | PASS |
Tony Young
|
|
|
We are working on getting the UL listed doors for the fire sprinkler valve boxes but would like to see if we could get temporary occupancy until then. If needed, I could screw 2'' x 2'' 5/8" sheetrock panels over the doors. Phone #: ###-#### Inspection requested via web by Scott Asin/// made ok
|
DOC - Permit Finaled | 11/30/2016 | 11/30/2016 | 11/30/2016 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin. Provide Ul listed penetration protection per IRC 302.5. Noted all boxes in garage/dwelling unit wall are not listed and other penetration s not protected. Correction notice issued.
|
BLD-Final | 11/28/2016 | 11/28/2016 | 11/28/2016 | P | DEFR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Wall cover | 9/13/2016 | 9/13/2016 | 9/13/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Energy code compliance | 9/13/2016 | 9/13/2016 | 9/13/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Framing/Rough-in | 9/6/2016 | 9/8/2016 | 9/8/2016 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin,, needs sprinkler cover approval prior to cover inspection,, ok to insulate
|
BLD-Wall Bracing | 7/21/2016 | 7/25/2016 | 7/25/2016 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Foundation | 6/15/2016 | 6/16/2016 | 6/16/2016 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 6/14/2016 | 6/15/2016 | 6/16/2016 | P | DONE |
Tony Young
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 6/14/2016 | 6/15/2016 | 6/15/2016 | A | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 6/13/2016 | 6/14/2016 | 6/14/2016 | P | NR |
Tony Young
|
|
|
Dane Phone #: ###-####
|