Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD16-00818
StatusIssued
Name GLOBAK ALEKSANDR
Site Address 220 S COTTERELL DR
Project Name 
Customer Number 
ePlanReviewNo
Description
The scope of work is to construct a 2038 sq. ft. 2-story home with a 500 sq. ft. garage attached onto the rear of the existing residence. Planning will require that the kitchen in the existing residence be removed with only one kitchen located in the new addition. The home will also have a 186 sq. ft. covered front porch with a 128 sq. ft. deck located at the rear of the addition. Electrical, plumbing and HVAC permits will be pulled separately. Work will be performed per the approved plans, engineered detail sections and local codes. **DAF**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Concrete6/2/20206/3/20206/3/2020APASS
DetailsMike Jordan
Alex Phone #: ###-####. Framing for exterior concrete stairs.
BLD-Aging Inspection4/23/20204/23/20204/23/2020 CANC
DetailsMike Jordan
BLD-Aging Inspection4/22/20204/22/20204/23/2020 PASS
DetailsMike Jordan
BLD-Conference12/10/201912/10/201912/10/2019PDONE
DetailsMike Jordan
ALEX Phone #: ###-####
BLD-Framing/Rough-in12/10/201912/10/201912/10/2019PPASS
DetailsMike Jordan
ALEX Phone #: ###-####. Interior wood framed walls for furnace enclosure.
BLD-Framing/Rough-in12/10/201912/10/201912/10/2019PCANC
DetailsMike Jordan
ALEX Phone #: ###-####
BLD-Wall cover6/13/20196/14/20196/14/2019APASS
DetailsMike Jordan
Alexander Phone #: ###-####
BLD-Energy code compliance12/20/201812/21/201812/21/2018APASS
DetailsMike Jordan
Alex Phone #: ###-####
BLD-Framing/Rough-in10/22/201810/22/201810/22/2018PPASS
DetailsMike Jordan
Alex Phone #: ###-####. Ok to insulate.
BLD-Framing/Rough-in10/17/201810/18/201810/18/2018APART
DetailsMike Jordan
Aleksandr Phone #: ###-####. Framing ok. Needs to complete air seal and fireblock above stairs.
BLD-Wall Bracing6/21/20186/22/20186/22/2018ACANC
DetailsMike Jordan
shear // Aleksandr Phone #: ###-####
BLD-Framing/Rough-in6/11/20186/12/20186/12/2018ANR
DetailsMike Jordan
Requests 11AM, late morning - Alek Phone #: ###-####
BLD-Wall Bracing6/11/20186/12/20186/12/2018APASS
DetailsMike Jordan
Requests 11AM, late morning - Alek Phone #: ###-####
BLD-Conference5/15/20185/16/20185/16/2018ADONE
DetailsMike Jordan
Alex Phone #: ###-####. Went over plans and shear walls.
BLD-Concrete3/5/20183/6/20183/6/2018APASS
DetailsMike Jordan
11am please- call when on way- Aleksandr Phone #: ###-####
BLD-Aging Inspection1/25/20181/25/20181/26/2018 PASS
DetailsMike Jordan
BLD - Request for Extension9/6/20179/7/20179/7/2017ADONE
DetailsMike Jordan
Alek Phone #: ###-####. Spoke to Alek, nneds and extension until April 2018. Footings and foundation completed. No framing has begun. Needs to provide letter to building official for extension approval.
BLD-Foundation3/16/20173/16/20173/16/2017PPASS
DetailsMike Jordan
Wall // Debat Phone #: ###-####
BLD-Footing3/13/20173/14/20173/14/2017APART
DetailsMike Jordan
Alex Phone #: ###-####