Permit Information
Permit NumberBLD16-01058
StatusFinaled
Name PENTALON CONSTRUCTION
Site Address 2950 E PARKCENTER BLVD
Project NameArboretum at Barber Station #1
Customer NumberBLD16-01059 & 01060
ePlanReviewYes
Description
(ARBORETUM AT BARBER STATION – Building #1) Plan modification to change shaft design in club house and exterior window trim. 6/12/17 ajs**Plan Modification to change exterior finish from cement board to stucco only** 12/21/16 **ajs**Permit to construct a new 121,503 square foot (5) story apartment building. First floor foundation and concrete podium permit submitted under BLD15-04472. Each floor is approximately 24,176 square feet. Approval contingent upon adhering to the approved plans on file and attached engineering. This building is fully fire sprinklered with an NFPA 13 system to comply with special provisions of section 510.2 and area increase. Scope of work includes: interior finish of the first floor, construction of wood frame 4 story building on top of the previously approved podium, installation of interior non-bearing walls and bearing walls to create 76 individual units, new plumbing, new electrical, new mechanical, new insulation, new windows, new doors, and interior finishes in compliance with Chapter 8 of the 2012 IBC. This building will be sprinklered with special provisions of section 510.2 and area increase. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/6/20186/6/20186/7/2018PPASS
DetailsJim Sly
for perm occ pass on structural
OK for Perm. Occ.
FIRE-Final Inspection5/23/20185/24/20185/24/2018PPASS
DetailsJim Page
Remaining items have been addressed, final life fire safety inspection complete.

Reinspection for Final sign off from TCO Phone #: ###-#### Inspection requested via web by shaun carley
BLD-Final4/30/20185/1/20185/2/2018APART
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by shaun carley
OK for Temp Occ. OK for Perm Occ. when Fire and Zoning signs off for Perm.
FIRE-Final Inspection4/30/20185/1/20185/1/2018PPART
DetailsJim Page
Partial life fire safety inspection for tco complete (30 day TCO per conversation with Ron Johnson) Fire sprinkler inspection complete, fire alarm inspection complete, fire exitnguishers are in place and will get inspection tags installed before final inspection. Items that need to be completed before final is a knox box installed by front entry and emergency evacuation plan for each unit, items will be verified before final C of O
BLD-Final4/27/20184/30/20184/30/2018PCANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by shaun carley Inspection cancelled from web by: shaun carley
BLD-Ceiling Grid Inspection3/21/20183/21/20183/21/2018PPASS
DetailsJim Sly
above ceiling grid inspection on the 2nd and 3rd floor corridors. Phone #: ###-#### Inspection requested via web by shaun carley
BLD-Ceiling Grid Inspection3/5/20183/6/20183/6/2018PPASS
DetailsJim Sly
Above grid inspection in corridors on the 5th and 4th floors. Shaft liner inspection for trash chute in elevator lobbies. Phone #: ###-#### Inspection requested via web by shaun carley
BLD-Ceiling Grid Inspection2/22/20182/23/20182/23/2018APASS
DetailsJim Sly
Fire caulk inspection in the drops in units 309-319 Phone #: ###-#### Inspection requested via web by shaun carley
BLD-Ceiling Grid Inspection2/13/20182/14/20182/14/2018APASS
DetailsJim Sly
Inspect above grid in units 209,210,211,212,213,214,215,216,217,218, and 219. Phone #: ###-#### Inspection requested via web by shaun carley
BLD-Other1/16/20181/16/20181/16/2018PPASS
DetailsJim Sly
Fire caulk inspection in drops units 409-419 and corridor building 1. Phone #: ###-#### Inspection requested via web by shaun carley
BLD-Other1/16/20181/16/20181/16/2018PCANC
DetailsBrandon Shaw
fire caulk in drops for units 409-419 and 4th floor corridor // Shaun ###-####
BLD-Framing/Rough-in12/20/201712/21/201712/21/2017APASS
DetailsJim Sly
drops units 509-519 Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in12/8/201712/8/201712/8/2017PPASS
DetailsJim Sly
Units 201-208 framed drops Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in11/14/201711/15/201711/15/2017APASS
DetailsJim Sly
Units 409-419 ready to insulate. Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in11/10/201711/13/201711/13/2017APASS
DetailsJim Sly
Drop Ceilings units 301-308 Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in10/31/201710/31/201710/31/2017APASS
DetailsJim Sly
North and South Stair Towers and Level 4 drop ceiling areas units 401-408 Phone #: ###-#### Inspection requested via web by Michael West
FIRE-Conference10/26/201710/27/201710/27/2017PDONE
DetailsTroy Cobbley
Tenting of sprinkler lines in units 509-519 passed. Numerous corrections made while I was on site. I also made an entry in the project related fire sprinkler permit activites.
BLD-Framing/Rough-in10/20/201710/20/201710/20/2017APASS
DetailsJim Sly
Units 501-508 fur down ceilings Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in10/13/201710/16/201710/17/2017PPASS
DetailsJim Sly
Units 209-219 Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in10/11/201710/12/201710/12/2017APASS
DetailsJim Sly
Units 509-519 ready to insulate. Phone #: ###-#### Inspection requested via web by Michael West
BLD-Energy code compliance10/5/201710/9/201710/9/2017ANR
DetailsJim Sly
units 209-219 // Matt Fletcher Phone #: ###-####
BLD-Framing/Rough-in10/5/201710/9/201710/9/2017ANR
DetailsJim Sly
units 209-219 // Matt Fletcher Phone #: ###-####
BLD-Framing/Rough-in9/19/20179/19/20179/19/2017APASS
DetailsJim Sly
Level 2 Corridor Ceiling to pre-rock Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in9/8/20179/8/20179/11/2017PPASS
DetailsJim Sly
Units 201-208 ready to insulate Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in8/29/20178/30/20178/30/2017APASS
DetailsJim Sly
Units 301-308 Ready for insulation. Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in8/23/20178/23/20178/23/2017PPASS
DetailsJim Sly
Units 401-408 Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in8/14/20178/15/20178/15/2017APASS
DetailsJim Sly
Units 501-508 ready to insulate. Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in8/2/20178/2/20178/2/2017PPART
DetailsJim Sly
Elevator shaft Phone #: ###-#### Inspection requested via web by Michael West
Elevator shaft OK to cover.
BLD-Conference7/18/20177/18/20177/18/2017PCANC
DetailsJim Sly
BLD-Conference6/29/20176/29/20176/29/2017PPASS
DetailsJim Sly
Mike West Phone #: ###-####
BLD-Concrete10/12/201610/13/201610/13/2016APASS
DetailsPhil Shearer
walls and footings Phone #: ###-#### Inspection requested via web by Michael West