BLD-Final | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PART |
Jim Storey
|
|
|
Call ahead // Scott Phone #: ###-#### final ok pending ele
|
BLD-Conference | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Jim Storey
|
|
|
Scott Phone #: ###-####
|
BLD-Aging Inspection | 2/16/2018 | 2/16/2018 | 2/16/2018 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Conference | 11/24/2017 | 11/27/2017 | 11/27/2017 | A | PART |
Jim Storey
|
|
|
complaint set shipping contrainer (part of permanent building) too close to property line (2 feet), not meeting setbacks or plans.contact planreview to amened plan building stil well with in side set back south side.
|
BLD-Foundation | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | PASS |
Jim Storey
|
|
|
Scott Phone #: ###-####
|
BLD-Foundation | 9/27/2017 | 9/28/2017 | 9/28/2017 | A | PASS |
Jim Storey
|
|
|
Scott Phone #: ###-####
|
BLD-Foundation | 8/3/2017 | 8/4/2017 | 8/4/2017 | A | PART |
Brandon Shaw
|
|
|
6 footings
|
BLD-Foundation | 7/28/2017 | 7/28/2017 | 7/28/2017 | P | PASS |
Jim Storey
|
|
|
Scott-plan mod-piers Phone #: ###-####-please call Scott 30 minutes prior to meet ft ok
|
BLD-Aging Inspection | 6/9/2017 | 6/9/2017 | 6/9/2017 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Wall Bracing | 1/25/2017 | 1/26/2017 | 1/26/2017 | A | PASS |
Jim Sly
|
|
|
Scott Phone #: ###-#### Exterior Panel edge nailing, Screwed panel to perpendicular panel connections, and hold downs on Exterior walls only......OK.
|
BLD-Framing/Rough-in | 1/24/2017 | 1/25/2017 | 1/25/2017 | A | NR |
Tony Young
|
|
|
Please call ahead for access - Scott Phone #: ###-####,, needs trades 1st,, no inspection made,, he will finish hold downs and call for a wall bracing inspection,, also he will get the plumbing direction figured out
|
BLD-Framing/Rough-in | 11/10/2016 | 11/10/2016 | 11/10/2016 | P | PART |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Work in progress on installing panels. Will call for another inspection to verify holdowns.
|
BLD-Foundation | 8/5/2016 | 8/8/2016 | 8/8/2016 | A | PASS |
Jim Storey
|
|
|
would like call ahead; Chuck Phone #: ###-####
|
BLD-Footing | 7/19/2016 | 7/20/2016 | 7/20/2016 | P | PASS |
Jim Storey
|
|
|
Right behind 3519-pour time 2:00 Chuck Phone #: ###-####
|