Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD16-02415
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 8515 W POCONO ST
Project NameSilverCloud Apartments
Customer NumberBLD16-02408 - BLD16-02418
ePlanReview 
Description
(SILVERCLOUD APARTMENTS – BUILDING #4-2 – 4 APARTMENTS – TYPES B2, B1, B1, B2) (DRH16-00080) (PUD16-00003) (11 PERMITS ARE FILED UNDER BLD16-02408 IN EPLANREVIEW) The NFPA 13R fire sprinkler system is used for occupancy. To construct a 2 story apartment building having 4 side-by-side 2 story dwelling units. The dwelling units do not comply as townhomes as defined by the Boise City Code because there are no property lines between them and because the utilities are not separate. This building has a total floor area of about 7,858 square feet (4,383 square feet 1st story and 3,475 square feet 2nd story). Each dwelling unit has 2 stories. None of the dwelling units are required to comply as Type B dwelling units. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud exterior walls, exterior siding, shear walls, wood joist 2nd story floors, doors, windows, interior stairways, gas fireplaces, wood truss roof, roof coverings, millwork, and finishes. Engineered wood trusses are a deferred submittal item. Special Inspection is required for soils, shear walls, diaphragms, concrete, and post-installed anchors. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/14/20191/14/20191/15/2019 PEND
DetailsTony Young
BLD-Aging Inspection11/12/201811/12/201811/13/2018 PEND
DetailsTony Young
BLD-Aging Inspection9/10/20189/10/20189/17/2018 PEND
DetailsTony Young
BLD-Aging Inspection7/10/20187/10/20187/12/2018 PEND
DetailsTony Young
BLD-Aging Inspection5/8/20185/8/20185/9/2018 PEND
DetailsTony Young
BLD-Final3/7/20183/8/20183/8/2018APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue/// final ok pending others
BLD-Aging Inspection2/26/20182/26/20183/1/2018 PEND
DetailsTony Young
BLD-Aging Inspection12/27/201712/27/201712/29/2017 PASS
DetailsTony Young
BLD-Final10/27/201710/30/201710/30/2017APART
DetailsTony Young
Early AM if Possible Contact: Hunter Gomez Phone #: ###-#### Inspection requested via web by Mike McHargue,, temp occupancy ok
FIRE-Final Inspection10/27/201710/30/201710/30/2017APASS
DetailsTroy Cobbley
life safety passed. Fire extinguishers to be added as discussed with Mike by the next inspection.
FIRE-Final Inspection10/27/201710/27/201710/27/2017PCANC
DetailsTroy Cobbley
Need to cancel due to time constraints. Hunter is going to reschedule for monday.

Contact: Hunter Gomez Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Wall Bracing7/20/20177/20/20177/20/2017PPASS
DetailsTony Young
Interior sheer Inspection Phone #: ###-#### Inspection requested via web by Mike McHargue,, interior ok
BLD-Wall Bracing7/20/20177/20/20177/20/2017ACANC
DetailsTony Young
Interior Sheer Nailing Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
BLD-Wall Bracing7/19/20177/19/20177/19/2017PPART
DetailsMike Jordan
Interior Sheetrock sheer/ nailing Phone #: ###-#### Inspection requested via web by Mike McHargue. Noted areas that were missed and complete firecaulking.
BLD-Wall cover7/6/20177/7/20177/7/2017APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance7/6/20177/7/20177/7/2017APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Framing/Rough-in7/3/20177/5/20177/5/2017APASS
DetailsDave Hannah
okto insulate
BLD-Framing/Rough-in6/29/20177/3/20177/3/2017PCANC
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mike McHargue. Moved to wed.
BLD-Wall Bracing6/8/20176/9/20176/9/2017APASS
DetailsTony Young
Mid to Late Morning if Possible. Contact: Hunter Gomez Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Footing4/3/20174/4/20174/4/2017APASS
DetailsTony Young
Thickened slab; Mid-morning if possible Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance3/8/20173/9/20173/10/2017PPASS
DetailsTony Young
Foundation Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Foundation3/6/20173/7/20173/7/2017PCANC
DetailsJim Sly
manuel Phone #: ###-#### Inspection cancelled from web by: Mike McHargue
BLD-Foundation3/6/20173/7/20173/7/2017APASS
DetailsJim Sly
Manuel Phone #: ###-####
BLD-Foundation3/3/20173/6/20173/6/2017PNR
DetailsTony Young
Manual Phone #: ###-####
BLD-Footing3/3/20173/6/20173/6/2017APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue