Permit Information
Permit NumberBLD16-02417
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 6147 N GOODYEAR AVE
Project NameSilverCloud Apartments
Customer NumberBLD16-02408 - BLD16-02418
ePlanReview 
Description
(SILVERCLOUD APARTMENTS – BUILDING #5 – 6 APARTMENTS TOTAL WITH ONE TYPE A – TYPES E, A, B1, B1, A, C) (DRH16-00080) (PUD16-00003) (11 PERMITS ARE FILED UNDER BLD16-02408 IN EPLANREVIEW) The NFPA 13R fire sprinkler system is used for occupancy. To construct a 2 story apartment building having 5 side-by-side 2 story dwelling units and one side-by-side 1 story dwelling unit. The dwelling units do not comply as townhomes as defined by the Boise City Code because there are no property lines between them and because the utilities are not separate. This building has a total floor area of about 12,299 square feet (7,467 square feet 1st story and 4,832 square feet 2nd story). Five dwelling units has 2 stories and one dwelling unit has 1 story. The 1 story dwelling unit is required to comply as a Type A dwelling unit. None of the 2 story dwelling units are required to comply as Type B dwelling units. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud exterior walls, exterior siding, shear walls, wood joist 2nd story floors, doors, windows, interior stairways, gas fireplaces, wood truss roof, roof coverings, millwork, and finishes. Engineered wood trusses are a deferred submittal item. Special Inspection is required for soils, shear walls, diaphragms, concrete, and post-installed anchors. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/17/20191/17/20191/25/2019 PEND
DetailsTony Young
BLD-Aging Inspection11/13/201811/13/201811/16/2018 PEND
DetailsTony Young
BLD-Aging Inspection9/11/20189/11/20189/18/2018 PEND
DetailsTony Young
BLD-Aging Inspection7/10/20187/10/20187/12/2018 PEND
DetailsTony Young
BLD-Aging Inspection5/8/20185/8/20185/8/2018 PEND
DetailsTony Young
BLD-Final3/7/20183/8/20183/8/2018APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue-TONY PW and P & Z finals have not been called in and it looks like it might be a little while before they are called in/// final ok pending others
BLD-Aging Inspection1/8/20181/8/20181/10/2018 PASS
DetailsTony Young
BLD-Aging Inspection11/6/201711/6/201711/8/2017 PEND
DetailsTony Young
BLD-Final9/5/20179/6/20179/6/2017APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue,, temp occ ok pending others
FIRE-Final Inspection9/1/20179/5/20179/5/2017ACANC
DetailsJim Page
Life fire safety inspetion completed on 01SEPT2017
FIRE-Final Inspection9/1/20179/1/20179/1/2017PPASS
DetailsJim Page
Fire sprinkler inspection complete (FIR16-00755), final fire alarm inspection complete, kno box will be installed when received, final life fire safety inspection passed/complete.
FIRE-Final Inspection8/30/20178/31/20178/31/2017ACANC
DetailsJim Page
Inspection for fire alarm permit not requested, life fire safety inspection cannot be completed until project related FIR permits are inspected and in the finaled status. This inspection request is cancelled.
FIRE-Final Inspection8/29/20178/30/20178/30/2017ACANC
DetailsJim Page
Inspection for fire alarm permit not requested, life fire safety inspection cannot be completed until project related FIR permits are inspected and in the finaled status. This inspection request is cancelled.
FIRE-Conference8/28/20178/29/20178/29/2017PDONE
DetailsJim Page
Fire conference complete.
BLD-Wall Bracing5/25/20175/25/20175/25/2017PPASS
DetailsMike Jordan
Sheetrock sheer inspection Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Wall cover5/17/20175/18/20175/18/2017APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance5/17/20175/18/20175/18/2017APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance5/15/20175/16/20175/16/2017ANR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Wall cover5/15/20175/16/20175/16/2017ANR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Framing/Rough-in5/10/20175/11/20175/11/2017APART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mike McHargue. Ok to insulate. majority of corrections completed. Needs to complete anchor bolts and patching 5/8 type x at trusses.
BLD-Framing/Rough-in5/9/20175/9/20175/9/2017PCANC
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Conference5/9/20175/9/20175/9/2017PDONE
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mike McHargue. Pre-framing walk through.
BLD-Wall cover4/12/20174/13/20174/13/2017APASS
DetailsJim Sly
Exterior Drywall on south end of building 5. Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Other4/12/20174/12/20174/12/2017PDEFR
DetailsTony Young
Exterior Drywall on south end of building 5. Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Wall Bracing4/7/20174/10/20174/10/2017APART
DetailsTony Young
Exterior Sheer Walls/Roof Phone #: ###-#### Inspection requested via web by Mike McHargue,, finishing up corrections,, ok to cover when verified by job super
BLD-Wall Bracing4/6/20174/7/20174/7/2017PPART
DetailsTony Young
Exterior Sheer Walls/Roof Phone #: ###-#### Inspection requested via web by Mike McHargue,, needs some nailing above straps,, also needs some more straps put on.. painted areas
BLD-Conference3/31/20174/3/20174/3/2017PDONE
DetailsJim Sly
Run through pre-rock / pre-insulation inspection process. Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Footing3/6/20173/7/20173/7/2017APASS
DetailsJim Sly
Interior thickend slap footings. Mid-Late morning if possible. Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance2/17/20172/21/20172/21/2017APASS
DetailsTony Young
Foundation Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue, foam inside foundation ok
BLD-Foundation2/16/20172/16/20172/17/2017PPASS
DetailsJim Sly
Dane Phone #: ###-####
Appears 02418 was aquired.
BLD-Footing1/24/20171/25/20171/25/2017APASS
DetailsTony Young
Dane Phone #: ###-####,, heat hoses in place
BLD-Footing1/18/20171/19/20171/19/2017PCANC
DetailsTony Young
dane Phone #: ###-####
BLD-Footing1/17/20171/18/20171/18/2017PNR
DetailsTony Young
Dane Phone #: ###-####
BLD-Footing1/13/20171/17/20171/17/2017PCANC
DetailsTony Young
dane Phone #: ###-####
BLD-Footing1/11/20171/12/20171/13/2017PCANC
DetailsTony Young
Dane Phone #: ###-####
BLD-Footing1/10/20171/11/20171/12/2017PNR
DetailsTony Young
Dane Phone #: ###-####
BLD-Footing1/6/20171/9/20171/10/2017PCANC
DetailsTony Young
dane Phone #: ###-####
BLD-Footing1/9/20171/10/20171/10/2017PCANC
DetailsTony Young
CANC inspection per Jerry Dane Phone #: ###-####
BLD-Footing1/3/20171/3/20171/3/2017PCANC
DetailsTony Young
Dane Phone #: ###-####
BLD-Footing12/29/201612/30/201612/30/2016PCANC
DetailsPhil Shearer
Dane Phone #: ###-####
BLD-Footing12/14/201612/15/201612/16/2016PNR
DetailsJim Sly
Dane Phone #: ###-####
No forms or humans on site.
BLD-Footing12/13/201612/14/201612/15/2016PNR
DetailsTony Young
Dane Phone #: ###-####
BLD-Conference12/14/201612/15/201612/14/2016ACANC
DetailsTony Young
Would like to run through the project to make sure any concerns are addressed. Thank you Michael McHargue Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue