Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD16-02418
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 6183 N GOODYEAR AVE
Project NameSilverCloud Apartments
Customer NumberBLD16-02408 - BLD16-02418
ePlanReview 
Description
(SILVERCLOUD APARTMENTS – BUILDING #6 – 6 APARTMENTS TOTAL WITH ONE TYPE A – TYPES D, A, B1, B1, A, B2) (DRH16-00080) (PUD16-00003) (11 PERMITS ARE FILED UNDER BLD16-02408 IN EPLANREVIEW) The NFPA 13R fire sprinkler system is used for occupancy. To construct a 2 story apartment building having 5 side-by-side 2 story dwelling units and one side-by-side 1 story dwelling unit. The dwelling units do not comply as townhomes as defined by the Boise City Code because there are no property lines between them and because the utilities are not separate. This building has a total floor area of about 12,208 square feet (7,250 square feet 1st story and 4,958 square feet 2nd story). Five dwelling units has 2 stories and one dwelling unit has 1 story. The 1 story dwelling unit is required to comply as a Type A dwelling unit. None of the 2 story dwelling units are required to comply as Type B dwelling units. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud exterior walls, exterior siding, shear walls, wood joist 2nd story floors, doors, windows, interior stairways, gas fireplaces, wood truss roof, roof coverings, millwork, and finishes. Engineered wood trusses are a deferred submittal item. Special Inspection is required for soils, shear walls, diaphragms, concrete, and post-installed anchors. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/17/20191/17/20191/25/2019 PEND
DetailsTony Young
BLD-Aging Inspection11/13/201811/13/201811/13/2018 PASS
DetailsTony Young
BLD-Aging Inspection9/11/20189/11/20189/18/2018 PEND
DetailsTony Young
BLD-Aging Inspection7/10/20187/10/20187/12/2018 PEND
DetailsTony Young
BLD-Aging Inspection5/8/20185/8/20185/8/2018 PEND
DetailsTony Young
BLD-Final3/7/20183/8/20183/8/2018APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue/// final ok pending others
BLD-Aging Inspection1/22/20181/22/20181/24/2018 PASS
DetailsTony Young
BLD-Aging Inspection11/20/201711/20/201711/28/2017 PASS
DetailsTony Young
BLD-Final9/18/20179/18/20179/18/2017APASS
DetailsTony Young
Contact: Hunter Gomez Phone #: ###-#### Inspection requested via web by Mike McHargue,, ok pending others
FIRE-Final Inspection9/11/20179/11/20179/11/2017APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete. Final life fire safety inspection passed/complete.
BLD-Wall Bracing6/13/20176/13/20176/13/2017PPASS
DetailsTony Young
Interior Drywall Nailing/Sheer Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance6/5/20176/5/20176/5/2017PPASS
DetailsMike Jordan
Interior Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance6/2/20176/5/20176/5/2017ACANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
BLD-Energy code compliance6/2/20176/2/20176/2/2017PNR
DetailsMike Jordan
Interior Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Framing/Rough-in5/31/20176/1/20176/1/2017APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue,, ok to insulate
BLD-Framing/Rough-in5/31/20175/31/20176/1/2017PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue,, working on corrections,, ok to insulate
BLD-Framing/Rough-in5/31/20176/7/20175/31/2017PCANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
BLD-Framing/Rough-in5/30/20175/31/20175/31/2017ANR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Framing/Rough-in5/30/20175/30/20175/30/2017PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue,, need trades 1st,, walk through only
BLD-Wall Bracing5/11/20175/12/20175/12/2017APASS
DetailsTony Young
Exterior Sheer Phone #: ###-#### Inspection requested via web by Mike McHargue,, exterior ok
BLD-Footing3/16/20173/17/20173/17/2017APASS
DetailsTony Young
Interior thickend slab footings, mid AM if possible Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance3/2/20173/3/20173/3/2017APASS
DetailsTony Young
Late AM if possible foundation insulation inspection Phone #: ###-#### Inspection requested via web by Mike McHargue,, foundation wall insulation ok,, slab on grade
BLD-Foundation2/28/20173/1/20173/1/2017PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Foundation2/28/20173/1/20173/1/2017PPASS
DetailsTony Young
Dane Phone #: ###-####
BLD-Foundation2/27/20172/28/20172/28/2017PNR
DetailsDave Hannah
Dane Phone #: ###-####
BLD-Footing2/24/20172/27/20172/27/2017APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mike McHargue