BLD-Aging Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | | PASS |
Jim Storey
|
|
|
zonning bond pending.
|
BLD-Aging Inspection | 11/26/2018 | 11/26/2018 | 11/26/2018 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 9/24/2018 | 9/24/2018 | 9/24/2018 | | DONE |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 7/23/2018 | 7/23/2018 | 7/23/2018 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
FIRE-Final Inspection | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
|
BLD-Final | 3/6/2018 | 3/7/2018 | 3/7/2018 | A | PART |
Jim Storey
|
|
|
Dave Phone #: ###-#### Received call from project owner Dave O’Neal regarding request for TCO on a single unit while field inspector correction items (smoke alarm placement) are being corrected. Let Dave know that if the structural field inspector is equally supportive relative to other correction items that may exist from the structural field inspector are satisfactory; the fire/life safety inspection group is OK with a single tenant initiating the move in process while the subject smoke alarm issue is being resolved by the licensed electrician. Once device is relocated, a final inspection request can be made. Contacted fire life safety field inspector to notify of discussion with owner. / handrail extention to be resolved with planreview// note per fire
|
BLD-Final | 3/5/2018 | 3/6/2018 | 3/6/2018 | P | DEFR |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
FIRE-Final Inspection | 3/5/2018 | 3/6/2018 | 3/6/2018 | A | PART |
Troy Cobbley
|
|
|
See note per Scott Arellano
Dave Phone #: ###-####
|
BLD-Aging Inspection | 12/1/2017 | 12/1/2017 | 12/4/2017 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Framing/Rough-in | 7/18/2017 | 7/18/2017 | 7/20/2017 | P | PASS |
Jim Storey
|
|
|
Dave ###-####
|
BLD-Framing/Rough-in | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | PART |
Jim Storey
|
|
|
Tony Phone #: ###-####slamers at exit/ gyp exit ceilling/ tub traps/ fur out at ceilling// ok to insulate upon hvac aprovals
|
BLD-Conference | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | PART |
Jim Storey
|
|
|
Tony Phone #: ###-#### duct penatration fresh air
|
BLD-Foundation | 5/8/2017 | 5/9/2017 | 5/9/2017 | P | PASS |
Jim Storey
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 5/5/2017 | 5/8/2017 | 5/8/2017 | P | PASS |
Jim Storey
|
|
|
Dane Phone #: ###-####
|
BLD-Wall Bracing | 3/17/2017 | 3/20/2017 | 3/20/2017 | A | PASS |
Jim Storey
|
|
|
Tony Phone #: ###-####
|