BLD-Final | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PASS |
Jim Sly
|
|
|
Please call me so I can let you in the house. Thanks Dylan ###-#### Phone #: ###-#### Inspection requested via web by Dylan Schneider
|
DOC - Permit Finaled | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | NR |
Jim Sly
|
|
|
Please call so I can let you in. Thanks Dylan ###-#### Phone #: ###-#### Inspection requested via web by Dylan Schneider Need handrail and egress ladder.
|
BLD-Energy code compliance | 11/10/2017 | 11/13/2017 | 11/13/2017 | A | PASS |
Tony Young
|
|
|
Please call Dylan at ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Dylan Schneider
|
BLD-Framing/Rough-in | 11/8/2017 | 11/9/2017 | 11/9/2017 | P | PART |
Brandon Shaw
|
|
|
1) Per engineering, tripple 1 3/4 X beam connector schedule not sat. Provide revised engineering 2) Squash blocks needed at interior bearing wall
OK to insulate
|
BLD-Wall Bracing | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | PASS |
Jim Sly
|
|
|
Dillon Phone #: ###-####
|
BLD-Footing | 8/29/2017 | 8/30/2017 | 8/30/2017 | P | PART |
Tony Young
|
|
|
Andy Phone #: ###-####,, work in progress,, ok after removing roots and finishing rebar
|
BLD - Request for Extension | 8/2/2017 | 8/2/2017 | 8/3/2017 | P | PASS |
Tony Young
|
|
|
Tony Phone #: ###-####
|