BLD-Final | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
DOC - Permit Finaled | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Window at landind needs to be tempered. Firestop penetrations in garage. Correction notice issued.
|
BLD-Blower Door Test Results | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
4.7
|
BLD-Final | 5/3/2018 | 5/3/2018 | 5/3/2018 | A | NR |
Brandon Shaw
|
|
|
Requesting late AM inspection. Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Energy code compliance | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Energy code compliance | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | FAIL |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Remove sheet rock for inspection.
|
BLD-Framing/Rough-in | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Ok to insulate. All framing issues resolved.
|
BLD-Framing/Rough-in | 11/7/2017 | 11/8/2017 | 11/8/2017 | P | FAIL |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Complete all fireblocking, install all missing break away clips on 2 hr. fire walls, complete the laydown parapets, repair all floor joist and provide truss engineering.
|
BLD-Wall Bracing | 10/19/2017 | 10/20/2017 | 10/20/2017 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Wall Bracing | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | PART |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Ok to tyvek exterior. Still missing floor to floor straps. Will install on top of tyvek and call for reinspection.
|
BLD-Wall Bracing | 9/29/2017 | 10/4/2017 | 10/4/2017 | A | NR |
Mike Jordan
|
|
|
Shear // Paul Phone #: ###-####
|
BLD-Foundation | 8/17/2017 | 8/17/2017 | 8/17/2017 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2082309827 >> Inspection requested via mobile web by Sam. Interior thickend footings.
|
BLD-Foundation | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | FAIL |
Mike Jordan
|
|
|
Sam Phone #: ###-####. reinforcement on interior thickend footings not per approved plans
|
BLD-Energy code compliance | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####. . Rigid insulation on stemwall under slab on grade.
|
BLD-Foundation | 8/1/2017 | 8/2/2017 | 8/2/2017 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 7/31/2017 | 8/1/2017 | 8/2/2017 | P | PASS |
Brandon Shaw
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 7/28/2017 | 7/31/2017 | 7/31/2017 | P | NR |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 7/28/2017 | 7/28/2017 | 7/28/2017 | P | NR |
Tony Young
|
|
|
Dane Phone #: ###-####
|
BLD-Framing/Rough-in | 7/27/2017 | 7/28/2017 | 7/28/2017 | P | NR |
Tony Young
|
|
|
Dane Phone #: ###-####
|