BLD-Final | 6/6/2018 | 6/6/2018 | 6/6/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
DOC - Permit Finaled | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 6/6/2018 | 6/6/2018 | 6/6/2018 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown.
6.8ACH @50pa.
|
BLD-Final | 6/5/2018 | 6/5/2018 | 6/5/2018 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Brown Inspection cancelled from web by: Sam Brown
|
BLD-Final | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | FAIL |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Provide tempered glazing in upstairs bathroom, handrail does not extend to point above loest riser.
|
BLD-Energy code compliance | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Framing/Rough-in | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Framing/Rough-in | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Brown Inspection cancelled from web by: Sam Brown
|
BLD-Framing/Rough-in | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Framing/Rough-in | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Fire block fur downs, complete laydown parapets, Nail off B04G truss as per the engineering. Strap beam to column connection.
|
BLD-Framing/Rough-in | 12/21/2017 | 12/22/2017 | 12/22/2017 | P | CANC |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Wall Bracing | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PASS |
Mike Jordan
|
|
|
Shear // Sam Phone #: ###-####
|
BLD-Wall Bracing | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | FAIL |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Missing floor to floor straps.
|
BLD-Wall Bracing | 11/7/2017 | 11/8/2017 | 11/8/2017 | P | PART |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Needs to install floor to floor straps.
|
BLD-Wall Bracing | 10/18/2017 | 10/18/2017 | 10/18/2017 | P | NR |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Foundation | 8/23/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Interior thickend footings ok.
|
BLD-Foundation | 8/23/2017 | 8/23/2017 | 8/23/2017 | P | NR |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Foundation | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | PASS |
Mike Jordan
|
|
|
insulation // Sam Phone #: ###-####. Rigid insulation.
|
BLD-Foundation | 8/7/2017 | 8/8/2017 | 8/8/2017 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 8/7/2017 | 8/7/2017 | 8/7/2017 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|