Permit Information
Permit NumberBLD16-02806
StatusTemporary Occupancy
Name PRIMARY CONSTRUCTION INC
Site Address 8600 W OVERLAND RD
Project NameWendy's
Customer Number 
ePlanReviewYes
Description
(WENDY’S) //PLAN MOD FOR MECHANICAL, NEW MECHANICAL ENGINEER AND DESIGN, DEFERRED SUBMITTAL NEW HOOD SHEETS 2-8-18**AJS**Plan modification to remove pressurized sewer system and add a gravity sewer system, revise interior plumbing to accommodate new sewer system. 6-30-2017 JG// Permit to construct a new 2,478 sq., ft. assembly building and related site improvements. Scope of work includes: construction of a slab on grade concrete foundation, construction of stud framed exterior envelope walls, roof construction, construction of interior non-bearing walls to create a dining area, two ADA accessible restrooms, a commercial kitchen, a walk-in cooler, a freezer, a storage area and an office, installation of new windows and accessible doors, new electrical, new mechanical, new plumbing, site work, and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. The building is not fire sprinklered. Note: Special Inspections Required see form 310. **JG** KR Sewer Comment: Connection to public sewer is contigent upon acceptance of the new sewer main constructino in Bird St. Occupancy will not be issued for the building prior to the City acceptance of the sewer main in Bird St.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other10/17/201910/21/201910/21/2019APEND
DetailsMike Jordan
Any thing left? Can permit be finaled? Appears that parking lot improvement to happen this spring. A grading permit is ready to be picked up.
BLD-Aging Inspection6/14/20196/14/20196/14/2019 PEND
DetailsMike Jordan
BLD-Aging Inspection4/5/20194/5/20194/5/2019 PEND
DetailsMike Jordan
BLD-Aging Inspection7/10/20187/10/20187/11/2018 PEND
DetailsMike Jordan
BLD-Aging Inspection4/10/20184/10/20184/10/2018 PEND
DetailsMike Jordan
called contractor, waiting on sunshade to be installed, per contractor should be in the next few days, then will be able to get zoning signed off. Also need public works, contractor noted some parking lot modifications that were done and waiting approval.
BLD-Final2/8/20182/9/20182/9/2018PPART
DetailsMike Jordan
Plumbing final should be signed in AM. Other finals complete for temporary CO. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm. Ok for temp occ. only.
FIRE-Final Inspection1/28/20181/29/20181/29/2018PPASS
DetailsTroy Cobbley
Life safety passed


Final reinspect. Items corrected per notes. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Final1/28/20181/29/20181/29/2018PCANC
DetailsMike Jordan
This inspection can not be completed until the issue with approved drawings/ design professional of record resolved. 1-29-18 Adele Griffin **Final inspection for temp CO. Outstanding items for plumbing are in process for resolution. Fire final 1/29 PM as well. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm
BLD-Final1/25/20181/26/20181/26/2018PCANC
DetailsMike Jordan
Trade finals in AM, temporary occupancy signoff Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
FIRE-Final Inspection1/25/20181/26/20181/26/2018AFAIL
DetailsTroy Cobbley
Provide address, provide permanant exit discharge lighting, mount the occupant load sign, provide testing of the duct smoke detectors.

Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Ceiling Grid Inspection1/23/20181/24/20181/24/2018PPASS
DetailsMike Jordan
Ceiling grid inspection for cover. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Conference1/18/20181/19/20181/19/2018ACANC
DetailsMike Jordan
Need to meet and walk through some questions on site in preparation for building final next week. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
BLD-Framing/Rough-in12/26/201712/26/201712/26/2017PPART
DetailsDave Hannah
Final shear for cover Phone #: ###-#### Inspection requested via web by Ryan Wilhelm shear ok
BLD-Wall cover12/12/201712/13/201712/13/2017APASS
DetailsMike Jordan
Interior framing for cover Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Energy code compliance12/12/201712/13/201712/13/2017APASS
DetailsMike Jordan
Insulation ; building envelope for cover Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Framing/Rough-in12/13/201712/13/201712/13/2017APASS
DetailsMike Jordan
Interior framing for cover Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Framing/Rough-in12/12/201712/13/201712/13/2017ACANC
DetailsMike Jordan
Finish shear for cover interior Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
BLD-Framing/Rough-in12/6/201712/6/201712/6/2017PPASS
DetailsMike Jordan
Shear wall inspection Phone #: ###-#### Inspection requested via web by Ryan Wilhelm. Exterior shear only ok.
BLD-Other12/5/201712/5/201712/5/2017PPASS
DetailsMike Jordan
Roof cover inspection Phone #: ###-#### Inspection requested via web by Ryan Wilhelm. Ok to cover roof.
BLD-Conference12/4/201712/4/201712/4/2017APART
DetailsMike Jordan
Courtesy pre-inspection meeting for framing/structural. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm. Needs to complete the exterior and interior shear walls. Needs more screws and button punch metal deck. Complete install of all straps. Reinspection required prior to exterior cover.
BLD-Concrete11/3/201711/3/201711/3/2017PPASS
DetailsMike Jordan
Inspect for slab pour. Later preferred if possible. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Concrete11/1/201711/1/201711/1/2017PCANC
DetailsMike Jordan
Slab vapor barrier/bar inspection Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
BLD-Foundation10/25/201710/25/201710/25/2017APASS
DetailsBrandon Shaw
Stem wall
BLD-Foundation10/23/201710/23/201710/23/2017PCANC
DetailsMike Jordan
Stem wall & bar inspect for late PM pour. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
BLD-Foundation10/20/201710/20/201710/20/2017PCANC
DetailsMike Jordan
Stem wall & bar inspection. Pour tentatively scheduled for 3pm, weather dependent. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
BLD-Footing10/17/201710/17/201710/17/2017PPASS
DetailsMike Jordan
perimeter footings ok.
BLD-Footing10/16/201710/17/201710/17/2017ANR
DetailsMike Jordan
Footing ; rebar inspection, concrete pour scheduled for 3pm Phone #: ###-#### Inspection requested via web by Ryan Wilhelm. rescheduled for pm inspection.
BLD-Footing10/15/201710/16/201710/16/2017PCANC
DetailsMike Jordan
Footing & bar inspection. Pour scheduled ~3:00pm. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
BLD-Aging Inspection8/7/20208/7/2020   
DetailsMike Jordan