Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD16-03304
StatusFinaled
Name LEVCO BUILDERS LLC
Site Address 1920 W JEFFERSON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Scope of work is repair home due to fire damage and remove and replace the entire roof system. During this process, the new roof will be made of attic trusses and the new floor plan upstair will include a bedroom, bathroom, storage a separate heating system. The main floor has been gutted and the walls will have new insulation and gyp, new kitchen, new code compliant stair leading to new upper level, new exterior side entrance, and new front porch. New windows shall comply with energy code and windows in bedrooms shall comply with egress requirements. Electrical, plumbing and mechanical permits will be pulled separately. Work will be performed per the approved plans, attached structural engineering and local codes. **DAF**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/18/20186/18/20186/18/2018PPASS
DetailsDave Hannah
Jesiah Phone #: ###-####
DOC - Permit Finaled6/18/20186/18/20186/18/2018PPASS
DetailsDave Hannah
BLD-Energy code compliance3/16/20183/16/20183/16/2018APASS
DetailsDave Hannah
BLD-Framing/Rough-in3/15/20183/15/20183/16/2018PPASS
DetailsDave Hannah
please call ahead for access, 30min - Josiah Phone #: ###-####
BLD-Framing/Rough-in2/28/20183/1/20183/1/2018APASS
DetailsDave Hannah
call acess- Steve Phone #: ###-#### ok to insulate
BLD-Framing/Rough-in2/26/20182/27/20182/27/2018PCANC
DetailsDave Hannah
Call 30 mins before // Steve Phone #: ###-####
BLD-Framing/Rough-in2/23/20182/23/20182/23/2018PNR
DetailsDave Hannah
Jesiha Phone #: ###-####
BLD-Conference2/2/20182/2/20182/2/2018PDONE
DetailsDave Hannah
Steve-please call 30 minutes prior to meet Phone #: ###-####
BLD-Framing/Rough-in1/5/20181/8/20181/8/2018PNR
DetailsDave Hannah
Steve-please call 30 minutes prior for access Phone #: ###-####
BLD-Foundation10/18/201710/19/201710/19/2017PPASS
DetailsDave Hannah
Mark Phone #: ###-####
BLD-Footing10/17/201710/18/201710/18/2017PPASS
DetailsDave Hannah
Mark Phone #: ###-####
BLD-Conference10/10/201710/11/201710/12/2017PDONE
DetailsDave Hannah
Please call ahead for access, 1hr - Steve Phone #: ###-####
BLD-Conference10/2/201710/3/201710/3/2017APASS
DetailsDave Hannah
after 10am // Steve Phone #: ###-####
BLD-Wall Bracing9/20/20179/20/20179/20/2017PPASS
DetailsDave Hannah
Steve Phone #: ###-####-please call 30 minutes prior to meet
BLD-Wall Bracing9/19/20179/19/20179/20/2017PNR
DetailsDave Hannah
Steve Phone #: ###-####-please call 30 minutes prior to meet
BLD-Framing/Rough-in9/19/20179/19/20179/20/2017PNR
DetailsDave Hannah
Stgeve Phone #: ###-####-please call 30 minutes prior to meet