Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD16-03440
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 8000 S FEDERAL WAY
Project NameMicron B51 R & D Facility
Customer NumberC24074
ePlanReviewYes
Description
C24074**Do not delete this number** (Micron B51 Shell and Core) **Project C24074**Do not delete this number** (Micron B51 Shell and Core) **Project Management _ Ron Hill** For completion of work not addressed under permit #16-03892. For the construction of a new one story building with a basement for a fabrication and R&D facility to include related site work. The building includes a 157,037 sq. ft. basement, a 170997 sq. ft. first story and a 33,638 sq. ft. equipment platform. This building is fully fire sprinklered and alarmed for H occupancy. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/31/20207/31/20208/3/2020PPASS
DetailsJim Storey
Dillan *screened* Phone #: ###-####
FIRE-Final Inspection7/29/20207/31/20207/31/2020APASS
DetailsJim Page
Fire sprinkler inspections are complete, fire alarm inspection is complete, fire extinguishers are placed throughout with current inspection tags. Final life fire safety inspection is complete, signatures provided on permit sign off card.

screened // Dillon Phone #: ###-####
FIRE-Conference6/16/20206/18/20206/18/2020ADONE
DetailsJim Page
Fire conference complete, notated items for life fire safety.

Phone #: ###-#### Inspection requested via web by Dillon Barresi
FIRE-Alarm Testing4/21/20204/23/20204/23/2020ADONE
DetailsJim Page
Fire alarm testing notes have been entered under permit FIR17-00178.

Fire Alarm Inspection for Micron Building 51. Phone #: ###-#### Inspection requested via web by Dillon Barresi
FIRE-Final Inspection10/11/201910/14/201910/14/2019PCANC
DetailsJim Page
Inspection request for fire alarms needs to be completed under the associated FIR permit, no the BLD permit. Per conversation with the point of contact listed this request is cancelled and the correct permit for the fire alarms will need to be requested for fire alarm inspections.

For Fire Alarm Final Phone #: ###-#### Inspection requested via web by Dillon Barresi
FIRE-Final Inspection10/11/201910/15/201910/14/2019ACANC
DetailsJim Page
For Fire Alarm Final Phone #: ###-#### >> Inspection requested via web by Dillon Barresi Inspection cancelled from web by: Dillon Barresi
BLD-Conference4/3/20194/3/20194/3/2019APEND
DetailsJim Storey
Expires: 05/23/18
BLD-Other2/13/20182/14/20182/14/2018APASS
DetailsJim Storey
Fire caulk inspection with Greg Phone #: ###-#### Inspection requested via web by Joel Hartman exterior penatrations glycol/ north west of 51/south west 50 exterior only ok to cover.
BLD-Other12/13/201712/13/201712/14/2017PDEFR
DetailsJim Storey
Fire caulking. Greg Baisch Phone #: ###-#### Inspection requested via web by Joel Hartmanout of time
BLD-Other12/13/201712/14/201712/14/2017APART
DetailsJim Storey
Fire caulking. Greg Baisch Phone #: ###-#### Inspection requested via web by Joel Hartman firestopping outstanding areas on file w/greg
BLD-Other12/1/201712/1/201712/1/2017PPASS
DetailsJim Storey
Greg Baisch, Fire caulking Phone #: ###-#### Inspection requested via web by Joel Hartman level 20 51 north/east res and other piping ok to cover
BLD-Other11/28/201711/28/201711/28/2017PFAIL
DetailsJim Storey
Fire caulking with Greg Baisch Phone #: ###-#### Inspection requested via web by Joel Hartman 50 need minrial wool/1/2 min// 51 exterior wire band exterior ok
BLD-Aging Inspection11/23/201711/23/201711/24/2017 PASS
DetailsJim Storey
BLD-Aging Inspection11/22/201711/22/201711/24/2017 PASS
DetailsJim Storey
BLD-Other11/9/201711/9/201711/9/2017PNR
DetailsJim Storey
Greg Baisch
NE Pipe penetrations at Level 40. Phone #: ###-#### Inspection requested via web by Joel Hartman north side nr/ genral walk thru
BLD-Other11/6/201711/6/201711/6/2017PPART
DetailsJim Storey
Greg Baisch
Penetrations through rated walls. Phone #: ###-#### Inspection requested via web by Joel Hartman south side of 51 parapet penatrations ok to finsh// north side need corected
BLD-Other10/25/201710/25/201710/25/2017PCANC
DetailsJim Storey
They are trying to get the pipes insulated on the east side penetrations through the rated wall Bldg 50/51. Could you take a look at them this afternoon. Contact Greg Baisch, ###-#### Phone #: ###-#### >> Inspection requested via web by Joel Hartman Inspection cancelled from web by: Joel Hartman
BLD-Conference8/17/20178/17/20178/17/2017PDONE
DetailsJim Storey
Meet to walk Stage C competition, East side Chem rooms. Erik Holinka''s phone number above. Phone #: ###-#### walk thru to verify microns protocall for chem rooms
BLD-Other8/16/20178/17/20178/17/2017ADEFR
DetailsJim Storey
Meet to walk Stage C competition, East side Chem rooms. Erik Holinka''s phone number above. Phone #: ###-#### Inspection requested via web by Joel Hartman
BLD-Other7/11/20177/12/20177/13/2017PPART
DetailsBob Archibald
TCO inspection Phone #: ###-#### Inspection requested via web by Joel Hartman. A "staged construction " review was conducted to addrerss exiting and rated construction for zone B51.1 the inspection was NOT to establish a Temp. CO.. Minor work is still required on fire rated construction ( stair enclosure, exit coridoor and building seperation) and egress systems (doors/hardware, landings stairways and exit signage). The contractor was informed of code provisions to complete rated wall construction, membrane/ through penetrations and rated door requirements. Provisions for maintaining clear paths of egress, door hardware, level landings and exit signage requirements. Exiting doors and means of egress into building 50 need to be addressed as these were originally exterior doors.
BLD-Other7/11/20177/12/20177/12/2017ADEFR
DetailsJim Storey
TCO inspection Phone #: ###-#### Inspection requested via web by Joel Hartman
FIRE-Final Inspection7/10/20177/11/20177/11/2017PPART
DetailsJim Page
Power transfer from normal power source to emergency power for egress lighting complete in TCO requested area (Northwest Basement level, level 1 and level 2 mechanical)
BLD-Other7/7/20177/10/20177/11/2017PNR
DetailsJim Storey
TCO Inspection Phone #: ###-#### Inspection requested via web by Joel Hartman
FIRE-Final Inspection7/6/20177/10/20177/10/2017APART
DetailsJim Page
James Phone #: ###-#### has punchlist items from life fire safety conference for TCO requested area, remaining items left to address for TCO reuqested area is the card read secure doors in the basment level and mech 30 level link between existing building and new building, these doors are part of the path of egress, door swing is going against the path of travel, door swing needs to be corrected.
BLD-Other6/1/20176/1/20176/1/2017ANH
DetailsJim Storey
Inspect blow-on fireproofing. This is for Greg Baisch. Phone #: ###-#### Inspection requested via web by Joel Hartman
BLD-Other5/30/20175/31/20176/1/2017PDEFR
DetailsDave Hannah
Inspect blow-on fireproofing. This is for Greg Baisch. Phone #: ###-#### Inspection requested via web by Joel Hartman
BLD-Other5/24/20175/25/20175/25/2017PPASS
DetailsJim Storey
Looking at fire penetrations. Phone #: ###-#### Inspection requested via web by Joel Hartman gas line penatrations ok to plate both sides as per listting and egineered listing.
BLD-Conference4/27/20174/28/20174/28/2017APASS
DetailsJim Storey
firestopping training for site personal by hilt book under assembly as to firestopping and ul for each tradei.
BLD-Conference4/13/20174/17/20174/17/2017ADONE
DetailsJim Storey
10:00 AM Phone #: ###-#### Inspection requested via web by Joel Hartman requiring firestopping submitals
BLD-Conference4/12/20174/14/20174/14/2017PDONE
DetailsJim Storey
appt: with paul walk about 1:30
BLD-Framing/Rough-in4/11/20174/11/20174/11/2017AFAIL
DetailsJim Storey
wall defeltion stud removal at duct pentrations/ fire stopping listings from all trades for penatrating idems and rattings, type of matrial used/door listings and aplactions 3 hr/ gyp to concrete rated joints.