BLD-Final | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | PASS |
Brandon Shaw
|
|
|
Mark Phone #: ###-####
|
DOC - Permit Finaled | 11/3/2017 | 11/3/2017 | 11/3/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 10/3/2017 | 10/4/2017 | 10/4/2017 | A | PASS |
Mike Jordan
|
|
|
Frank Phone #: ###-####
|
BLD-Framing/Rough-in | 9/28/2017 | 9/28/2017 | 9/28/2017 | P | PASS |
Tony Young
|
|
|
fRANK Phone #: ###-####,, garage ok
|
BLD-Wall Bracing | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | PASS |
Dave Hannah
|
|
|
Frank Aldana Phone #: ###-####
|
BLD-Foundation | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | PASS |
Brandon Shaw
|
|
|
Concrete at 10 // Adam Phone #: ###-####
|
BLD-Footing | 7/31/2017 | 7/31/2017 | 7/31/2017 | P | PASS |
Tony Young
|
|
|
Concrete at 1 // Adam Phone #: ###-####.. garage footings ok
|
BLD-Energy code compliance | 7/7/2017 | 7/10/2017 | 7/10/2017 | A | PASS |
Tony Young
|
|
|
Frank Aldana// insulation Phone #: ###-####
|
BLD-Framing/Rough-in | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | PASS |
Tony Young
|
|
|
Frank Aldana// 2nd insp for fireblocking and insulation Phone #: ###-####
|
BLD-Framing/Rough-in | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PASS |
Jim Sly
|
|
|
Mark Phone #: ###-#### Pass when all corrections completed....C/N posted. OK to insulate
|
BLD-Wall Bracing | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | PASS |
Brandon Shaw
|
|
|
Shear // Frank or ###-#### Carlos Phone #: ###-####
|
BLD-Other | 2/24/2017 | 2/24/2017 | 2/24/2017 | P | PEND |
Bob Archibald
|
|
|
New COA issued 2/1/17 for demolition of remaining structure. A new building permit and DRH required before verticle construction can resume
|
BLD-Foundation | 1/9/2017 | 1/9/2017 | 1/10/2017 | P | PART |
Tony Young
|
|
|
Rebar .... Call 15 mins before to meet // Rob Phone #: ###-####,, basement walls ok
|
BLD-Foundation | 12/21/2016 | 12/28/2016 | 12/28/2016 | P | CANC |
Phil Shearer
|
|
|
Rebar // Rob ###-####
|
BLD-Footing | 12/7/2016 | 12/7/2016 | 12/7/2016 | P | PASS |
Phil Shearer
|
|
|
Pour at 330 // JR Phone #: ###-####
|