Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD16-04117
StatusFinaled
Name BECK CONSTRUCTION INC
Site Address 1410 N HILTON ST
Project NameOrchard Place
Customer Number 
ePlanReviewYes
Description
(DEQ) This project consists of the construction of a 175 sq. ft. entry canopy at the Idaho Department of Environmental Quality (DEQ) staff entrance. Work includes the construction of four masonry columns and a roof structure with standing seam metal roofing. Exiting system shall be maintained throughout the course of construction. (Special inspections on the anchor bolts are required per ICC/ESR - 3187 & 2682) This building is fully fire sprinklered. **DAF**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/2/201711/2/201711/2/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Gary Beck
DOC - Permit Finaled11/2/201711/2/201711/2/2017PPASS
DetailsJim Sly
FIRE-Final Inspection10/30/201710/31/201710/31/2017APASS
DetailsTroy Cobbley
Life safety passed. The structural inspector verified the combustible concealed space is filled with insulation as per revious entry and the exterior is non-combustible so no sprinklers required per NFPA13 8.15
BLD-Final10/24/201710/25/201710/25/2017ANR
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Gary Beck
Need finals for....Fire sprinkler, fire life and Zoning.
BLD-Other9/28/20179/28/20179/29/2017PPASS
DetailsJim Sly
When inspector Jim Storey approved framing inspection, he requested we call for inspection of the drywall on the soffit of the canopy structure before we covered it with metal soffit. Phone #:


###-#### Inspection requested via web by Gary Beck
Verified 2 layers 5/8 firecode rock on lid.
BLD-Framing/Rough-in8/16/20178/17/20178/17/2017APASS
DetailsJim Storey
Please call Gary @ ###-#### 30 min prior to arrival. Thanks Phone #: ###-#### Inspection requested via web by Gary Beck

[External] ORCHARD PLACE DEQ ENTRY
GB
Gary Beck
Reply all|
Today, 3:31 PM
Jim Storey; +1 more
CAUTION: This email originated from an external entity. Do not click links, or open attachments, unless you recognize the sender and know the content is safe.

RE:
ORCHARD PLACE DEQ ENTRY
1410 N. HILTON STREET
BLD 16-04117

ATTENTION Boise City Building Inspector Jim Storey


Jim,

As per our conversation earlier today and NFPA code below, we have elected to blow the attic with non combustible insulation. Per our conversation we will provide a bag blow count. As discussed we will call for a soffit inspection after type x drywall is installed per approved plans.

Thanks for your help.

Gary
Beck Construction, Inc.

NFPA 13 code sections:



8.15.7 * Exterior
Projections.

8.15.7.1

Unless the requirements of 8.15.7.2, 8.15.7.3,
or 8.15.7.4 are
met, sprinklers shall be installed under exterior projections exceeding 4 ft (1.2 m) in width.

8.15.7.2 *

Sprinklers shall be permitted to be omitted where the exterior projections are constructed with materials that are noncombustible,
limited-combustible, or fire retardant–treated wood as defined in NFPA 703.

8.15.7.3

Sprinklers shall be permitted to be omitted from below the exterior projections of combustible construction,
provided the exposed finish material on the exterior projections are noncombustible, limited-combustible, or fire retardant–treated wood as defined in NFPA 703,
and the exterior projections contain only sprinklered concealed spaces or any of the following unsprinklered combustible concealed spaces:

(1)
Combustible concealed spaces filled entirely with noncombustible insulation

(2)
Light or ordinary hazard occupancies where noncombustible or limited-combustible ceilings are directly attached to the
bottom of solid wood joists so as to create enclosed joist spaces 160 ft3 (4.5 m3)
or less in volume, including space below insulation that is laid directly on top or within the ceiling joists in an otherwise sprinklered attic [see 11.2.3.1.4(4)(d)]

(3)
Concealed spaces over isolated small exterior projections not exceeding 55 ft2 (5.1 m2)
in area

8.15.7.4

Sprinklers shall be permitted to be omitted from exterior exit corridors when the exterior walls of the corridor are
at least 50 percent open and when the corridor is entirely of noncombustible construction.

8.15.7.5 *

Sprinklers shall be installed under exterior projections greater than 2 ft (0.6 m) wide over areas where combustibles
are stored.

BLD-Foundation7/17/20177/18/20177/18/2017APASS
DetailsJim Sly
early as poss // foundaiton wall // Jay Phone #: ###-####
BLD-Footing7/17/20177/17/20177/17/2017PPART
DetailsBrandon Shaw
BLD-Footing7/11/20177/12/20177/12/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Gary Beck
Special inspection Epoxy dowels.......rebar placement.....OK.
BLD-Conference7/6/20177/7/20177/7/2017ADONE
DetailsJim Sly
PLEASE CALL GARY @ ###-#### 30 MIN PRIOR TO ARRIVAL Phone #: ###-#### Inspection requested via web by Gary Beck