BLD-Aging Inspection | 5/27/2020 | 5/27/2020 | 5/27/2020 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/14/2020 | 1/14/2020 | 1/14/2020 | P | PASS |
Jim Storey
|
|
|
dillion
|
BLD-Final | 1/9/2020 | 1/10/2020 | 1/10/2020 | P | FAIL |
Jim Storey
|
|
|
dillon Phone #: ###-#### pw and achd no sig on card.
|
FIRE-Final Inspection | 12/19/2019 | 12/20/2019 | 12/20/2019 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete (fire alarm is with B51 fire alarm submittal, B51 fire aalrm permit will remain in issued status until fire alarm inspection for B51 is complete), fire extinguishers are placed with current inspection tags. Final life fire safety inspection for TCUP complete..
tea cup // Dillon Phone #: ###-####
|
FIRE-Final Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | FAIL |
Jim Page
|
|
|
Povide permit for fire alarm install as discussed.
Final for Fire/Life Safety - TCUP Phone #: ###-#### Inspection requested via web by Dillon Barresi
|
BLD-Conference | 4/3/2019 | 4/3/2019 | 4/3/2019 | A | PEND |
Jim Storey
|
|
|
Expires: 08/01/18
|
BLD-Aging Inspection | 2/2/2018 | 2/2/2018 | 2/2/2018 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Conference | 8/25/2017 | 8/25/2017 | 8/25/2017 | A | PASS |
Jim Storey
|
|
|
walk thru prep for final/ landings doors/equment tie down boliers
|