Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD17-00290
StatusFinaled
Name TK CONSTRUCTION
Site Address 554 N STEELHEAD WAY Unit: 184
Project NameProgressive Insurance
Customer Number 
ePlanReviewYes
Description
(PROGRESSIVE INSURANCE – BUILDING #4 – 1st FLOOR - SUITE #184) Permit to combine an existing 3,855 sq. ft. business space and expanding into 2,262 sq. ft. adjacent tenant space creating a total 6,117 sq. ft. business space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select millwork, removal of select suspended acoustic ceiling, removal of select plumbing fixtures, construction of new Interior nonbearing walls to create a conference room, an enclave room, a closet, a break room, two accessible restrooms to the disabled and open office areas, select new door/door frames, relocate a door/door frame to new converted office 103, select new millwork, select new gypsum ceiling, relocated light fixtures, plumbing work, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/3/20176/5/20176/5/2017APASS
DetailsJim Sly
Mike, Please call me when on way. Need a card to get into space. Thanks, Todd Phone #: ###-#### Inspection requested via web by Todd Kurns
OK for Perm Occ.
FIRE-Final Inspection6/2/20176/2/20176/2/2017PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final5/31/20176/1/20176/1/2017ANR
DetailsMike Jordan
Mike,

Make sure Troy has signed me off first. Thanks, Todd Phone #: ###-#### Inspection requested via web by Todd Kurns
FIRE-Final Inspection5/31/20176/1/20176/1/2017AFAIL
DetailsTroy Cobbley
Life safety will be ok to pass when the project related fire sprinkler permit is finaled
BLD-Final4/9/20174/10/20174/10/2017APART
DetailsMike Jordan
Mike,

I have troy scheduled first to do the fire life safety inspection. He should be complete by 10am. I will be at the space at 9am to unlock.

Thanks,
Todd Phone #: ###-#### Inspection requested via web by Todd Kurns. Ok to occupy east half only.
FIRE-Final Inspection4/9/20174/10/20174/10/2017APART
DetailsTroy Cobbley
Life safety passed for the east side expansion. Can not final until the doorway has been cut in and remaining construction finished.
BLD-Framing/Rough-in3/9/20173/13/20173/13/2017APART
DetailsMike Jordan
Todd Phone #: ###-####. INterior steel stud framed walls in expansion area only. Pending electrical and plumbing rough in inspections.