Information based on query as of Tuesday, May 14, 2024.
Permit Information
Permit NumberBLD17-00302
StatusFinaled
Name WRIGHT BROTHERS THE BLD CO
Site Address 1601 W STATE ST
Project NameMountain West Bank
Customer Number 
ePlanReviewYes
Description
(MOUNTAIN WEST BANK) The project includes construction of a 1784 SF addition to the existing bank building. The addition and remodel will allow for services to be moved from the basement and will provide greater accessibility to the patrons of the bank. Improvements include reduction of parking based on City requirements and removal of existing curb cuts for safer traffic flow. Site improvements were submitted previously.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/4/20181/5/20181/5/2018APASS
DetailsBrandon Shaw
Mark Phone #: ###-####
DOC - Permit Finaled1/5/20181/5/20181/5/2018PPASS
DetailsBrandon Shaw
BLD-Final12/1/201712/1/201712/1/2017PPART
DetailsDave Hannah
for temp occ // Mark Phone #: ###-#### ok for temp occ
BLD-Ceiling Grid Inspection11/30/201711/30/201711/30/2017PPASS
DetailsDave Hannah
Mark-in basement Phone #: ###-####
FIRE-Final Inspection11/28/201711/29/201711/29/2017APASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Ceiling Grid Inspection11/20/201711/21/201711/21/2017APASS
DetailsDave Hannah
Mark Phone #: ###-####
BLD-Energy code compliance10/26/201710/27/201710/27/2017APASS
DetailsJim Storey
Mark Phone #: ###-#### rim at high ceilling insulated above windows ok to cover soffits
BLD-Energy code compliance10/13/201710/13/201710/13/2017PPASS
DetailsTony Young
Mark Phone #: ###-####
BLD-Energy code compliance10/10/201710/11/201710/12/2017APASS
DetailsDave Hannah
Please call ahead for access - Mark Phone #: ###-####
BLD-Framing/Rough-in10/5/201710/9/201710/9/2017APASS
DetailsBrandon Shaw
OK to insulate
BLD-Framing/Rough-in9/12/20179/12/20179/12/2017PPART
DetailsTony Young
Mark-Roof-framing Phone #: ###-####,, roof straps on south end to tie across trusses ok
BLD-Wall Bracing8/28/20178/29/20178/30/2017APASS
DetailsDave Hannah
Mark Phone #: ###-####
FIRE-Conference7/3/20177/5/20177/5/2017ADONE
DetailsTroy Cobbley
Mark and I discussed the removal of an old sprinkler system in the basement. I deferred him to a demo permit. The existing system consists of two upright heads in the mechanical room with a flow switch, alarm bell in the room and a quarter turn valve locked open. The 1" piping is fed from a 3/4" feed. I could not find any old permits for this work and there are no annual inspection tags.
BLD-Foundation6/26/20176/26/20176/26/2017PPASS
DetailsDave Hannah
Rebar // Mark Phone #: ###-####
BLD-Foundation6/19/20176/20/20176/20/2017PPASS
DetailsTony Young
Rebar // Catrina Phone #: ###-####