Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD17-00692
StatusIssued
Name ST LUKES HEALTH SYSTEM LTD
Site Address 201 W JEFFERSON ST
Project NameSt Lukes office - Larsen house
Customer Number 
ePlanReviewYes
Description
(ST. LUKE’S HEALTH SYSTEM OFFICES – LARSEN HOUSE – HOUSE CONVERSION TO OFFICE) (DRH17-00040) (10-10-17 PLAN MODIFICATION TO REMOVE THE GARAGE AT THE ALLEY TO AND INSTALL ADDITIONAL PARKING IN ITS PLACE.) (6-23-17 PLAN MODIFICATION TO MOVE COLUMNS ON THE ARCHITECTURAL DRAWINGS TO MATCH THE COLUMN LOCATIONS ON THE STRUCTURAL DRAWINGS, TO INSTALL GYPSUM BOARD CEILINGS WITH SOUND INSULATION IN THE BASEMENT INSTEAD OF HAVING THE FLOOR JOISTS EXPOSED, TO INSTALL SUSPENDED ACOUSTICAL CEILING IN SELECT AREAS ON THE 1ST STORY AND ON THE 2ND STORY INSTEAD OF INSTALLING GYPSUM BOARD CEILING, AND TO NOTE ON THE DRAWINGS WHICH WINDOWS ARE FIXED AND WHICH ARE OPERABLE.) This building does not have a fire sprinkler system. To convert an existing 8,294 square foot house (1,712 square foot basement, 3,200 square foot 1st story including the 870 square foot garage and breezeway, 2,209 square foot 2nd story, and 1,173 square foot unoccupied attic) to an office building. All residential uses will be abandoned. This building is NOT approved to be used as a medical office building where patients are examined or treated. Work is to include interior concrete footings, wood columns, wood beams, wood headers, interior nonbearing walls, interior doors, four restrooms accessible to the disabled, an exterior wheelchair lift, an accessible parking space, an exterior concrete stairway and landing, new exterior windows, and interior finishes. Several bearing walls will be replaced with beams and columns. Special Inspection is required for soils and for concrete. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/16/20206/16/20206/16/2020PPASS
DetailsDave Hannah
Kelley *screened* Phone #: ###-####
BLD-Framing/Rough-in1/24/20191/25/20191/25/2019ACANC
DetailsDave Hannah
BLD-Framing/Rough-in1/23/20191/24/20191/24/2019ADEFR
DetailsBrandon Shaw
Interior wall framing level 4; shaft wall framing L5-L2; please call Superintendent - Jamal Nelson, 15min prior to arrival Phone #: ###-#### Inspection requested via web by Jamal Nelson
BLD-Final11/1/201811/2/201811/2/2018APASS
DetailsDave Hannah
Kelly Phone #: ###-####
BLD-Final8/17/20188/17/20188/17/2018PPART
DetailsDave Hannah
Kelly Phone #: ###-#### ok for temp occ neeedsto fix handrails ada rest rooms ada lift signage
FIRE-Final Inspection7/9/20187/10/20187/10/2018PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.

Kelly Phone #: ###-####
BLD-Ceiling Grid Inspection6/25/20186/25/20186/25/2018PPASS
DetailsTony Young
Kelly Phone #: ###-####
BLD-Ceiling Grid Inspection6/20/20186/21/20186/21/2018AFAIL
DetailsDave Hannah
Kelly Phone #: ###-####
BLD-Wall cover3/12/20183/13/20183/13/2018APASS
DetailsDave Hannah
Kelly Phone #: ###-#### insulation ok
BLD-Energy code compliance3/9/20183/9/20183/9/2018PPART
DetailsJim Storey
Kelly Phone #: ###-#### basement ok for insulation// fire blk missing 1 st floor
BLD-Wall cover1/16/20181/16/20181/16/2018PPASS
DetailsDave Hannah
Kelly Phone #: ###-#### ok to insulate /air seal
BLD-Wall cover12/18/201712/19/201712/19/2017APEND
DetailsDave Hannah
Kelly Phone #: ###-#### needs trade r/i and air seal