Permit Information
Permit NumberBLD17-00857
StatusFinaled
Name MACHINERY WEST INC
Site Address 2429 W BANK DR
Project NameLight Mission Pentecostal
Customer Number 
ePlanReviewYes
Description
(LIGHT MISSION PENTECOSTAL - CHURCH) (CUP16-00096) (12-10-18 PLAN MODIFICATION TO RE-DESIGN THE TOILET ROOMS FROM WHAT WAS ORIGINALLY APPROVED. BOTH TOILET ROOMS ARE STILL REQUIRED TO BE FULLY ACCESSIBLE TO THE DISABLED. EACH TOILET ROOM WILL BE A SINGLE-USER TOILET ROOM WITH LEVER-TYPE PRIVACY LOCKING HARDWARE ON EACH TOILET ROOM DOOR. THE “HIGH” AND “LOW” DRINKING FOUNTAINS WILL BE RELOCATED FROM WHAT WAS ORIGINALLY APPROVED. A 281 SQUARE FOOT STAGE WILL ALSO BE PROVIDED. THE STAGE IS NOT REQUIRED TO BE SERVED BY A ROUTE ACCESSIBLE TO THE DISABLED. AN EXTERIOR CONCRETE LANDING (4” MINIMUM HEIGHT) AND SIDEWALKS (5% MAXIMUM SLOPE) WILL BE PROVIDED AT THE NORTH EXTERIOR ENTRANCE DOOR. THE INTERIOR VESTIBULE AT THAT DOOR WILL BE REMOVED.) (8-8-17 PLAN MODIFICATION TO REMOVE INTERIOR NONBEARING WALLS TO EXPAND THE SANCTUARY TO ALLOW NATURAL LIGHT INTO THE SPACE. THE TOTAL OCCUPANT LOAD IS STILL LIMITED TO 100 BY THE PLANNING DIVISION. THE CEILING WILL BE REMOVED AND THE ROOF STRUCTURE ABOVE WILL BE EXPOSED TO THE ROOM BELOW. NEW LIGHT FIXTURES AND DUCTS WILL BE INSTALLED.) This building does not have a fire sprinkler system. To convert an existing 4,089 square foot, one story building to a church and remodel it for the new tenant. Work is to include upgrading two existing restrooms to be accessible to the disabled, constructing a platform served by steps with handrails, panic hardware, emergency lighting, and exit signs. The maximum occupant load is limited to 100 per the Conditional Use Permit. New roof top HVAC units are not allowed to weigh more than the units they replace unless a structural evaluation of the roof is done. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/15/20191/15/20191/15/2019PPASS
DetailsJim Storey
Tim Phone #: ###-####
BLD-Final1/3/20191/4/20191/4/2019AFAIL
DetailsJim Storey
Tim-call for access Phone #: ###-#### panic hardware at east double doors/ handrails at stage both sides/ occ load sign 100
BLD-Conference11/20/201811/27/201811/27/2018APART
DetailsJim Storey
call 15 mins ahead or call to let them know if you can''t make it - Joe Phone #: ###-#### need to build out per aproved plan
BLD-Conference11/19/201811/20/201811/20/2018PCANC
DetailsBrandon Shaw
call 15 mins ahead or call to let them know if you can''t make it - Joe Phone #: ###-####
BLD-Conference11/14/201811/15/201811/15/2018PDEFR
DetailsJim Storey
call 20 mins heads- Joe Phone #: ###-#### issues to be resolved with planreview/ no time to conf due to work load.
BLD-Other9/28/20189/28/20189/28/2018PFAIL
DetailsJim Storey
not aproved for use open permits.
BLD-Aging Inspection9/14/20189/14/20189/14/2018 PASS
DetailsJim Storey
wip
BLD-Aging Inspection9/13/20189/13/20189/14/2018 PASS
DetailsJim Storey
wip
FIRE-Final Inspection5/2/20185/2/20185/2/2018PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers are in place with current inspection tags, maximum occupancy placard will be placed in discussed location, final life fire safety inspection complete.

Call ahead to meet // Scott Phone #: ###-####
BLD-Aging Inspection4/12/20184/12/20184/12/2018 PASS
DetailsJim Storey
pending ele
BLD-Framing/Rough-in11/28/201711/29/201711/29/2017APASS
DetailsJim Storey
Dale Phone #: ###-#### platforms ok to cover