BLD-Final | 9/19/2018 | 9/20/2018 | 9/20/2018 | A | PASS |
Jim Sly
|
|
|
Please call // Micheal Phone #: ###-####
|
DOC - Permit Finaled | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 6/4/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Dave Hannah
|
|
|
Michael Phone #: ###-####
|
BLD-Framing/Rough-in | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | NH |
Brandon Shaw
|
|
|
No access to garage Need Engineering for hold downs as previously stated
|
BLD-Wall Bracing | 1/31/2018 | 1/31/2018 | 2/1/2018 | P | PART |
Dave Hannah
|
|
|
Michael Phone #: ###-#### needs engineering on front and back holddowns in wrong spots ok to rap sides
|
BLD-Framing/Rough-in | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | NR |
Dave Hannah
|
|
|
micheal Phone #: ###-#### needs plans on site and resubmit plan to show finishing up stairs
|
BLD-Wall Bracing | 4/28/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Wall Bracing | 4/27/2017 | 4/27/2017 | 4/28/2017 | P | NR |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|