Permit Information
Permit NumberBLD17-01025
StatusFinaled
Name CM COMPANY
Site Address 2770 S VISTA AVE
Project NameIdaho Central Credit Union
Customer Number 
ePlanReviewYes
Description
(IDAHO CENTRAL CREDIT UNION) ""Plan modification to add a door and related glazing to the NW stairs.""" Permit for the construction of a new 12,823 sq. ft. building with work to include general site work and the construction of the new building. The existing 6,400 sq. ft building is being demolished. This building is fully fire sprinklered and alarmed. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/15/20188/15/20188/15/2018PPASS
DetailsJim Storey
Tom Phone #: ###-#### final ok pending others
FIRE-Final Inspection8/14/20188/15/20188/15/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete.

Tom Phone #: ###-####
FIRE-Final Inspection8/13/20188/14/20188/14/2018ACANC
DetailsTroy Cobbley
Life safety will be ok to pass when the project related fire alarm and fire sprinkler permits are finaled.


Tom Phone #: ###-####
BLD-Final8/10/20188/13/20188/13/2018ACANC
DetailsJim Storey
Tom Phone #: ###-####
BLD-Ceiling Grid Inspection7/18/20187/18/20187/18/2018PPASS
DetailsMike Jordan
2nd floor // Tom Phone #: ###-####
BLD-Ceiling Grid Inspection6/25/20186/25/20186/25/2018PPASS
DetailsJim Storey
Tom Phone #: ###-####
BLD-Framing/Rough-in6/7/20186/7/20186/7/2018PPASS
DetailsJim Storey
Tom Phone #: ###-#### 2nd floor ok
BLD-Energy code compliance5/10/20185/11/20185/11/2018APART
DetailsBrandon Shaw
Second floor exterior walls to window sill and South East stair landing
BLD-Energy code compliance4/24/20184/25/20184/25/2018APASS
DetailsJim Storey
roof insulation // Tom Phone #: ###-#### c/n made good// insulation ok to cover
BLD-Energy code compliance4/23/20184/23/20184/23/2018PPEND
DetailsDave Hannah
roof insulation // ###-#### Tom spray on insulation ok but need to remove paper backed insulation
BLD-Energy code compliance4/13/20184/13/20184/13/2018PPART
DetailsJim Storey
Tom Phone #: ###-#### 1st floor ok
BLD-Framing/Rough-in4/9/20184/9/20184/9/2018PPASS
DetailsJim Storey
elevator shaft-Tom Phone #: ###-####first floor ok
BLD-Wall Bracing3/30/20184/2/20184/2/2018APASS
DetailsJim Storey
Tom Phone #: ###-#### sheer walls at drive thru as well as frame ok ok to cover.
BLD-Other3/20/20183/21/20183/21/2018APASS
DetailsBrandon Shaw
roof shear for drive-thru
BLD-Other3/16/20183/16/20183/16/2018PPASS
DetailsJim Storey
roof nailing // Tom Phone #: ###-####
BLD-Other3/5/20183/6/20183/6/2018APASS
DetailsJim Storey
Tom-inspection to look at the metal trusses to cover Phone #: ###-#### wip truss framing ok to cover
BLD-Other2/21/20182/22/20182/22/2018APASS
DetailsJim Storey
Tom-exterior stud framing-this has nothing to do with the plan mod that''s in for review Phone #: ###-#### exterior framing ok to start cover/
BLD-Other1/25/20181/26/20181/26/2018PPART
DetailsJim Storey
Welding - Tom Phone #: ###-#### work in progress/ need to finsh si insp.
BLD-Foundation11/21/201711/21/201711/21/2017PPASS
DetailsJim Storey
insulation for foundation - Tom Phone #: ###-####
BLD-Foundation11/9/201711/9/201711/9/2017PPART
DetailsJim Storey
Tom Phone #: ###-#### placed w/si pending report
BLD-Footing10/26/201710/27/201710/27/2017PPASS
DetailsJim Storey
footing rebar // Tom Phone #: ###-#### ok pending si report for compaction/rebar and concrete