Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberBLD17-01238
StatusFinaled
Name EKC INC
Site Address 246 N 8TH ST
Project NameBCRFL Basement
Customer Number17-013
ePlanReviewYes
Description
(BITTERCREEK – RED FEATHER LOUNGE) //Plan modification to reduce the recess floor area, reroute the overhead plumbing and under slab conduit lines. 10-17-2017 // **The fire sprinkler system is used to substitute for 1-hr fire-resistance-rated construction of the building. Includes Code Alternate approval for ceiling heights and step at mechanical room door. Permit is to remove the existing concrete slab, recess the floor and pour new slab in the basement corridor to create a code compliant egress path for exiting in the basement. Special Inspection is required for post-installed anchors in concrete (e.g. expansion bolts, epoxied rebar) and for welding. Additional engineering may be required pending excavation of existing floor. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/14/201811/15/201811/15/2018APASS
DetailsDave Hannah
The basement electrical was tied to the Diablo ; Sons permit which is why we requested a temp occupancy for the basement. Now that the electrical has been signed off under building permit BLD17-02185 for Diablo ; Sons we can now final out and close the basement permit. Thanks. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
BLD-Aging Inspection10/26/201810/26/201811/2/2018 PEND
DetailsDave Hannah
BLD-Final8/6/20188/7/20188/7/2018PPART
DetailsDave Hannah
Dale Phone #: ###-#### ok for temp occ down stiars
FIRE-Final Inspection8/6/20188/7/20188/7/2018APASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Dale Phone #: ###-####
FIRE-Final Inspection8/3/20188/6/20188/6/2018AFAIL
DetailsJim Page
Repair or replace exit sign that is hanging by its wires.

Dale Phone #: ###-####
BLD-Framing/Rough-in4/3/20184/4/20184/4/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Brandon McCurdy basement ok to cover
BLD-Other12/19/201712/19/201712/20/2017PPART
DetailsDave Hannah
Fire/Life Safety has signed off. We are ready for a temp occupancy inspection for use of the Basement Prep Rm. All other trade inspections (i.e. Plumbing ; Electrical) have pass and granted tempCofO''s. Phone #: ###-#### Inspection requested via web by Brandon McCurdy ok for temp occ on food prep area in basemnt
BLD-Other12/19/201712/20/201712/19/2017ACANC
DetailsDave Hannah
We are ready for a temp occupancy inspection to seek permission to occupy/use the Basement Prep Room. The Fire/Life Safety re-inspection is schedule for Tuesday PM. All of trade inspections (i.e. Plumbing & Electrical) have passed and temp occupancies have been granted. Thanks. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy Inspection cancelled from web by: Brandon McCurdy
FIRE-Final Inspection12/19/201712/19/201712/19/2017PPART
DetailsJim Page
Fire sprinkler work complete for TCO requested area, fire extinguishers are in place with current inspection tags. Life fire safety inspection for TCO requested area (Prep litchen, coolers and corridor basement level) complete.
BLD-Other12/19/201712/20/201712/19/2017PCANC
DetailsDave Hannah
We are ready to have temporary occupancy request inspection to obtain permission to use the Basement Prep Room. The Fire/Life Safety re-inspection is schedule for Wednesday AM. All other trade inspection (i.e. Plumbing & Electrical) have granted temp occupancies. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy Inspection cancelled from web by: Brandon McCurdy
FIRE-Final Inspection12/19/201712/20/201712/19/2017ACANC
DetailsJim Page
We are ready for a re-inspection for Fire/Life Safety to obtain a temporary occupancy for the basement Prep Room. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy Inspection cancelled from web by: Brandon McCurdy
BLD-Conference12/15/201712/15/201712/16/2017PPASS
DetailsDave Hannah
We need to review a new sprinkler main that has to be installed below 6''8". Theoretically the new line falls outside of the proposed path of egress as indicated on the plans. However, to play it safe, Bruce Poe (Architect) wanted me to have you take a look at it before we get too carried away. Thanks. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
BLD-Conference12/13/201712/14/201712/14/2017PCANC
DetailsDave Hannah
We are schedule to have out Fire Life Safety and Fire Sprinkler inspections during the morning. I''m hoping to be granted a TCO for the Basement Prep Rm. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy Inspection cancelled from web by: Brandon McCurdy
FIRE-Conference12/13/201712/14/201712/14/2017AFAIL
DetailsJim Page
Path of egress is more than what was shown on the proposed TCO plan submitted to Jason Blais, coolers are being used so corridor from coolers to stairs is to be included for egress purposes, fire sprinklers will need to be added to basement corridor before TCO can be approved for life fire safety. Sheetrock will need to be installed on corridor wall to seperate area still under construction (area of seperation is where the fire sprinkler system is impaired) from the noted path of egress before TCO can be approved for life fire safety. A fire watch will be required for area's where the fire sprinkler system has been impaired while building is occupied or active fire sprinkler protection will need to be put in the area where the sprinkler piping was removed before TCO can be approved for life fire safety. TCO required items have been discussed with Scott Arellano and Ron Johnson and they are in aggreement for the items mentioned to be completed before TCO can be approved for requested areas.
BLD-Conference12/7/201712/8/201712/8/2017ADONE
DetailsDave Hannah
Anytime after 9:30 am. Please call me first as the Architect wants to walk the site with us. Thanks. Phone #: ###-#### Inspection requested via web by Brandon McCurdy